Instructions for Form BSEE-0149 "Assignment of Federal Ocs Pipeline Right-Of-Way Grant"

This document contains official instructions for Form BSEE-0149, Assignment of Federal Ocs Pipeline Right-Of-Way Grant - a form released and collected by the U.S. Department of the Interior - Bureau of Safety and Environmental Enforcement. An up-to-date fillable Form BSEE-0149 is available for download through this link.

Instruction Details:

  • This 1-page document is available for download in PDF;
  • Actual and applicable for the current year;
  • Complete, printable, and free.

Download your copy of the instructions by clicking the link below or browse hundreds of other forms in our library of forms released by the U.S. Department of the Interior - Bureau of Safety and Environmental Enforcement.

ADVERTISEMENT
ADVERTISEMENT

Download Instructions for Form BSEE-0149 "Assignment of Federal Ocs Pipeline Right-Of-Way Grant"

237 times
Rate (4.4 / 5) 12 votes
Instructions for Assignment of Federal OCS Pipeline Right-of-Way Grant
(Form BSEE-0149)
1. To ensure legibility, information on the forms must be typed or computer-printed, rather than
hand-written. The forms must be filed in triplicate.
2. Enter names of all assignors and the assignee. The company number must be identified next
to the name of each assignor and the assignee.
3. When signing, under assignor(s), enter Company name followed by Company Number.
Company name must be typed exactly as it appears in qualification files (including case,
punctuation, and spacing).
4. The service fee required by 30 CFR 250.125 must accompany the assignment request. The
assignment must be filed with the appropriate BSEE OCS office within 90 days after the last
party executes the assignment agreement.
5. The assignee must be in good standing with acceptable performance as provided under
30 CFR Part 250.
6. This form may be duplicated by means of word processing software, but any duplicate which
differs from the approved form must be deemed to include any omitted language as if it were
the original form.
EFFECT OF NOT PROVIDING INFORMATION -- If all required information is not
provided, the assignment may not be approved.
(10/2018
Page 1 of 1
Supersedes all previous editions of this instruction sheet which may not be used)
Instructions for Assignment of Federal OCS Pipeline Right-of-Way Grant
(Form BSEE-0149)
1. To ensure legibility, information on the forms must be typed or computer-printed, rather than
hand-written. The forms must be filed in triplicate.
2. Enter names of all assignors and the assignee. The company number must be identified next
to the name of each assignor and the assignee.
3. When signing, under assignor(s), enter Company name followed by Company Number.
Company name must be typed exactly as it appears in qualification files (including case,
punctuation, and spacing).
4. The service fee required by 30 CFR 250.125 must accompany the assignment request. The
assignment must be filed with the appropriate BSEE OCS office within 90 days after the last
party executes the assignment agreement.
5. The assignee must be in good standing with acceptable performance as provided under
30 CFR Part 250.
6. This form may be duplicated by means of word processing software, but any duplicate which
differs from the approved form must be deemed to include any omitted language as if it were
the original form.
EFFECT OF NOT PROVIDING INFORMATION -- If all required information is not
provided, the assignment may not be approved.
(10/2018
Page 1 of 1
Supersedes all previous editions of this instruction sheet which may not be used)