Form BR70 "Asphalt Mixture (Hma/Wma) Pavetracker Density Data" - New York

What Is Form BR70?

This is a legal form that was released by the New York State Department of Transportation - a government authority operating within New York. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on January 1, 2021;
  • The latest edition provided by the New York State Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form BR70 by clicking the link below or browse more documents and templates provided by the New York State Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form BR70 "Asphalt Mixture (Hma/Wma) Pavetracker Density Data" - New York

Download PDF

Fill PDF online

Rate (4.4 / 5) 56 votes
BR 70 (1/2021)
Page 1 of
MATERIALS BUREAU
Asphalt Mixture (HMA/WMA)
PaveTracker Density Data
Contract #:
Date:
Location:
Route :
Operator’s Name:
Gauge Serial #:
Reference Value:
Project Target Density (PTD):
Min. Avg. Single Test (0.97*PTD):
Min. Avg. of Last 10 (0.98*PTD):
Inspector’s
In-Place Pavement Density Measurements
Average
Moving
Date of
Station
Initials
(lbs./ft³)
Lane
Offset
PaveTracker
Avg. of Last
Paving
No.
(if test
1
2
3
4
Density
10
observed)
Operator’s Signature:
Reviewed by:
(copy with original signature must be submitted to the EIC at the end of the day’s paving)
BR 70 (1/2021)
Page 1 of
MATERIALS BUREAU
Asphalt Mixture (HMA/WMA)
PaveTracker Density Data
Contract #:
Date:
Location:
Route :
Operator’s Name:
Gauge Serial #:
Reference Value:
Project Target Density (PTD):
Min. Avg. Single Test (0.97*PTD):
Min. Avg. of Last 10 (0.98*PTD):
Inspector’s
In-Place Pavement Density Measurements
Average
Moving
Date of
Station
Initials
(lbs./ft³)
Lane
Offset
PaveTracker
Avg. of Last
Paving
No.
(if test
1
2
3
4
Density
10
observed)
Operator’s Signature:
Reviewed by:
(copy with original signature must be submitted to the EIC at the end of the day’s paving)