DHEC Form 2909 "Ongoing Compliance Status Report" - South Carolina

DHEC Form 2909 or the "Ongoing Compliance Status Report" is a form issued by the South Carolina Department of Health and Environmental Control.

The form was last revised in November 1, 2009 and is available for digital filing. Download an up-to-date DHEC Form 2909 in PDF-format down below or look it up on the South Carolina Department of Health and Environmental Control Forms website.

ADVERTISEMENT

Download DHEC Form 2909 "Ongoing Compliance Status Report" - South Carolina

1405 times
Rate
(4.6 / 5) 98 votes
Ongoing Compliance Status Report
Applicable Rule:
40 CFR Part 63, Subpart N-National Emission Standards for Chromium Emissions from Hard and
Decorative Chromium Electroplating and Chromium Anodizing Tanks
1. Print or type the following for each plant in which a chromium electroplating and / or chromium anodizing operations
are performed.
Owner / Operator / Title:
Street Address:
City:
State:
Zip Code:
Plant Name:
Plant Phone Number:
Plant Contact / Title:
Plant Address (if different than owner / operator's):
Street Address:
City:
State:
Zip:
2. Complete the following table, if additional lines are needed, make copies of this page.
Operating parameter
Acceptable value or range
Total operating
Tank
Applicable
Type of
Control
monitored to
Type of tank
of values for
time during
ID#
emission limit
control technique
system ID#
demonstrate
monitored parameter(s)
reporting period
compliance
Example Response
Operating parameter
Acceptable value or range
Total operating
Tank
Applicable
Type of
Control
monitored to
Type of tank
of values for
time during
ID#
emission limit
control technique
system ID#
demonstrate
monitored parameter(s)
reporting period
compliance
Hard chrome
7 in. w.c. +2 in.
1,040 hr
0.015 mg / dscm
Composite Mesh
10
pressure drop
1
plating
surface tension using
Chrome
2
45 dynes / cm
fume suppressant
1,040 hr.
N / A
<45 dynes / cm
anodizing
stalagmometer
Hard chrome
Mesh pad w /
7 in. w.c. +2 in.
1,040 hr
0.015 mg / dscm
12
pressure drop
3
plating
packed bed scrubber
3. Identify the beginning and ending dates of the reporting period: Begining ____/____/____ Ending ____/____/____
4. For hard chromium electroplating tanks that are limiting their maximum cumulative recitifier capacity in accordance
with 40 CFR 63.342 (c)(2), complete the following table for this reporting period:
Total ampere-hours
Ampere-hours consumed by month
consumed during reporting
Tank ID#
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
period
SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
DHEC 2909 (11/2009)
Page 1 of 2
Ongoing Compliance Status Report
Applicable Rule:
40 CFR Part 63, Subpart N-National Emission Standards for Chromium Emissions from Hard and
Decorative Chromium Electroplating and Chromium Anodizing Tanks
1. Print or type the following for each plant in which a chromium electroplating and / or chromium anodizing operations
are performed.
Owner / Operator / Title:
Street Address:
City:
State:
Zip Code:
Plant Name:
Plant Phone Number:
Plant Contact / Title:
Plant Address (if different than owner / operator's):
Street Address:
City:
State:
Zip:
2. Complete the following table, if additional lines are needed, make copies of this page.
Operating parameter
Acceptable value or range
Total operating
Tank
Applicable
Type of
Control
monitored to
Type of tank
of values for
time during
ID#
emission limit
control technique
system ID#
demonstrate
monitored parameter(s)
reporting period
compliance
Example Response
Operating parameter
Acceptable value or range
Total operating
Tank
Applicable
Type of
Control
monitored to
Type of tank
of values for
time during
ID#
emission limit
control technique
system ID#
demonstrate
monitored parameter(s)
reporting period
compliance
Hard chrome
7 in. w.c. +2 in.
1,040 hr
0.015 mg / dscm
Composite Mesh
10
pressure drop
1
plating
surface tension using
Chrome
2
45 dynes / cm
fume suppressant
1,040 hr.
N / A
<45 dynes / cm
anodizing
stalagmometer
Hard chrome
Mesh pad w /
7 in. w.c. +2 in.
1,040 hr
0.015 mg / dscm
12
pressure drop
3
plating
packed bed scrubber
3. Identify the beginning and ending dates of the reporting period: Begining ____/____/____ Ending ____/____/____
4. For hard chromium electroplating tanks that are limiting their maximum cumulative recitifier capacity in accordance
with 40 CFR 63.342 (c)(2), complete the following table for this reporting period:
Total ampere-hours
Ampere-hours consumed by month
consumed during reporting
Tank ID#
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
period
SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
DHEC 2909 (11/2009)
Page 1 of 2
Example Response
Total ampere-hours
Ampere-hours consumed by month
Tank ID#
consumed during reporting
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
period
1
400,000
400,000
400,000
200,000
200,000
200,000
1,800,000
3
300,000
300,000
300,000
300,000
300,000
300,000
1,800,000
Total for all tanks
700,000
700,000
700,000
500,000
500,000
500,000
3,600,000
5. Attach all Monitoring Data Forms for the reporting period. Based on the data on excess emissions and the data on
operating times, calculate the following hours:
Duration of excess emissions caused by:
Hours
Percent of total operating time
Process upsets
Control equipment malfunctions
Other known causes
Unknown causes
Total duration of excess emissions
6. Check the box that applies.
o During this reporting period, the work practices identified in 40 CFR 63.342 (f) were followed in accordance with
the operation and maintenance plan for this source.
o During this reporting period, the work practices identified in 40 CFR 63.342 (f) were not followed in accordance
with the operation and maintenance plan for this source.
7. If the operation and maintenance plan was not followed during the reporting period, please provide an explanation of
the reasons for not following the provisions in the plan, an assessment of whether any excess emissions and /or
parameter monitoring exceedances are believed to have occurred, and a copy of the appropriate records
documenting that the operation and maintenance plan was not followed. Please state whether or not the plan is being
revised accordingly.
8. Please describe any changes in monitoring, processes, or controls since the last reporting period.
9. Print or type the name and title of the Responsible Official for the plant:
(Name)
(Title)
A Responsible Official can be:
l The president, vice-president, secretary, or treasurer of the company that owns the plant;
l The owner of the plant;
l The plant engineer or supervisor;
l A government official if the plant is owned by the Federal, State, City, or County government, or
l A ranking military officer if the plant is located on a military base.
I certify the information contained in this report to be accurate and true to the best of my knowledge.
(Signature or Responsible Official)
(Date)
Page 2 of 2