Project Name:_______________________________________
THE PENNSYLVANIA STATE UNIVERSITY
EROSION AND SEDIMENTATION CONTROL INSPECTION LOG SHEET
The E&S plan contains a maintenance program which provides for inspection of BMPs (Best Management Practices such as silt fence, sediment basins, etc.) on a
weekly basis and after each measurable rainfall event, including the repair of BMPs to ensure effective and efficient operation. The maintenance program for both the
temporary and permanent erosion and sediment control BMPs, including disposal of materials removed from the BMPs or project area, has been included in the
narrative. The type of maintenance, such as cleanout, repair, replacement, regrading, restabilizing, etc. for each of the BMPs is included in the plan. NOTE: This
inspection report must be kept up to date and will be reviewed by the Conservation District and/or Penn State Representatives regularly.
LOCATION
RAINFALL
OF E&S
INSPECTION
OR
CONTROL
DATE
INITIALS
WEEKLY
MEASURE
CONDITIONS NOTED
CORRECTIVE MEASURES TAKEN
Vol 10\Operations\Eng Svcs Stuff\EandS\Inspection Report
Page ____ of ______
Project Name:_______________________________________
THE PENNSYLVANIA STATE UNIVERSITY
EROSION AND SEDIMENTATION CONTROL INSPECTION LOG SHEET
The E&S plan contains a maintenance program which provides for inspection of BMPs (Best Management Practices such as silt fence, sediment basins, etc.) on a
weekly basis and after each measurable rainfall event, including the repair of BMPs to ensure effective and efficient operation. The maintenance program for both the
temporary and permanent erosion and sediment control BMPs, including disposal of materials removed from the BMPs or project area, has been included in the
narrative. The type of maintenance, such as cleanout, repair, replacement, regrading, restabilizing, etc. for each of the BMPs is included in the plan. NOTE: This
inspection report must be kept up to date and will be reviewed by the Conservation District and/or Penn State Representatives regularly.
LOCATION
RAINFALL
OF E&S
INSPECTION
OR
CONTROL
DATE
INITIALS
WEEKLY
MEASURE
CONDITIONS NOTED
CORRECTIVE MEASURES TAKEN
Vol 10\Operations\Eng Svcs Stuff\EandS\Inspection Report
Page ____ of ______
Project Name:_______________________________________
THE PENNSYLVANIA STATE UNIVERSITY
EROSION AND SEDIMENTATION CONTROL INSPECTION LOG SHEET
LOCATION
RAINFALL
OF E&S
INSPECTION
OR
CONTROL
DATE
INITIALS
WEEKLY
MEASURE
CONDITIONS NOTED
CORRECTIVE MEASURES TAKEN