CDOT Form 43 "Superpave Mix" - Colorado

What Is CDOT Form 43?

This is a legal form that was released by the Colorado Department of Transportation - a government authority operating within Colorado. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on April 1, 2019;
  • The latest edition provided by the Colorado Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of CDOT Form 43 by clicking the link below or browse more documents and templates provided by the Colorado Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download CDOT Form 43 "Superpave Mix" - Colorado

1105 times
Rate (4.8 / 5) 66 votes
Project No:
Region
Contract ID
COLORADO DEPARTMENT OF TRANSPORTATION
Local Agency, M-Projects and NON-CDOT
Project Specific
Project Location:
ASPHALT JOB MIX FORMULA
This Job Mix Formula defines the specifiec gradation, asphalt cement content, and admixture dosage for the grading and project
SUPERPAVE MIX
Form 43 No:
Mix Type
N(Design):
# of Blows:
Effective Date:
Mix Designer:
Contractor:
Material Code:
Producer:
Material Description:
Plants:
Components:
Percentage
Material
Supplier
Comp 1
Comp 2
Comp 3
Comp 4
Comp 5
Comp 6
Comp 7
Comp 8
Comp 9
Comp 10
Comp 11
Additive 1
Additive 2
Remarks:
%
%AC in 1st Rcyl Mat's
%
%AC in 2nd Rcyl Mat's
Gradation Acceptance
Voids Acceptance
%
%AC in 3rd Rcyl Mat's
%
%AC in 4th Rcyl Mat's
Job Mix Gradation
Sieve Size
% Pass Min % Pass Max
% AC:
± 0.3
1 1/2"
AC Type
1"
Source of AC:
3/4"
Max. Sp. Gr. at % AC:
± 0.01
1/2"
Fine Aggregate Angularity:
%
3/8"
Bulk Sp. Gr. (dry) Fine Agg:
#4
Bulk Sp. Gr.(dry) of Combined Agg:
#8
Absorption of Combined Agg:
%
#16
#30
New Mix Design with Changes
#50
#100
Mix Design Modified
#200
Voids Data at
New Mix Design With No Change
Property
Tolerance
Ndes Target Value
Stability
Minimum
Signed
Date
% Voids
± 1.2
Project Engineer:
± 1.2
% VMA
% VFA min
max
Flow
Signed
Date
Distribution:
Regional Materials Engineer:
Region Materials Engineer Resident
Engineer Project Engineer
Signed
Date
Contractor
Contractor's Representative:
LA , M-Project and Non-CDOT SMM Form 43 04/19
Project No:
Region
Contract ID
COLORADO DEPARTMENT OF TRANSPORTATION
Local Agency, M-Projects and NON-CDOT
Project Specific
Project Location:
ASPHALT JOB MIX FORMULA
This Job Mix Formula defines the specifiec gradation, asphalt cement content, and admixture dosage for the grading and project
SUPERPAVE MIX
Form 43 No:
Mix Type
N(Design):
# of Blows:
Effective Date:
Mix Designer:
Contractor:
Material Code:
Producer:
Material Description:
Plants:
Components:
Percentage
Material
Supplier
Comp 1
Comp 2
Comp 3
Comp 4
Comp 5
Comp 6
Comp 7
Comp 8
Comp 9
Comp 10
Comp 11
Additive 1
Additive 2
Remarks:
%
%AC in 1st Rcyl Mat's
%
%AC in 2nd Rcyl Mat's
Gradation Acceptance
Voids Acceptance
%
%AC in 3rd Rcyl Mat's
%
%AC in 4th Rcyl Mat's
Job Mix Gradation
Sieve Size
% Pass Min % Pass Max
% AC:
± 0.3
1 1/2"
AC Type
1"
Source of AC:
3/4"
Max. Sp. Gr. at % AC:
± 0.01
1/2"
Fine Aggregate Angularity:
%
3/8"
Bulk Sp. Gr. (dry) Fine Agg:
#4
Bulk Sp. Gr.(dry) of Combined Agg:
#8
Absorption of Combined Agg:
%
#16
#30
New Mix Design with Changes
#50
#100
Mix Design Modified
#200
Voids Data at
New Mix Design With No Change
Property
Tolerance
Ndes Target Value
Stability
Minimum
Signed
Date
% Voids
± 1.2
Project Engineer:
± 1.2
% VMA
% VFA min
max
Flow
Signed
Date
Distribution:
Regional Materials Engineer:
Region Materials Engineer Resident
Engineer Project Engineer
Signed
Date
Contractor
Contractor's Representative:
LA , M-Project and Non-CDOT SMM Form 43 04/19