ENG Form 5605-5-R Life Cycle Cost Analysis - Present Worth: One-Step Approach

Form 5605-5-R is a United States Army - U.S. Army Corps of Engineers form also known as the "Life Cycle Cost Analysis - Present Worth: One-step Approach". The latest edition of the form was released in February 1, 1986 and is available for digital filing.

Download an up-to-date fillable Form 5605-5-R in PDF-format down below or look it up on the United States Army - U.S. Army Corps of Engineers Forms website.

ADVERTISEMENT
LIFE CYCLE COST ANALYSIS
Project No. & Title
Installation & Location
PRESENT WORTH:
Design Feature
ONE-STEP APPROACH
Alt. No.
Title
For use of this form, see TM 5-802-1; the proponent agency is USACE.
3
Years
Cost
One Step
Present
$ x 10
Criteria Reference
from
on
Adj.Factor
Worth
One-Time Costs
6
$ x 10
ABD
ABD
Table 1
on ABD
Analysis Base Date (ABD)
Analysis End Date (AED)
Midpoint of Construction
BOD for Analysis
Annual Discount Rate
Differential Escalation
Rate per Year (%)
Type
of Cost
Timeframe:
3
Total
Annual
Total
Present
$ x 10
One Step Adjustment Factor*
No. of
Cost
Nominal Cost
Worth
Annual Costs
6
$ x 10
Table Factor x DOS Correction
Payments
on ABD
on ABD
on ABD
Initial Costs
Energy/Fuel Costs
M&R Costs
Other Costs
Total
+
+
+
+
Net Present Worth:
DA FORM 5605-5-R, DEC 1986
APD LC v1.00
*Use One-Step Table 2 for M&R costs (e = 0).
Sheet
of
Use One-Step Table 3 for energy/fuel costs (e = prescribed e value).
LIFE CYCLE COST ANALYSIS
Project No. & Title
Installation & Location
PRESENT WORTH:
Design Feature
ONE-STEP APPROACH
Alt. No.
Title
For use of this form, see TM 5-802-1; the proponent agency is USACE.
3
Years
Cost
One Step
Present
$ x 10
Criteria Reference
from
on
Adj.Factor
Worth
One-Time Costs
6
$ x 10
ABD
ABD
Table 1
on ABD
Analysis Base Date (ABD)
Analysis End Date (AED)
Midpoint of Construction
BOD for Analysis
Annual Discount Rate
Differential Escalation
Rate per Year (%)
Type
of Cost
Timeframe:
3
Total
Annual
Total
Present
$ x 10
One Step Adjustment Factor*
No. of
Cost
Nominal Cost
Worth
Annual Costs
6
$ x 10
Table Factor x DOS Correction
Payments
on ABD
on ABD
on ABD
Initial Costs
Energy/Fuel Costs
M&R Costs
Other Costs
Total
+
+
+
+
Net Present Worth:
DA FORM 5605-5-R, DEC 1986
APD LC v1.00
*Use One-Step Table 2 for M&R costs (e = 0).
Sheet
of
Use One-Step Table 3 for energy/fuel costs (e = prescribed e value).

Download ENG Form 5605-5-R Life Cycle Cost Analysis - Present Worth: One-Step Approach

1314 times
Rate
4.4(4.4 / 5) 198 votes
ADVERTISEMENT