Form (TM 118B – Revision Nov 2017)
Annual Operating Plan (AOP) Submission
Commercial Timber Permits
TIMBER PERMIT NUMBER:
_______________________________
PERMITTEE NAME:
____________________________________
OPERATING PERIOD:
_____ /_____ /_____ TO _____ /_____ /_____ (MM/DD/YY)
GENERAL DEVELOPMENT PLAN (for allocated permits only):
ESTIMATED
5 YEAR PROPOSED PRODUCTION SCHEDULE
HARVESTED
REMAINING
SPECIES
VOLUME
DISPOSITION
Year
Year
Year
Year
VOLUME
Current
TOTAL
3
(m
)
2
3
4
5
3
(m
)
CONIFEROUS
DECIDUOUS
TIMBER PRODUCTION:
3
a. The total coniferous production to date on this permit is:
m
3
Coniferous production for the period covered by this timber year is:
m
3
b. The total deciduous production to date on this permit is:
m
3
Deciduous production for the period covered by this timber year is:
m
1) All of portions of the primary species (____________________) will be delivered to
the following mills:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based Accounting:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
2) All of portions of the primary species (____________________) will be delivered to
the following mills:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based Accounting:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
Has submission authority been given to the receiving mill?
Yes
No
If Yes, agreement must be submitted with the AOP
Form 7 – TM 118B (Legal 5 pages)
Page 1 of 5
Form (TM 118B – Revision Nov 2017)
Annual Operating Plan (AOP) Submission
Commercial Timber Permits
TIMBER PERMIT NUMBER:
_______________________________
PERMITTEE NAME:
____________________________________
OPERATING PERIOD:
_____ /_____ /_____ TO _____ /_____ /_____ (MM/DD/YY)
GENERAL DEVELOPMENT PLAN (for allocated permits only):
ESTIMATED
5 YEAR PROPOSED PRODUCTION SCHEDULE
HARVESTED
REMAINING
SPECIES
VOLUME
DISPOSITION
Year
Year
Year
Year
VOLUME
Current
TOTAL
3
(m
)
2
3
4
5
3
(m
)
CONIFEROUS
DECIDUOUS
TIMBER PRODUCTION:
3
a. The total coniferous production to date on this permit is:
m
3
Coniferous production for the period covered by this timber year is:
m
3
b. The total deciduous production to date on this permit is:
m
3
Deciduous production for the period covered by this timber year is:
m
1) All of portions of the primary species (____________________) will be delivered to
the following mills:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based Accounting:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
2) All of portions of the primary species (____________________) will be delivered to
the following mills:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based Accounting:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
Mill #
Name and Location:
Weigh Scale
Tree Length Scale:
Production Based:
Has submission authority been given to the receiving mill?
Yes
No
If Yes, agreement must be submitted with the AOP
Form 7 – TM 118B (Legal 5 pages)
Page 1 of 5
Form (TM 118B – Revision 2017)
OUTSTANDING OPERATIONS:
OUTSTANDING OPERATIONS
SCHEDULED
DISPOSITION
BLOCK
(CLEAN-UP REQUIRED)
COMPLETION DATE
All burning operations from the previous timber year have been inspected and all
piles are extinguished.
OPERATING SCHEDULE (Blocks proposed for harvest under the authority of this
submission):
DETAILED
DEBRIS DISPOSAL
GROUND
HARVEST
SEASON OF
LAYOUT
WATERCOURSE
BLOCK
RULE
AREA
COMPLETION
OPERATION
APPROVAL
WITHIN BLOCK
METHOD
DEVIATION
PLAN
DATE
REQUIRED*
S
W
PHP*
FHP*
YES
NO
YES
NO
LS*
PB*
(MM/YYYY)
YES
NO
PHP – Block has design approval. Layout and GPS has not yet been completed or
approved. FHP approval will be granted simultaneously with the AOP approval
FHP – Block is laid out and has been GPS’d. GPS shape file has been submitted to the
Forestry Division Office.
LS – Lop and Scatter – Limbs and tops are returned to the block after the trees are
processed at the landing. Debris is to be evenly spread throughout the block and
crushed to lie flat to the ground
PB – Pile and Burn – Landing debris is to be piled and burned when suitable burning
conditions exist. Disposal shall be in accordance with the Forest and Prairie Protection
Act and Regulations. A fire permit is required for any burning that is done during the fire
season (typically April 1st to October 31st each year)
A Fire Control Supplement (Form TM 118C) must be submitted with the AOP
submission if any harvesting is scheduled between April 1st and October 31st of any
year, or if the debris disposal method is pile and burn.
