DA Form 7452-3-R Signal Ground Reference Subsystem Checklist for New Facilities (Lra)

DA Form 7452-3-R - also known as the "Signal Ground Reference Subsystem Checklist For New Facilities (lra)" - is a Military form issued and used by the United States Department of the Army.

The form - often mistakenly referred to as the DD form 7452-3-R - was last revised on February 1, 2002. Download an up-to-date fillable PDF version of the DA 7452-3-R below or request a copy through the chain of command.

ADVERTISEMENT
SIGNAL GROUND REFERENCE SUBSYSTEM CHECKLIST FOR NEW FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
1. FACILITY
2. DATE (YYYYMMDD)
3. LOCATION
4. INSPECTOR
5. SKETCH THE LAYOUT OF THE ACTUAL SIGNAL GROUND REFERENCE SUBSYSTEM (Or attach the up-to-date engineering drawings)
6. CHECK ALL SIGNAL GROUND COMPONENTS FOR PROPER SIZES, TYPES AND MATERIAL AS SPECIFIED. RECORD ALL DEFICIENCIES.
LOCATION
DEFICIENCIES
7. CHECK ALL SIGNAL GROUND COMPONENTS FOR PROPER CONNECTION, BONDING, AND CONTINUITY. RECORD ALL DISCREPANCIES.
LOCATION
DEFICIENCIES
8. GROUND RESISTANCE MEASUREMENTS (Use double balanced dc bridge for all joint connectors)
RESISTANCE MEASUREMENT
TEST POINTS
DA FORM 7452-3-R, FEB 2002
APD LC v1.00
SIGNAL GROUND REFERENCE SUBSYSTEM CHECKLIST FOR NEW FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
1. FACILITY
2. DATE (YYYYMMDD)
3. LOCATION
4. INSPECTOR
5. SKETCH THE LAYOUT OF THE ACTUAL SIGNAL GROUND REFERENCE SUBSYSTEM (Or attach the up-to-date engineering drawings)
6. CHECK ALL SIGNAL GROUND COMPONENTS FOR PROPER SIZES, TYPES AND MATERIAL AS SPECIFIED. RECORD ALL DEFICIENCIES.
LOCATION
DEFICIENCIES
7. CHECK ALL SIGNAL GROUND COMPONENTS FOR PROPER CONNECTION, BONDING, AND CONTINUITY. RECORD ALL DISCREPANCIES.
LOCATION
DEFICIENCIES
8. GROUND RESISTANCE MEASUREMENTS (Use double balanced dc bridge for all joint connectors)
RESISTANCE MEASUREMENT
TEST POINTS
DA FORM 7452-3-R, FEB 2002
APD LC v1.00

Download DA Form 7452-3-R Signal Ground Reference Subsystem Checklist for New Facilities (Lra)

1414 times
Rate
4.3(4.3 / 5) 122 votes
ADVERTISEMENT