"Development & Building Permit Application" - Prince Edward Island, Canada

ADVERTISEMENT
ADVERTISEMENT

Download "Development & Building Permit Application" - Prince Edward Island, Canada

377 times
Rate (4.3 / 5) 22 votes
Development & Building Permit Application
A.
Before You Apply
All applicants should read through the application form carefully to determine if they have all of the information on hand
to complete it.
If you are applying for a development permit to build a commercial, industrial, institutional, or multi-unit residential
structure, please contact a Development Officer with the Land Division before applying.
If you are applying for a building permit that requires professional design or is outside the scope of the National Building
Code please contact a Building Official with the Land Division before applying.
B.
Application Package Requirements
Before an application package is considered complete and will be accepted for review, it must contain:
The application form that has all of the questions answered and is signed by the registered owner of the property, or
someone authorized to act on their behalf, as well as the applicant.
A Development Area Map, drawn to scale and including a north arrow, showing:
The boundaries of the property involved, including dimensions
All roads and right-of-ways on and adjacent to the property
The distance from the proposed structure to all property boundaries
The location of all existing structures on the property, including exterior dimensions
The location of the proposed structure, including exterior dimensions and elevations
The distance from the proposed structure to the centre of any roads
The distance from the proposed structure to any existing structures
The distance from the proposed structure to any watercourse, sand dune, or the top of the bank
The distance from the proposed structure to any existing or proposed well and septic systems (tank and field
tile)
The distance between any well and septic systems
The location of any existing and proposed driveways, including the distance from the centre of the driveway
to the nearest property boundary
Further requirements specific to Building Permit Applications:
Foundation, truss and structural framing plans and details
Front, side and rear elevations
Floor Plans
Cross-Sections
C.
How to Submit Your Application
Once you have completed the application form, and reviewed it to ensure all questions have been answered, and that all
information provided is clear and accurate, deliver your application to Inspection Services, located at 31 Gordon Drive,
Charlottetown. Alternatively, you can deliver your application form to one of the Access PEI locations listed below:
O’Leary
Summerside
Montaque
Your application will be considered incomplete and will be returned if any of the requirements outlined in section B,
above, are missing, if the information or Development Area Map is not clear and legible, or if the application fees have
not been paid.
Development & Building Permit Application
A.
Before You Apply
All applicants should read through the application form carefully to determine if they have all of the information on hand
to complete it.
If you are applying for a development permit to build a commercial, industrial, institutional, or multi-unit residential
structure, please contact a Development Officer with the Land Division before applying.
If you are applying for a building permit that requires professional design or is outside the scope of the National Building
Code please contact a Building Official with the Land Division before applying.
B.
Application Package Requirements
Before an application package is considered complete and will be accepted for review, it must contain:
The application form that has all of the questions answered and is signed by the registered owner of the property, or
someone authorized to act on their behalf, as well as the applicant.
A Development Area Map, drawn to scale and including a north arrow, showing:
The boundaries of the property involved, including dimensions
All roads and right-of-ways on and adjacent to the property
The distance from the proposed structure to all property boundaries
The location of all existing structures on the property, including exterior dimensions
The location of the proposed structure, including exterior dimensions and elevations
The distance from the proposed structure to the centre of any roads
The distance from the proposed structure to any existing structures
The distance from the proposed structure to any watercourse, sand dune, or the top of the bank
The distance from the proposed structure to any existing or proposed well and septic systems (tank and field
tile)
The distance between any well and septic systems
The location of any existing and proposed driveways, including the distance from the centre of the driveway
to the nearest property boundary
Further requirements specific to Building Permit Applications:
Foundation, truss and structural framing plans and details
Front, side and rear elevations
Floor Plans
Cross-Sections
C.
How to Submit Your Application
Once you have completed the application form, and reviewed it to ensure all questions have been answered, and that all