Detailed Harvest Area Plans (DHAP) – Required with the AOP submission if ground rule
deviations are identified or if watercourse crossings are present within the block. See
Point number 4 on page 4 for more detail regarding the DHAP.
Watercourse Crossing locations have been identified on the attached maps
GROUND RULE DEVIATION EXPLANATION:
Form 7 – TM 118B (Legal 5 pages)
Page 2 of 5
Form (TM 118B – Revision 2017)
HARVEST OPERATIONS:
1. Cut Method:
Feller Buncher
Hand falling
2. Extraction Method (method of skidding):
Wheeled Skidders
Tracked
Skidders
Other
3. Log Length (processing of trees to the landing):
Full Tree
Log Length
Tree Length
ACCESS AND ROAD USE AGREEMENTS:
The roads that will be utilized to haul the wood harvested from this timber permit are
covered by the following Licenses of Occupation’s (LOC’s) or other dispositions
(disposition holders are responsible to ensure road use agreements are in place prior to
the commencement of harvest operations):
Disposition Number
Disposition Holder
1.
2.
3.
4.
5.
These have been marked on the attached maps and permission for use has
been obtained from the company(s) listed above
NON LOC ROADS AND WATERCOURSE CROSSING PLAN:
WATERCOURSE
CONSTRUCTION AND
CROSSINGS
RECLAMATION*
DURATION
ROAD
PROPOSED
BLOCK
OF
CLASS
CROSSING
DATE OF
PROPOSED DATE OF
USE
YES
NO
STRUCTURE*
CONSTRUC
RECLAMATION
TION
Crossing structures - must be appropriate according to the watercourse classification,
and must be in accordance with the applicable operating ground rules (acceptable
structures include, but are not limited to: Snow fills, Log fills, Culverts and Bridges.
Roads – All non-LOC access or inner block roads that will be used for more than 5
years will require a LOC to be taken out by the Permittee.
KEY STAKEHOLDER NOTIFICATIONS:
Notification to any overlapping disposition holders as identified on the timber permit
document (examples include but are not limited to registered trappers)
REFFERAL
CONTACT
DISPOSITION
DISPOSITION HOLDER
DATE
METHOD
This permit is subject to a Grazing Timber Agreement (GTA# __________). All
Grazing and Timber Agreement (GTA) conditions have been addressed, and the
holder has been notified as listed above
Form 7 – TM 118B (Legal 5 pages)
Page 3 of 5
Form (TM 118B – Revision 2017)
ANNUAL OPERATING PLAN PREPARATION AND SUBMISSION:
1. Two copies of the Annual Operating Plan and map must be submitted. The plan
must be developed in compliance with the Forests Act, the Timber Management
Regulation, the Public Lands Act, the applicable Operating Ground Rules, and
any special operating conditions identified on the permit document.
2. As per section 98(1) of the Timber Management Regulation, Annual Operating
Plans are to be submitted:
(a) before the 1st day of March if operations are to begin between the 1st day
of May and the 31st day of October
(b) before the 1st day of September if operations are to begin between the 1st
day of November and the following 30th day of April.
(c) notwithstanding clauses (a) and (b), before a time specified by the Minister
3. Annual Operating Plan maps shall be prepared at a scale of no less than 1:15
000
At a minimum, all AOP maps shall show the following information, unless
requested otherwise:
Permit boundary
Current years and future years blocks, as well as previously harvested blocks
with outstanding operation from this disposition
Access routes and main haul roads
Watercourse buffers, crossing locations and types of crossing structures
Pipeline crossing locations
Landing locations
4. Detailed Harvest Area Plans (DHAP) shall be prepared at a scale of 1:5 000 and
are required where:
Operations deviate from the applicable operating ground rules
Watercourses (including springs and seepages) and/or watercourse crossings
are present within the block
Watercourse buffers are applied
There are areas of steep topography requiring specific road locations and
construction (numerous cuts and fills)
The permit document identifies a DHAP requirement or one is subsequently
requested by SRD
The DHAP shall show the locations of deviations, watercourses and watercourse
crossings, and will describe the proposed operations and/or crossing structure to
be used.
SUBMISSION:
PERMITTE NAME:
CONTACTS AND SIGNATURE:
TELEPHONE (BUSINESS):
PERMITTEE ADDRESS:
(HOME):
FAX:
POSTAL CODE:
SUBMISSION DATE:
PERMITTEE SIGNATURE:
Form 7 – TM 118B (Legal 5 pages)
Page 4 of 5
Form (TM 118B – Revision 2017)
ANNUAL OPERATING PLAN APPROVAL
APPROVED BY: _______________________________________________________
DATE:
____
Form 7 – TM 118B (Legal 5 pages)
Page 5 of 5
Page of 5