Form DMM-168 "General Permit for Sand and Gravel Operations Less Than Ten Acres in Size" - Virginia

What Is Form DMM-168?

This is a legal form that was released by the Virginia Department of Mines, Minerals and Energy - a government authority operating within Virginia. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on May 1, 2016;
  • The latest edition provided by the Virginia Department of Mines, Minerals and Energy;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form DMM-168 by clicking the link below or browse more documents and templates provided by the Virginia Department of Mines, Minerals and Energy.

ADVERTISEMENT
ADVERTISEMENT

Download Form DMM-168 "General Permit for Sand and Gravel Operations Less Than Ten Acres in Size" - Virginia

Download PDF

Fill PDF online

Rate (4.4 / 5) 99 votes
DIVISION OF MINERAL MINING
900 NATURAL RESOURCES DRIVE, STE 400
CHARLOTTESVILLE, VA 22903
(434) 951-6310
GENERAL PERMIT FOR SAND AND GRAVEL OPERATIONS
LESS THAN TEN ACRES IN SIZE
GENERAL TERMS AND CONDITIONS
This general permit governs the mining of sand, or sand and gravel which affect a total disturbed
area of less than 10 acres in size. The general permit is not applicable to dredging operations or
those that otherwise intend to mine below the groundwater table.
In order to obtain approval from the Division of Mineral Mining (DMM) for the activity covered
under this general permit, the applicant must complete a Permit/License Application (Form
DMM-101). No ground disturbance shall take place until the application is approved and the
appropriate bond and permit fees are submitted. Additional information may be required based
on site-specific conditions.
In addition to the conditions listed below, this permit is subject to all requirements of Chapter 16,
Title 45.1 of the Code of Virginia, as amended 1950. Inspections by DMM Mine Inspectors, as
required by law, may take place at any time deemed necessary to ensure that all mine activities
are in compliance with the terms and conditions of the permit.
In special cases involving public safety or environmental concerns, the DMM Director may deny
the application for a general permit and require application for an individual permit.
Issuance of this general permit does not preclude the need to obtain other federal, state or local
authorizations as required by law. The general permit may be re-evaluated and/or revoked at any
time under circumstances including, but not limited to:
1. Failure to comply with the terms and conditions of the permit.
2. Submittal of a permit application that proves to be false, incomplete, or inaccurate.
3. Change of permit conditions.
Upon re-evaluation, the general permit may remain in effect pending the approval of an
amendment or other items to address special circumstances.
DIVISION OF MINERAL MINING
900 NATURAL RESOURCES DRIVE, STE 400
CHARLOTTESVILLE, VA 22903
(434) 951-6310
GENERAL PERMIT FOR SAND AND GRAVEL OPERATIONS
LESS THAN TEN ACRES IN SIZE
GENERAL TERMS AND CONDITIONS
This general permit governs the mining of sand, or sand and gravel which affect a total disturbed
area of less than 10 acres in size. The general permit is not applicable to dredging operations or
those that otherwise intend to mine below the groundwater table.
In order to obtain approval from the Division of Mineral Mining (DMM) for the activity covered
under this general permit, the applicant must complete a Permit/License Application (Form
DMM-101). No ground disturbance shall take place until the application is approved and the
appropriate bond and permit fees are submitted. Additional information may be required based
on site-specific conditions.
In addition to the conditions listed below, this permit is subject to all requirements of Chapter 16,
Title 45.1 of the Code of Virginia, as amended 1950. Inspections by DMM Mine Inspectors, as
required by law, may take place at any time deemed necessary to ensure that all mine activities
are in compliance with the terms and conditions of the permit.
In special cases involving public safety or environmental concerns, the DMM Director may deny
the application for a general permit and require application for an individual permit.
Issuance of this general permit does not preclude the need to obtain other federal, state or local
authorizations as required by law. The general permit may be re-evaluated and/or revoked at any
time under circumstances including, but not limited to:
1. Failure to comply with the terms and conditions of the permit.