information provided is clear and accurate, deliver your application to Inspection Services, located at 31 Gordon Drive,
Charlottetown. Alternatively, you can deliver your application form to one of the Access PEI locations listed below:
O’Leary
Summerside
Montaque
Your application will be considered incomplete and will be returned if any of the requirements outlined in section B,
above, are missing, if the information or Development Area Map is not clear and legible, or if the application fees have
not been paid.
1.
Application Type
Personal information on this form is collected
under section 31 (c) of the Freedom of Infor-
Development & Building Permit
mation and Protection of Privacy Act R.S.P.E.I.
1988, c. F-15.01 as it relates directly to and is
Development Permit Only
necessary for the review of your application.
If you have any questions about this collec-
Building Permit Only
tion of personal information, you may con-
tact (902) 368-5280 for more information.
Property Information
2.
Property Tax Number :
Community:
Civic Address Number:
Street Name:
Property Depth:
Property Width:
Lot Number
Property Acreage:
(if applicable)
Applicant Information and Mailing Address
.
3
Name:
Middle Initial
First
Last
Company Name:
Street Address or PO Box:
Community:
Province:
Postal Code:
Email:
Phone:
4.
Property Owner Information if Different From Above
Name:
Middle Initial
First
Last
Company Name:
Street Address or PO Box:
Community:
Province:
Postal Code:
Email:
Phone:
.
Existing Land Use
5
a. How is the property currently used? Please check all that apply.
Single-unit residential
Commercial
Agriculture
Multi-unit residential
Industrial
Forestry
Rental accommodations
Institutional
Other
b. Describe the current land use in detail. If the property is used for a livestock operation, include the type of
livestock, the number of animals, and whether there is a manure storage facility.
Yes
No
c.
Are there existing buildings on the property?
d. If there are existing buildings on the property, please describe the use of each building in detail.
e. What is the physical nature of the land? Please check all that apply.
Wooded or treed
Pasture
Along the coast
Low or swampy
Hilly
Near a waterbody
Cultivated
Level or flat
Other
f.
Describe the physical nature in detail.
g.
Are any of the following located within one kilometre of the proposed development?
Livestock operation
Waste disposal site
Residential lots
Quarry or pit
Airport
Shellfish processing
Sewage treatment facility
Cemetery
Active wharf
.
Proposal Information
6
a. What type of development or activity are you proposing? Please check all that apply.
New, detached structure
Changing the use of an existing structure
Addition to existing structure
Renovation of an existing structure
Relocation of existing structure
Demolition of an existing structure
b. What will the proposed development be used for? Please check all that apply.
Single-unit residential
Commercial
Agriculture
Multi-unit residential
Industrial
Aquaculture/Fisheries
Rental accommodations
Institutional
Forestry
c.
If you are proposing a residential use, please indicate the number of bedrooms and dwelling units you intend to have
in the structure. A dwelling unit is one or more rooms intended to be used as a single housekeeping unit and generally
include their own cooking and toilet facilities.
Number of Bedrooms:
Number of Dwelling Units:
Yes
No
d. Is the proposed structure the main structure on the property?
e. Describe how the proposed structure will be used in detail.
f.
What are the dimensions of the structure that you are proposing?
2
Maximum Width (ft):
First Floor Area (ft
):
2
Maximum Depth (ft):
Total Floor Area(ft
):
Number of Stories:
g.
Provide the minimum distance from your proposed structure to the following.
Front Yard Property Line (ft):
Rear Yard Property Line (ft):
Left Side Property Line (ft):
Right Side Property Line (ft):
Shoreline or Top of Bank (ft):
Wetland or watercourse (ft):
Dunes (ft):
Water Well (ft):
Septic Tank (ft):
Septic Filed Tile (ft):
h. What is the estimated dollar value of constructing, plumbing, wiring and finishing your proposed project (excluding
costs for land, septic system and landscaping)? $
.
Access and Servicing Information
7
Yes
No
a. Will the proposal require the creation of a new driveway or the relocation of
an existing driveway?
Yes
No
b. Was a soil assessment (perc test) completed on the property?
c.
Is there an existing septic system on the property?
Yes
No
d. How will the proposed structure receive sewer services?
New on-site system
Municipal Central Waste Treatment
Existing on –site system
Private Central Waste Treatment
.
Technical Information
8
a. What type of heating system are you proposing? Please check all that apply.
Oil:
Baseboards
Forced Air
In-Floor
Electric:
Baseboard
Heat Pump
In-Floor
Other:
Please
Describe
b. What type of basement are you proposing for the structure?
Full Basement
No Basement
Slab on Grade
Crawlspace
c.
What type of foundation are you proposing for the structure?
Standard Concrete
Insulated Concrete Form (ICF)
Wood Posts
Other:
Please De-
d. What type of electrical service are you proposing for the structure?
100 Amp
200 Amp
Other:
Please De-
e. What siding material are you proposing for the structure?
f.
What roofing material are you proposing for the structure?
Page of 7