Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio

Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio

What Is Attachment A5?

This is a legal form that was released by the Ohio Environmental Protection Agency - a government authority operating within Ohio. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Attachment A5?
A: Attachment A5 is a Permit to Install Application Form for a Solid Waste Incinerator or Energy Recovery Facility in Ohio.

Q: What is a solid waste incinerator?
A: A solid waste incinerator is a facility designed to burn solid waste at high temperatures, reducing its volume and converting it into energy.

Q: What is an energy recovery facility?
A: An energy recovery facility is a facility that uses waste as fuel to generate electricity or heat.

Q: What is the purpose of the Permit to Install Application Form?
A: The Permit to Install Application Form is used to apply for a permit to construct and operate a solid waste incinerator or energy recovery facility in Ohio.

Q: Who needs to fill out this application form?
A: Any individual or organization planning to construct and operate a solid waste incinerator or energy recovery facility in Ohio needs to fill out this application form.

Q: What information is required in the application form?
A: The application form requires detailed information about the proposed facility, including its location, design, engineering, emissions control measures, and compliance with environmental regulations.

Q: Are there any fees associated with the permit application?
A: Yes, there are fees associated with the permit application. The specific fees depend on the size and type of the proposed facility and are outlined in the application form.

Q: Is there a deadline for submitting the permit application?
A: The deadline for submitting the permit application may vary. It is advisable to contact the appropriate regulatory agency to determine the specific deadline.

Q: What happens after the application is submitted?
A: After the application is submitted, it will be reviewed by the regulatory agency. The agency will assess the proposed facility's compliance with environmental regulations and may request additional information or modifications before issuing the permit.

ADVERTISEMENT

Form Details:

  • The latest edition provided by the Ohio Environmental Protection Agency;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;

Download a printable version of Attachment A5 by clicking the link below or browse more documents and templates provided by the Ohio Environmental Protection Agency.

Download Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio

4.4 of 5 (61 votes)
  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio

    1

  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 2

    2

  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 3

    3

  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 4

    4

  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 5

    5

  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 6

    6

  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 1
  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 2
  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 3
  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 4
  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 5
  • Attachment A5 Permit to Install Application Form - Solid Waste Incinerator or Energy Recovery Facility - Ohio, Page 6
Prev 1 2 3 4 5 6 Next
ADVERTISEMENT

Related Documents