2. Submittal of a permit application that proves to be false, incomplete, or inaccurate.
3. Change of permit conditions.
Upon re-evaluation, the general permit may remain in effect pending the approval of an
amendment or other items to address special circumstances.
ITEMS TO BE SUBMITTED TO DMM
1. Permit/License Application (Form DMM–101)
Yes
No
2. Permit Notifications (Forms DMM–103, 103A)
Yes
No
3. Certified mail receipts for adjacent property owners
Yes
No
within 1000 feet of permit boundary
4. Proof of notification of local administrative officials
Yes
No
5. Proof of notification of utility companies with facilities
Yes
No
within 500 feet of permit boundary
6. VDOT Commercial Entrance Permit
Yes
No
N/A
7. Permit map drawn to a scale of 400 feet to the inch showing the entire permit area. Map
should include: location of the mine pit, main access road, haul roads, product and waste
storage areas and all other facilities within the permit; property boundary of tract being
mined; property boundaries and names of surface owners within 1000 feet of the permit
boundary; sensitive features within 1,000 feet of the permit boundary such as cemeteries,
oil and gas wells, underground mine workings, streams, creeks and other bodies of public
water, public utilities and utility lines, public buildings, public roads, churches, and
occupied dwellings; drainage flow directions within the permit area; map scale and north
arrow.
8. Map legend (Form DMM-109).
9. General location map showing the location of the mine, such as a county highway map or
equivalent.
Two copies of all documents are required. An explanation needs to be attached for any
documents not submitted.
OFF-SITE MATERIALS / HAZARDOUS WASTE
Disposal of off-site generated waste materials will not be allowed within the permitted area.
No chemicals or hazardous materials will be stored or allowed on-site.
No trash and/or debris will be allowed to accumulate on-site. All on-site generated waste such as
used petroleum products, contaminated fuel, used anti-freeze, used batteries, used cleaning
solvents, etc. will be properly stored until disposed of at an approved off-site facility.
DMM-168
Rev. 05/16
2
SIGNS
A sign shall be posted at the mining site adjacent to the principal access road. The name of the
permittee and the permit number shall be clearly painted on the sign. The dimensions of the sign
shall be 4-ft x 4-ft, and it shall be attached to a metal pipe or wood post at a minimum height of 4
feet above ground level.
MARKING OF PERMIT BOUNDARIES
The permit boundary of the mine shall be clearly marked with identifiable markings when mine
related disturbing activities are within 100’ of the permit boundary.
ROADS
The access road entrance shall be approved by the Virginia Department of Transportation
(VDOT). The access road will be properly maintained to ensure that mud and debris are not
tracked onto public roads. The access road will be at least 15 feet in width and paved with
gravel, asphalt or a combination of sand and gravel for a distance of 200 feet from the junction
with the public road. All access roads and service roads will be properly maintained to control
dust. Maintenance of the road system shall consist of inspecting, repairing and cleaning of
roadways, ditches and culverts as necessary. Internal service roads and principal access roads
shall be planned to minimize the impact of traffic, dust, and vehicle noise on developed areas
outside the mining site.
Road surfaces and ditches will be stabilized with rock or other suitable paving material, or
vegetated in the case of ditches. When a road is abandoned, steps shall be taken immediately to
minimize erosion and establish vegetative cover. These steps will involve scarifying the road to
a depth of 12 inches and seeding to meet the post mining land use requirements. The haul road
may be left un-reclaimed with the landowner’s approval following the completion of mining.
Sediment control shall be provided for roads to minimize sediment that leaves the permitted and
disturbed area. Culverts with a minimum diameter of 12 inches, but adequate to carry storm
runoff, will be installed at intervals to prevent overloading of ditches. Where necessary, the inlet
end shall be protected by a headwall of a suitable material and the outlet end shall discharge onto
an apron of rock riprap or concrete. Runoff will not be allowed to flow over an unprotected fill
slope.
DRAINAGEWAYS
No impacts to natural drainageways will be allowed. All intermittent or perennial streams shall
be protected from spoil by natural or constructed barriers. In the event that a stream crossing is
