Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington

Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington

What Is Form ECY040-138?

This is a legal form that was released by the Washington State Department of Ecology - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form ECY040-138?
A: Form ECY040-138 is a checklist used for reviewing solid waste permit applications related to surface impoundments and tanks in Washington.

Q: What does the checklist include?
A: The checklist includes various sections covering information about the facility, waste management practices, monitoring and reporting requirements, and closure and post-closure plans.

Q: Why is this checklist used?
A: This checklist is used to ensure that solid waste permit applications for surface impoundments and tanks comply with the relevant regulations and requirements in Washington.

Q: Who uses this checklist?
A: This checklist is used by environmental agencies and officials responsible for reviewing and approving solid waste permit applications in Washington.

Q: What are some key areas covered in the checklist?
A: Some key areas covered in the checklist include containment systems, liner and leachate collection, groundwater monitoring, closure and post-closure plans, and emergency response measures.

Q: Is this checklist specific to Washington state only?
A: Yes, this checklist is specific to solid waste permit applications in Washington state.

Q: What should be included in a solid waste permit application for surface impoundments and tanks?
A: A solid waste permit application should include detailed information about the facility's design, operation, monitoring, closure plans, and compliance with environmental regulations.

Q: What happens after a solid waste permit application is reviewed using this checklist?
A: After a solid waste permit application is reviewed using this checklist, the environmental agency will determine whether to approve or deny the permit based on compliance with regulations and requirements.

Q: What are some potential consequences of non-compliance with the checklist requirements?
A: Non-compliance with the checklist requirements may result in denial of the solid waste permit application or the need for the facility to make necessary modifications to meet the requirements before the permit is approved.

ADVERTISEMENT

Form Details:

  • Released on January 1, 2003;
  • The latest edition provided by the Washington State Department of Ecology;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;

Download a printable version of Form ECY040-138 by clicking the link below or browse more documents and templates provided by the Washington State Department of Ecology.

Download Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington

4.7 of 5 (80 votes)
  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington

    1

  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 2

    2

  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 3

    3

  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 4

    4

  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 1
  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 2
  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 3
  • Form ECY040-138 Surface Impoundments and Tanks Checklist for Review of Solid Waste Permit Application - Washington, Page 4
Prev 1 2 3 4 Next
ADVERTISEMENT

Related Documents