CDOT Form 518 "Detour Design Data" - Colorado

What Is CDOT Form 518?

This is a legal form that was released by the Colorado Department of Transportation - a government authority operating within Colorado. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on November 1, 1997;
  • The latest edition provided by the Colorado Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of CDOT Form 518 by clicking the link below or browse more documents and templates provided by the Colorado Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download CDOT Form 518 "Detour Design Data" - Colorado

838 times
Rate (4.5 / 5) 42 votes
Date:
Project code
COLORADO DEPARTMENT OF TRANSPORTATION
DETOUR DESIGN DATA
Project No. (Const.)
Use on all projects. For project designer's use. Keep in project files.
Project No. (P.E.)
Organization:
Location:
Prepared by: (Designer)
R-
Current traffic volume:
ADT=
DHV=
% Trucks=
Mainline approach
Remarks
Detour
to detour
TYPICAL SECTION:
1. Lane width
(ft.)
2. Shoulder width
(ft.)
3. Guard rail:
a. Type
b. Shldr. Offset (ft.)
c. End treatment
ALIGNMENT:
1. Horizontal
°
°
a. Max. degree of curve
b. Max. design speed
mph
mph
2. Vertical
a. Crest MDS
mph
mph
b. Sag MDS
mph
mph
3. Max grade
%
%
4. Posted speed
mph
mph
5. Operating speed
mph
mph
0._____
0._____
6. Superelevation
(ft./ft.)
(ft./ft.)
PAVEMENT DESIGN
1. H.B.P. thickness
2. A.B.C. thickness
OTHER:
Construction traffic control (attached), or:
Detour side slope vs. safety (discuss):
R.O.W. (temp. easement, within R.O.W., etc.):
Duration of detour (No. of days):
Time of year in use (month or season):
Attach additional comments, as needed: attachments: q
Approved: (Project Manager)
Date:
l CDOT Resident Engineer
c.c.:
CDOT Form #518
11/97
l Central Files
l Project Manager
Date:
Project code
COLORADO DEPARTMENT OF TRANSPORTATION
DETOUR DESIGN DATA
Project No. (Const.)
Use on all projects. For project designer's use. Keep in project files.
Project No. (P.E.)
Organization:
Location:
Prepared by: (Designer)
R-
Current traffic volume:
ADT=
DHV=
% Trucks=
Mainline approach
Remarks
Detour
to detour
TYPICAL SECTION:
1. Lane width
(ft.)
2. Shoulder width
(ft.)
3. Guard rail:
a. Type
b. Shldr. Offset (ft.)
c. End treatment
ALIGNMENT:
1. Horizontal
°
°
a. Max. degree of curve
b. Max. design speed
mph
mph
2. Vertical
a. Crest MDS
mph
mph
b. Sag MDS
mph
mph
3. Max grade
%
%
4. Posted speed
mph
mph
5. Operating speed
mph
mph
0._____
0._____
6. Superelevation
(ft./ft.)
(ft./ft.)
PAVEMENT DESIGN
1. H.B.P. thickness
2. A.B.C. thickness
OTHER:
Construction traffic control (attached), or:
Detour side slope vs. safety (discuss):
R.O.W. (temp. easement, within R.O.W., etc.):
Duration of detour (No. of days):
Time of year in use (month or season):
Attach additional comments, as needed: attachments: q
Approved: (Project Manager)
Date:
l CDOT Resident Engineer
c.c.:
CDOT Form #518
11/97
l Central Files