required, a plan will be submitted detailing the crossing.
DMM-168
Rev. 05/16
3
A 50-foot buffer zone of undisturbed vegetation or undisturbed forest will be provided and
maintained on both sides of all streams in the mining area. Buffer zones will be maintained in
addition to proper sediment control.
SCREENING
Site screening will be achieved by one or a combination of the following methods: (1) 100 feet
of undisturbed forest within the permit boundary; (2) the use of natural topography; (3)
constructed berms; and (4) tree plantings. If trees are planted, they will be evergreens of
adequate height and suitable to the area. At least two rows will be planted with trees staggered
along the rows. The slopes of screening berms will be 3H:1V and seeded immediately to prevent
erosion. The toe of the berms shall not be constructed within 25 feet of adjacent property
boundaries without written permission from the adjoining property owner. Sediment control
for the exterior of berms will be provided by properly installed silt fence. Berms shall be
removed and the material used in reclamation following mining.
MINING METHOD, TOPSOIL STORAGE AND DRAINAGE CONTROL
Prior to any land disturbing activities, temporary sediment control will be properly installed
where necessary around the perimeter of the area to be disturbed. Topsoil and overburden will
be removed and stockpiled or used to create diversion berms around the perimeter of the site.
The constructed berms will be no higher than 5 feet above the natural ground elevation and will
have a top width of at least 4 feet. The side slopes will be 3H:1V or less and will be compacted
and vegetated. No topsoil will be removed without prior approval. Diversion berms will be
inspected on a regular basis and maintained as necessary. Berms shall not be constructed within
25 feet of adjacent property boundaries without written permission from the adjoining property
owner. Tree roots and limbs generated on-site may be stockpiled within the permit area.
As areas are completed, the berms will be utilized to obtain final grade and promote vegetative
cover.
Mining will be conducted in such a way as to direct all surface runoff into the pit. All storm-
water drainage within the disturbed area will be diverted into the pit. If a drainage outlet is
needed, a permit amendment including a design for the outlet will be required.
MINING BELOW THE WATER TABLE
No mining will take place below the water table without first obtaining approval through an
amendment.
METAL AND DEBRIS
All metal, lumber and debris will be stored in one location within the permitted area for use in
DMM-168
Rev. 05/16
4
repair of equipment, or to be sold at a later date. No metal will be left on the site after mining is
complete. Any off-site generated metal waste will be promptly removed to an approved landfill.
There will be no landfilling activities on the permitted area.
COMPLETED SLOPES
All active slopes will be maintained at the angle of repose (i.e. no steeper than 1H:1V). All final
slopes will be graded to 3H:1V or a lesser slope. Reclamation will be conducted concurrently
with mining.
ACID MATERIAL
All acid-generating spoil materials will be segregated and buried to a minimum depth of four
feet.
REVEGETATION
As each area is mined out, it shall be immediately regraded and vegetated to provide
simultaneous reclamation. Compacted soils shall be ripped or scarified to a depth of at least 18
inches prior to seeding. Lime and fertilizer requirements shall be determined by soil testing.
Seed selection will be determined in consultation with the DMM mine inspector based on the
best post mining land use determination at the time. Constructed wetlands will be considered as
a post mining land use only after the operator submits and receives approval for a plan. Tree
plantings are encouraged as part of the post mining land use and must occur in forest,
unmanaged forest, and wildlife habitat post mining land uses.
The post mining land use for this permit area will be __________________________.
CLOSURE OF ROADS OR OPENINGS
Upon abandonment of the mine, the operator shall effectively close or fence all roads, openings,
and pits where hazardous conditions exist. Warning signs shall be posted. If fencing is
necessary, the fence shall be 4-feet high woven wire with two strands of barbed wire on top.
Intermittently worked mines shall also be closed or barricaded, and posted with warning signs to
prevent access to roads and hazardous areas.
DMM-168
Rev. 05/16
5