Form CON-58 "Notice of Completion of Construction Work - Local Bridge Program" - Connecticut

What Is Form CON-58?

This is a legal form that was released by the Connecticut Department of Transportation - a government authority operating within Connecticut. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on September 1, 1992;
  • The latest edition provided by the Connecticut Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form CON-58 by clicking the link below or browse more documents and templates provided by the Connecticut Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form CON-58 "Notice of Completion of Construction Work - Local Bridge Program" - Connecticut

755 times
Rate (4.3 / 5) 53 votes
CON-58 REV. 9/92 (LOCAL BRIDGE PROGRAM)
STATE OF CONNECTICUT
NOTICE OF COMPLETION OF CONSTRUCTION WORK
DEPARTMENT OF TRANSPORTATION
BUREAU OF ENGINEERING & HIGHWAY OPERATIONS
FEDERAL AID NO.
PROJECT NO.
DATE
N/A
TOWN
ROUTE OR ROAD
CONTRACTOR
TOTAL LENGTH
DATE STARTED
DATE COMPLETED
DATE OPEN TO TRAFFIC
SLAB OR ROAD
1.
NAME OF ROAD OR STRUCTURE
DESCRIPTION OF IMPROVEMENT
LENGTH
WIDTH
BEGINNING:
ENDING:
SLAB OR ROAD
2.
NAME OF ROAD OR STRUCTURE
DESCRIPTION OF IMPROVEMENT
LENGTH
WIDTH
BEGINNING:
ENDING:
SLAB OR ROAD
3.
NAME OF ROAD OR STRUCTURE
DESCRIPTION OF IMPROVEMENT
LENGTH
WIDTH
BEGINNING:
ENDING:
Municipal
MAINTENANCE RESPONSIBILITY:
AGREEMENT:
COMMENTS:
I hereby certify that the above project was completed in accordance with the final plans and specifications submitted to
the Local Bridge Program, except as noted above, as of the Date Completed shown above.
Signature:
(Chief Elected Official, Town Manager, or other Officer Duly Authorized)
cc: Bridge Safety
CON-58 REV. 9/92 (LOCAL BRIDGE PROGRAM)
STATE OF CONNECTICUT
NOTICE OF COMPLETION OF CONSTRUCTION WORK
DEPARTMENT OF TRANSPORTATION
BUREAU OF ENGINEERING & HIGHWAY OPERATIONS
FEDERAL AID NO.
PROJECT NO.
DATE
N/A
TOWN
ROUTE OR ROAD
CONTRACTOR
TOTAL LENGTH
DATE STARTED
DATE COMPLETED
DATE OPEN TO TRAFFIC
SLAB OR ROAD
1.
NAME OF ROAD OR STRUCTURE
DESCRIPTION OF IMPROVEMENT
LENGTH
WIDTH
BEGINNING:
ENDING:
SLAB OR ROAD
2.
NAME OF ROAD OR STRUCTURE
DESCRIPTION OF IMPROVEMENT
LENGTH
WIDTH
BEGINNING:
ENDING:
SLAB OR ROAD
3.
NAME OF ROAD OR STRUCTURE
DESCRIPTION OF IMPROVEMENT
LENGTH
WIDTH
BEGINNING:
ENDING:
Municipal
MAINTENANCE RESPONSIBILITY:
AGREEMENT:
COMMENTS:
I hereby certify that the above project was completed in accordance with the final plans and specifications submitted to
the Local Bridge Program, except as noted above, as of the Date Completed shown above.
Signature:
(Chief Elected Official, Town Manager, or other Officer Duly Authorized)
cc: Bridge Safety