BR Form 385 Bridge Scour Report - Nebraska

BR Form 385 Bridge Scour Report - Nebraska

What Is BR Form 385?

This is a legal form that was released by the Nebraska Department of Transportation - a government authority operating within Nebraska. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is the BR Form 385 Bridge Scour Report?A: The BR Form 385 Bridge Scour Report is a report that assesses the risk of bridge scour on a bridge in Nebraska.

Q: What is bridge scour?A: Bridge scour is the erosion of soil or sediment around bridge foundations, which can compromise the structural integrity of the bridge.

Q: Why is the BR Form 385 Bridge Scour Report important?A: The report is important as it helps identify potential issues with bridge scour and enables appropriate maintenance or repairs to be conducted to ensure the safety of the bridge.

Q: Who is responsible for preparing the BR Form 385 Bridge Scour Report?A: The report is typically prepared by engineers or consultants who specialize in bridge inspections and scour evaluations.

Q: Is the BR Form 385 Bridge Scour Report specific to Nebraska?A: Yes, the report is specific to Nebraska, as it is part of the Nebraska Department of Transportation's bridge inspection and maintenance procedures.

ADVERTISEMENT

Form Details:

  • Released on November 1, 2017;
  • The latest edition provided by the Nebraska Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of BR Form 385 by clicking the link below{class="scroll_to"} or browse more documents and templates provided by the Nebraska Department of Transportation.

Download BR Form 385 Bridge Scour Report - Nebraska

4.3 of 5 (29 votes)
  • BR Form 385 Bridge Scour Report - Nebraska, Page 1
ADVERTISEMENT