CDOT Form 10 "Inspector's Report for Force Account Work" - Colorado

What Is CDOT Form 10?

This is a legal form that was released by the Colorado Department of Transportation - a government authority operating within Colorado. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on April 1, 2017;
  • The latest edition provided by the Colorado Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of CDOT Form 10 by clicking the link below or browse more documents and templates provided by the Colorado Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download CDOT Form 10 "Inspector's Report for Force Account Work" - Colorado

567 times
Rate (4.6 / 5) 28 votes
Project No.:
COLORADO DEPARTMENT OF TRANSPORTATION
INSPECTOR’S REPORT FOR FORCE ACCOUNT WORK
Project Code (SA#):
CMO or F/A No.:
Contractor’s Name:
Subcontractor’s Name:
Description of Work:
Date:
Total Hours
LABOR
Hours
Employee Name
Occupation
ST
OT
ST
OT
ST
OT
ST
OT
ST
OT
ST
OT
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
The hours shown here were checked against the certified
Checked By:
Date:
payrolls.
Shift
Date:
EQUIPMENT
Total Hours
Code No.
st
1
SB
Number of Hours
Rate
0
0
0
0
0
0
0
0
Date:
MATERIAL
Total Units
Type
Unit
Note: A Certified Invoice for Materials is required as part of billing.
Number of Units
0
0
0
0
0
0
0
0
Contractor/Subcontractor Initials
/
/
/
/
/
Billing procedures shall conform to applicable project specifications.
I certify that this is a correct record of employee & equipment hours and material units on the above project as authorized by the above modification
order or agreement.
Date:
Signed:
Title:
Distribution: Region Finals Engineer (original)
CDOT Form 10
04/17
Project File
Previous editions may be used until supplies are exhausted
Contractor
Project No.:
COLORADO DEPARTMENT OF TRANSPORTATION
INSPECTOR’S REPORT FOR FORCE ACCOUNT WORK
Project Code (SA#):
CMO or F/A No.:
Contractor’s Name:
Subcontractor’s Name:
Description of Work:
Date:
Total Hours
LABOR
Hours
Employee Name
Occupation
ST
OT
ST
OT
ST
OT
ST
OT
ST
OT
ST
OT
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
The hours shown here were checked against the certified
Checked By:
Date:
payrolls.
Shift
Date:
EQUIPMENT
Total Hours
Code No.
st
1
SB
Number of Hours
Rate
0
0
0
0
0
0
0
0
Date:
MATERIAL
Total Units
Type
Unit
Note: A Certified Invoice for Materials is required as part of billing.
Number of Units
0
0
0
0
0
0
0
0
Contractor/Subcontractor Initials
/
/
/
/
/
Billing procedures shall conform to applicable project specifications.
I certify that this is a correct record of employee & equipment hours and material units on the above project as authorized by the above modification
order or agreement.
Date:
Signed:
Title:
Distribution: Region Finals Engineer (original)
CDOT Form 10
04/17
Project File
Previous editions may be used until supplies are exhausted
Contractor