CDOT Form 251 "Manufacturer's Certification of Compliance for Metal Culvert Pipe" - Colorado

What Is CDOT Form 251?

This is a legal form that was released by the Colorado Department of Transportation - a government authority operating within Colorado. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on May 1, 1998;
  • The latest edition provided by the Colorado Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of CDOT Form 251 by clicking the link below or browse more documents and templates provided by the Colorado Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download CDOT Form 251 "Manufacturer's Certification of Compliance for Metal Culvert Pipe" - Colorado

900 times
Rate (4.7 / 5) 54 votes
Project
COLORADO DEPARTMENT OF TRANSPORTATION
MANUFACTURER'S CERTIFICATION OF
Location
COMPLIANCE FOR METAL CULVERT PIPE
Date shipped
Contractor
No.
Total
Dia.
Length
Gage
Description
Heat No.
Brand
pieces
length
Manufacturer's Certification:
The material, identified by the listed heat numbers, was manufactured in compliance with
AASHTO Spec. No. ______________________________________________
Signed (Manufacturer's representative)
NOTE TO CDOT PROJECT ENGINEER: Inspection of plant facilities (fabrication process, materials, etc.) are conducted
to assure quality. Final acceptance is based on the results of your field inspection for visual defects. Document final
quantities on CDOT Form #157 with all project 251's attached. Retain mill test reports in project records.
Distribution:
1. Copy to be signed by contractor's representative, return to manufacturer's file.
2. Copy to contractor's representative.
3. Transmit to CDOT Project Engineer with mill certifications attached.
Received by (Contractor's representative)
CDOT Form #251
5/98
Project
COLORADO DEPARTMENT OF TRANSPORTATION
MANUFACTURER'S CERTIFICATION OF
Location
COMPLIANCE FOR METAL CULVERT PIPE
Date shipped
Contractor
No.
Total
Dia.
Length
Gage
Description
Heat No.
Brand
pieces
length
Manufacturer's Certification:
The material, identified by the listed heat numbers, was manufactured in compliance with
AASHTO Spec. No. ______________________________________________
Signed (Manufacturer's representative)
NOTE TO CDOT PROJECT ENGINEER: Inspection of plant facilities (fabrication process, materials, etc.) are conducted
to assure quality. Final acceptance is based on the results of your field inspection for visual defects. Document final
quantities on CDOT Form #157 with all project 251's attached. Retain mill test reports in project records.
Distribution:
1. Copy to be signed by contractor's representative, return to manufacturer's file.
2. Copy to contractor's representative.
3. Transmit to CDOT Project Engineer with mill certifications attached.
Received by (Contractor's representative)
CDOT Form #251
5/98