Form MURK7 "Daily Work Report - Structural Steel Painting: Field Applied" - New York

What Is Form MURK7?

This is a legal form that was released by the New York State Department of Transportation - a government authority operating within New York. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on June 1, 2008;
  • The latest edition provided by the New York State Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form MURK7 by clicking the link below or browse more documents and templates provided by the New York State Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form MURK7 "Daily Work Report - Structural Steel Painting: Field Applied" - New York

Download PDF

Fill PDF online

Rate (4.6 / 5) 19 votes
MURK 7
Metric
(06/08)
English
DAILY WORK REPORT - STRUCTURAL STEEL PAINTING: FIELD APPLIED
JOB STAMP
Date:
Day of Week
S
M
T
W
T
F
S
:
Sheet No.
DWR No.
of
CONTRACTOR WORK HOURS:
TO
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
WEATHER & ATMOSPHERIC CONDITIONS*
PAINT TEMP
WORK OPERATION
TIME
AIR TEMP
STEEL TEMP
DEW POINT
% HUMIDITY
(FROM STORAGE)
*VALUES SHALL BE MEASURED AND RECORDED JUST PRIOR TO WORK OPERATIONS
SURFACE PREPARATION
ABRASIVE BLASTING
PRESSURE WASHING
AREA BLASTED
SUPPLY
HOSE LENGTH
START TIME
END TIME
# OF NOZZLES
OPERATING PRESSURE
(m ²)
PRESSURE(kPa)
(m)
FLOW RATE
WATER TEMPERATURE
WATER SOURCE
ABRASIVE
STEEL GRIT CLEANLINESS - SSPC AB2 - TOTAL REMOVAL ONLY
ABRASIVE MIX
NON-ABRASIVE RESIDUE TEST (% BY WT. OF WORK MIX SAMPLE)
ABRASIVE ADDED
WATER-SOLUABLE CONTAMINANTS (microns/cm - ASTM D4940)
(AMOUNT & TYPE)
CLEANING STANDARD VERIFIED
OIL CONTENT VISIBLE?
YES
NO
§
§
( 573-03.02C & 574-03.02C)
BLAST PROFILE - ATTACH ADDITIONAL
LEAD CONTENT (% BY WEIGHT- WEEKLY TEST)
PROFILE DATA IF NECESSARY
MEASUREMENT
PROFILE
CONDITION BEFORE & AFTER SURFACE PREP - SSPC
VIS 1 OR
VIS 3
LOCATIONS
(ATTACH REPLICA TAPE)
A
B
C
D
E
F
G1
G2
G3
CONDITION BEFORE SURFACE PREP
SP10
SP11
UNACCEPTABLE
CONDITION AFTER SURFACE PREP
INTERIM
FINAL
QTY
CEES
CONTRACT
FS
ES
UNITS
LOCATION OF WORK
ENT
CHK
QUANTITY
QUANTITY
CHK
PAY ITEM NO
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature:
Date Prepared:
Engineer-in-Charge
Reviewed by:
Date Reviewed:
Resident Engineer
MURK 7-1 CONTINUATION attached for additional DFT measurements
MURK 1-1 CONTINUATION attached for additional narrative.
MURK 7
Metric
(06/08)
English
DAILY WORK REPORT - STRUCTURAL STEEL PAINTING: FIELD APPLIED
JOB STAMP
Date:
Day of Week
S
M
T
W
T
F
S
:
Sheet No.
DWR No.
of
CONTRACTOR WORK HOURS:
TO
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
WEATHER & ATMOSPHERIC CONDITIONS*
PAINT TEMP
WORK OPERATION
TIME
AIR TEMP
STEEL TEMP
DEW POINT
% HUMIDITY
(FROM STORAGE)
*VALUES SHALL BE MEASURED AND RECORDED JUST PRIOR TO WORK OPERATIONS
SURFACE PREPARATION
ABRASIVE BLASTING
PRESSURE WASHING
AREA BLASTED
SUPPLY
HOSE LENGTH
START TIME
END TIME
# OF NOZZLES
OPERATING PRESSURE
(m ²)
PRESSURE(kPa)
(m)
FLOW RATE
WATER TEMPERATURE
WATER SOURCE
ABRASIVE
STEEL GRIT CLEANLINESS - SSPC AB2 - TOTAL REMOVAL ONLY
ABRASIVE MIX
NON-ABRASIVE RESIDUE TEST (% BY WT. OF WORK MIX SAMPLE)
ABRASIVE ADDED
WATER-SOLUABLE CONTAMINANTS (microns/cm - ASTM D4940)
(AMOUNT & TYPE)
CLEANING STANDARD VERIFIED
OIL CONTENT VISIBLE?
YES
NO
§
§
( 573-03.02C & 574-03.02C)
BLAST PROFILE - ATTACH ADDITIONAL
LEAD CONTENT (% BY WEIGHT- WEEKLY TEST)
PROFILE DATA IF NECESSARY
MEASUREMENT
PROFILE
CONDITION BEFORE & AFTER SURFACE PREP - SSPC
VIS 1 OR
VIS 3
LOCATIONS
(ATTACH REPLICA TAPE)
A
B
C
D
E
F
G1
G2
G3
CONDITION BEFORE SURFACE PREP
SP10
SP11
UNACCEPTABLE
CONDITION AFTER SURFACE PREP
INTERIM
FINAL
QTY
CEES
CONTRACT
FS
ES
UNITS
LOCATION OF WORK
ENT
CHK
QUANTITY
QUANTITY
CHK
PAY ITEM NO
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature:
Date Prepared:
Engineer-in-Charge
Reviewed by:
Date Reviewed:
Resident Engineer
MURK 7-1 CONTINUATION attached for additional DFT measurements
MURK 1-1 CONTINUATION attached for additional narrative.
MURK 7 REVERSE
(04/08)
COATING
MANUFACTURE
THINNER
AMOUNT
RESULTANT
SPECIFIED
SPECIFIED
NAME OF PAINT
BATCH NUMBER
MM/DD/YYYY
USED
USED (L)
VOC LEVEL*
DFT RANGE*
PROFILE*
* FROM MANUFACTURER'S TECHNICAL DATA SHEETS
DRY FILM THICKNESS (DFT) - SSPC PA-2
DRY FILM THICKNESS GAUGE CALIBRATED DAILY PRIOR TO TAKING MEASUREMENTS?
YES
NO
LOCATION OF AREA MEASURED:
DFT FOR PREVIOUS COAT(S) RECORDED IN APPLICATION AREA:
GAUGE READINGS
SPOT MEASUREMENT
AVERAGE OF SPOT MEASUREMENTS
LABOR
EQUIPMENT
CLASSIFICATION
OP 1
OP 2
OP 3
OP 4
ID #
OP 1
OP 2
OP 3
OP 4
TYPE
FOREPERSON
PAINTERS
LABORER
EQUIP OPERATOR
TRUCK DRIVERS
OWNER OPERATORS
OP 1:
OP 2:
OP 3:
OP 4:
Print Form
Page of 2