Form BEST 4 Application for Best Recommendation for Mechanical Means Demolition - New York City

Form BEST4 is a New York City Department of Buildings form also known as the "Application For Best Recommendation For Mechanical Means Demolition". The latest edition of the form was released in July 1, 2008 and is available for digital filing.

Download a fillable PDF version of the Form BEST4 down below or find it on New York City Department of Buildings Forms website.

ADVERTISEMENT
BEST USE ONLY
APPLICATION FOR BEST RECOMMENDATION FOR
DEMOLITION #
MECHANICAL MEANS DEMOLITION
Application must be typewritten.
Structure and Location Information:
Number of structures at this address you intend to demolish (a separate application is required for each):
Name:
Company:
Fax:
E-mail:
Phone:
Application date:
Bronx
Brooklyn
Manhattan
Queens
Staten Island
Structure type (check only one):
House
Garage
Shed
Commercial Building
Other:
Building address:
Block:
Lot:
Cross streets:
BIN:
All AKA’s (“Also-Known-As”, if applicable):
BIS job # for demolition (DM) filing:
Other related BIS job #s:
Distance from nearest street corner (in feet):
Mechanical Means Information:
Description of mechanical equipment proposed for demolition:
Requesting full mechanical demolition
Requesting partial mechanical demolition
A plot plan must accompany this request. It must show:
the size of the lot, the size, location and height of all structures on the lot of adjacent structures
the structures which are to be demolished and the structures or portions thereof which are to be demolished by
mechanical means
the construction classification of the building to be demolished
the mechanical means to be used( type of machinery) and proposed location of it
the safety zone
the location of the sidewalk shed, fences and other protective construction
the width of the adjoining street
Agreement and Signature:
By signing below, I agree that if issued a mechanical means permit:
A construction fence will be erected along the perimeter of job site. No persons other than the operator of the
equipment will be permitted within the safety zone of demolition while the mechanical means method of
demolition is in use. No part of the equipment, when in use will extend beyond the permitted boundaries. Letter
of Request, Letter of Permission and Plot Plan must be available on the premises during course of demolition.
All Building Department regulations will be followed when performing the demolition in accordance with Chapter
19 Article 6, section 27-1039d.
All hand demolition will be completed and inspected by B.E.S.T. prior to commencement of any Mechanical
demolition
Print Name:
Title:
Company:
Signature:
Date:
Approved
Disapproved
BEST Use Only
Reviewed by:
Signature:
Badge #
Date:
Supervisor:
Signature:
Badge #
Date:
Comments:
safety ● service ● integrity
BEST4 (7/08)
BEST USE ONLY
APPLICATION FOR BEST RECOMMENDATION FOR
DEMOLITION #
MECHANICAL MEANS DEMOLITION
Application must be typewritten.
Structure and Location Information:
Number of structures at this address you intend to demolish (a separate application is required for each):
Name:
Company:
Fax:
E-mail:
Phone:
Application date:
Bronx
Brooklyn
Manhattan
Queens
Staten Island
Structure type (check only one):
House
Garage
Shed
Commercial Building
Other:
Building address:
Block:
Lot:
Cross streets:
BIN:
All AKA’s (“Also-Known-As”, if applicable):
BIS job # for demolition (DM) filing:
Other related BIS job #s:
Distance from nearest street corner (in feet):
Mechanical Means Information:
Description of mechanical equipment proposed for demolition:
Requesting full mechanical demolition
Requesting partial mechanical demolition
A plot plan must accompany this request. It must show:
the size of the lot, the size, location and height of all structures on the lot of adjacent structures
the structures which are to be demolished and the structures or portions thereof which are to be demolished by
mechanical means
the construction classification of the building to be demolished
the mechanical means to be used( type of machinery) and proposed location of it
the safety zone
the location of the sidewalk shed, fences and other protective construction
the width of the adjoining street
Agreement and Signature:
By signing below, I agree that if issued a mechanical means permit:
A construction fence will be erected along the perimeter of job site. No persons other than the operator of the
equipment will be permitted within the safety zone of demolition while the mechanical means method of
demolition is in use. No part of the equipment, when in use will extend beyond the permitted boundaries. Letter
of Request, Letter of Permission and Plot Plan must be available on the premises during course of demolition.
All Building Department regulations will be followed when performing the demolition in accordance with Chapter
19 Article 6, section 27-1039d.
All hand demolition will be completed and inspected by B.E.S.T. prior to commencement of any Mechanical
demolition
Print Name:
Title:
Company:
Signature:
Date:
Approved
Disapproved
BEST Use Only
Reviewed by:
Signature:
Badge #
Date:
Supervisor:
Signature:
Badge #
Date:
Comments:
safety ● service ● integrity
BEST4 (7/08)

Download Form BEST 4 Application for Best Recommendation for Mechanical Means Demolition - New York City

562 times
Rate
4.7(4.7 / 5) 39 votes
ADVERTISEMENT