Form 700-010-29 "Work Progress Schedule Chart" - Florida

What Is Form 700-010-29?

This is a legal form that was released by the Florida Department of Transportation - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on May 1, 2016;
  • The latest edition provided by the Florida Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form 700-010-29 by clicking the link below or browse more documents and templates provided by the Florida Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form 700-010-29 "Work Progress Schedule Chart" - Florida

Download PDF

Fill PDF online

Rate (4.4 / 5) 34 votes
PAGE _______ of _______
State of Florida Department of Transportation
700-010-29
CONSTRUCTION
WORK PROGRESS SCHEDULE CHART
05/16
FIN PROJ. NO.
F.A. PROJECT NO.
CONTRACT NO.
REPORTING DATE
CONTRACTOR
% COMPLETE
ADDRESS
% TIME ELAPSED
% SCHEDULED COMPLETE
TOTAL CONTRACT AMOUNT:
$0
ITEM
WORK CATEGORIES*
1
1
AMOUNT
2
4
6
8
NOS.
& SUBACTIVITIES
0
2
0
0
0
0
0
0
NOTE: SHOW THE EXACT SEQUENCE OF CONSTRUCTION PLANNED FOR EACH ITEM. THE BEGINNING AND ENDING CONTRACT DAY AND THE DURATION OF THE WORK.
*A LISTING OF CONTRACT ITEMS BY WORK CATEGORY IS INCLUDED IN THE CONTRACT IMMEDIATELY FOLLOWING BID ITEMS.
SUBMITTED IN ACCORDANCE WITH CONTRACT PROVISIONS BY:
ACCEPTED:
CONTRACTOR
DATE
RESIDENT ENGINEER
DATE
PAGE _______ of _______
State of Florida Department of Transportation
700-010-29
CONSTRUCTION
WORK PROGRESS SCHEDULE CHART
05/16
FIN PROJ. NO.
F.A. PROJECT NO.
CONTRACT NO.
REPORTING DATE
CONTRACTOR
% COMPLETE
ADDRESS
% TIME ELAPSED
% SCHEDULED COMPLETE
TOTAL CONTRACT AMOUNT:
$0
ITEM
WORK CATEGORIES*
1
1
AMOUNT
2
4
6
8
NOS.
& SUBACTIVITIES
0
2
0
0
0
0
0
0
NOTE: SHOW THE EXACT SEQUENCE OF CONSTRUCTION PLANNED FOR EACH ITEM. THE BEGINNING AND ENDING CONTRACT DAY AND THE DURATION OF THE WORK.
*A LISTING OF CONTRACT ITEMS BY WORK CATEGORY IS INCLUDED IN THE CONTRACT IMMEDIATELY FOLLOWING BID ITEMS.
SUBMITTED IN ACCORDANCE WITH CONTRACT PROVISIONS BY:
ACCEPTED:
CONTRACTOR
DATE
RESIDENT ENGINEER
DATE
PAGE _______ of _______
State of Florida Department of Transportation
700-010-29
CONSTRUCTION
WORK PROGRESS SCHEDULE CHART
05/16
FIN PROJ. NO.
F.A. PROJECT NO.
CONTRACT NO.
REPORTING DATE
CONTRACTOR
% COMPLETE
ADDRESS
% TIME ELAPSED
INSTRUCTIONS & GENERAL NOTES
1.
If the project specifications require a critical Path Method Schedule, this form is not used.
2.
A single copy of the Work Progress Schedule shall be completed and forwarded to the Engineer by the Contractor within the time specified in the contract.
3.
Use as many sheets as necessary to complete the schduling information (copy "Page 1" tab to use as additional sheets).
4.
Major Work Categories are tabulated below.
Scheduling shall be provided for the major work categories (and their subactivities) applicable for this project. The number of activities and subactivities shall be sufficient to meet the
requirements of the contract provisions.
Bridge Substructure
Material and Equipment Fabrication
Bridge Superstructure
Material and Equipment Procurement
Clearing & Grubbing
Mobilization & Demobilization
Delivery of Materials and Equipment
Peripherals
Drainage Structures
Required Contract Milestone
Earthwork
Shop drawings review time
Erosion Control
Subgrade, Base & Surface
Landscape
Submittal review time
Maintenance of Traffic
Traffic Controls & Aids
Mass Transit-Surface
Utilities
5.
The Contractor shall also provide a concise written description to support the schedule.
6.
Explanation of cells:
Page of 2