"Contractor's Cost Proposal for Change Order Including Overhead & Profit (Public Buildings and Tech Support)" - New York City

Contractor's Cost Proposal for Change Order Including Overhead & Profit (Public Buildings and Tech Support) is a legal document that was released by the New York City Department of Design and Construction - a government authority operating within New York City.

Form Details:

  • Released on October 15, 1999;
  • The latest edition currently provided by the New York City Department of Design and Construction;
  • Ready to use and print;
  • Easy to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of the form by clicking the link below or browse more documents and templates provided by the New York City Department of Design and Construction.

ADVERTISEMENT
ADVERTISEMENT

Download "Contractor's Cost Proposal for Change Order Including Overhead & Profit (Public Buildings and Tech Support)" - New York City

Download PDF

Fill PDF online

Rate (4.6 / 5) 31 votes
CITY OF NEW YORK
DEPARTMENT OF DESIGN AND CONSTRUCTION
DIVISIONS OF STRUCTURES AND TECHNICAL SUPPORT
SHEET ______ OF _______
CONTRACTOR’S COST PROPOSAL FOR CHANGE ORDER (1)
(Use this form for items that include overhead & profit [or items for which overhead & profit are not payable, i.e., payroll taxes and premium portion of overtime pay], and prime contractor’s profit in their cost
calculations. Note: Within 14 ccds max. from receipt of Part A of the Contract Change Form, Contractor must complete their cost proposal and be fully prepared to attend scheduled negotiation meetings.)
PROJECT NAME _________________________________________ CONTRACT REG. NO _________________ VENDOR’S NAME __________________________________ C.O. NO. ________
E. LABOR
F. MATERIAL
A. ITEM
B. ITEM DESCRIPTION
C. QTY
D. UNIT
(INCLUDING EQUIPMENT)
G. UNIT PRICE *
H. CONTRACTOR’S
(E.1. + F.1.)
NO.µ
ESTIMATE
1. UNIT COST
2. TOTAL
1. UNIT COST
2. TOTAL
(E.2. + F.2.)
(E.1. X C)
(F.1. X C)
1. µ Identify all items to be subcontracted with a star. Structures’ Contractors to use CSI numbers and format.
$
NOTES:
TOTAL (THIS SHEET)
GRAND TOTAL (LAST SHEET)
$
2. * Designate all unit prices that are original bid or contract unit prices with an asterisk.
3. Detailed back-up documentation, as required, must be available at the site for auditing purposes for all costs shown above.
PREPARED BY:
________________________________________________________________
____________________________
____________________________________________________________________
____________
(Print Contractor’s Name)
(Title)
(Signature)
(Date)
12estimate
09/01/98; rev.
10/15/99
CITY OF NEW YORK
DEPARTMENT OF DESIGN AND CONSTRUCTION
DIVISIONS OF STRUCTURES AND TECHNICAL SUPPORT
SHEET ______ OF _______
CONTRACTOR’S COST PROPOSAL FOR CHANGE ORDER (1)
(Use this form for items that include overhead & profit [or items for which overhead & profit are not payable, i.e., payroll taxes and premium portion of overtime pay], and prime contractor’s profit in their cost
calculations. Note: Within 14 ccds max. from receipt of Part A of the Contract Change Form, Contractor must complete their cost proposal and be fully prepared to attend scheduled negotiation meetings.)
PROJECT NAME _________________________________________ CONTRACT REG. NO _________________ VENDOR’S NAME __________________________________ C.O. NO. ________
E. LABOR
F. MATERIAL
A. ITEM
B. ITEM DESCRIPTION
C. QTY
D. UNIT
(INCLUDING EQUIPMENT)
G. UNIT PRICE *
H. CONTRACTOR’S
(E.1. + F.1.)
NO.µ
ESTIMATE
1. UNIT COST
2. TOTAL
1. UNIT COST
2. TOTAL
(E.2. + F.2.)
(E.1. X C)
(F.1. X C)
1. µ Identify all items to be subcontracted with a star. Structures’ Contractors to use CSI numbers and format.
$
NOTES:
TOTAL (THIS SHEET)
GRAND TOTAL (LAST SHEET)
$
2. * Designate all unit prices that are original bid or contract unit prices with an asterisk.
3. Detailed back-up documentation, as required, must be available at the site for auditing purposes for all costs shown above.
PREPARED BY:
________________________________________________________________
____________________________
____________________________________________________________________
____________
(Print Contractor’s Name)
(Title)
(Signature)
(Date)
12estimate
09/01/98; rev.
10/15/99