Form 700-020-01 "Pile Driving Installation Plan Form" - Florida

What Is Form 700-020-01?

This is a legal form that was released by the Florida Department of Transportation - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on May 1, 2020;
  • The latest edition provided by the Florida Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form 700-020-01 by clicking the link below or browse more documents and templates provided by the Florida Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form 700-020-01 "Pile Driving Installation Plan Form" - Florida

Download PDF

Fill PDF online

Rate (4.5 / 5) 60 votes
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-020-01
PILE DRIVING INSTALLATION PLAN FORM
CONSTRUCTION
05/20
Contract No.
Structure Name or No.
FIN Project No.
County
Pile Driving Contractor
HAMMER COMPONENTS
Manufacturer
Model
Serial No.
Type: Diesel
Single/Double acting
Air
Hydraulic
Compressor
Rated Energy
at
Length Stroke
Ram Weight
Anvil Weight (Impact Block)
Modifications
HAMMER CUSHION (CAPBLOCK)
Material
__________ Diameter/Width
___________
Thickness
_______
(HELMET, DRIVING CAP, STRIKER PLATE)
PILE CAP
Inside Diameter or Width
Total Weight
Inside Height
PILE CUSHION
Material
_____________ Diameter/Width
_____________ Area
_________ Thickness
_______________
PILE
Nominal Bearing Resistance or Ultimate Capacity
Type: PCP
Cylinder
Steel H
Steel Pipe: Open-Ended
Closed-Ended
Taper
Timber
Length
Diameter/Width
Area
Wall Thickness
Bottom Plate Thickness
Comments
PILE INSTALLATION
Crane: Mobile/Crawler
Size
Leads: Fixed
Swinging
Semifixed
Template (attach sketches) Fixed to Ground
Fixed to Existing Structure
Comments
Barge:
Yes
No Description
Setting Pile: Predrill
Preform
Water Jet
Punch
Vibratory hammer
Comments
Drill/Jet Equipment
Drilling Depth & Size
Underwater driving:
Yes
No
Follower: (attach sketch)
Length
Height
Special Driving Requirements:
Yes
No Comments
Pile Driving Vibrations: Settlement Monitoring
Vibration Monitoring
Existing structures survey
(Attach details of procedures for protection of existing structures including any special protection measures)
Comments
Method of Determining Production Pile Capacity
Stroke vs. Blows: Saximeter
Bounce Pressure Gauge & Chart
100% Dynamic Testing
Comments
ATTACHMENTS CHECKLIST
- Manufacturer’s Data sheets for the pile driving hammer attached:
Yes
No
- For Double Acting Diesel hammers, charts and recent pressure gauge calibrations attached:
Yes
No
NA
- Details/sketches of followers attached:
Yes
No
NA
- Details/sketches of Templates attached:
Yes
No
- Details of Load Test Equipment and procedures including calibrations of jacks and cells attached:
Yes
No
NA
- Sequence of Pile Driving for each configuration of pile layout attached:
Yes
No
- Details of Proposed features and procedures for protection of existing structures attached:
Yes
No
NA
- Required shop drawings for piles, cofferdams, etc. attached:
Yes
No
- Methods to prevent displacement piles during placement and compaction of fill within 15 ft attached:
Yes
No
- Methods to prevent deflection of battered piles during placement and maintain alignment until pile cap is complete
attached:
Yes
No
NA
- Proposed splice locations and details of any proprietary splices attached:
Yes
No
NA
- Methods and equipment proposed prevent damage voided or cylinder pile attached:
Yes
No
NA
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-020-01
PILE DRIVING INSTALLATION PLAN FORM
CONSTRUCTION
05/20
Contract No.
Structure Name or No.
FIN Project No.
County
Pile Driving Contractor
HAMMER COMPONENTS
Manufacturer
Model
Serial No.
Type: Diesel
Single/Double acting
Air
Hydraulic
Compressor
Rated Energy
at
Length Stroke
Ram Weight
Anvil Weight (Impact Block)
Modifications
HAMMER CUSHION (CAPBLOCK)
Material
__________ Diameter/Width
___________
Thickness
_______
(HELMET, DRIVING CAP, STRIKER PLATE)
PILE CAP
Inside Diameter or Width
Total Weight
Inside Height
PILE CUSHION
Material
_____________ Diameter/Width
_____________ Area
_________ Thickness
_______________
PILE
Nominal Bearing Resistance or Ultimate Capacity
Type: PCP
Cylinder
Steel H
Steel Pipe: Open-Ended
Closed-Ended
Taper
Timber
Length
Diameter/Width
Area
Wall Thickness
Bottom Plate Thickness
Comments
PILE INSTALLATION
Crane: Mobile/Crawler
Size
Leads: Fixed
Swinging
Semifixed
Template (attach sketches) Fixed to Ground
Fixed to Existing Structure
Comments
Barge:
Yes
No Description
Setting Pile: Predrill
Preform
Water Jet
Punch
Vibratory hammer
Comments
Drill/Jet Equipment
Drilling Depth & Size
Underwater driving:
Yes
No
Follower: (attach sketch)
Length
Height
Special Driving Requirements:
Yes
No Comments
Pile Driving Vibrations: Settlement Monitoring
Vibration Monitoring
Existing structures survey
(Attach details of procedures for protection of existing structures including any special protection measures)
Comments
Method of Determining Production Pile Capacity
Stroke vs. Blows: Saximeter
Bounce Pressure Gauge & Chart
100% Dynamic Testing
Comments
ATTACHMENTS CHECKLIST
- Manufacturer’s Data sheets for the pile driving hammer attached:
Yes
No
- For Double Acting Diesel hammers, charts and recent pressure gauge calibrations attached:
Yes
No
NA
- Details/sketches of followers attached:
Yes
No
NA
- Details/sketches of Templates attached:
Yes
No
- Details of Load Test Equipment and procedures including calibrations of jacks and cells attached:
Yes
No
NA
- Sequence of Pile Driving for each configuration of pile layout attached:
Yes
No
- Details of Proposed features and procedures for protection of existing structures attached:
Yes
No
NA
- Required shop drawings for piles, cofferdams, etc. attached:
Yes
No
- Methods to prevent displacement piles during placement and compaction of fill within 15 ft attached:
Yes
No
- Methods to prevent deflection of battered piles during placement and maintain alignment until pile cap is complete
attached:
Yes
No
NA
- Proposed splice locations and details of any proprietary splices attached:
Yes
No
NA
- Methods and equipment proposed prevent damage voided or cylinder pile attached:
Yes
No
NA