Form ECY040-140 "Intermediate Solid Waste Handling Facilities Checklist for Review of Solid Waste Permit Application Per Wac 173-350-310" - Washington

What Is Form ECY040-140?

This is a legal form that was released by the Washington State Department of Ecology - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on May 1, 2005;
  • The latest edition provided by the Washington State Department of Ecology;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form ECY040-140 by clicking the link below or browse more documents and templates provided by the Washington State Department of Ecology.

ADVERTISEMENT
ADVERTISEMENT

Download Form ECY040-140 "Intermediate Solid Waste Handling Facilities Checklist for Review of Solid Waste Permit Application Per Wac 173-350-310" - Washington

692 times
Rate (4.4 / 5) 35 votes
INTERMEDIATE SOLID WASTE HANDLING
FACILITIES
(Material recovery facilities, transfer stations, baling and
compaction sites, and drop boxes)
Checklist for Review of Solid Waste Permit Application
per WAC 173-350-310
Name of Applicant:
Name of Facility:
Permit # assigned by Health Department:
Date Received:
Lead Agency Reviewer
Determination of Compliance with:
Name:
The Site or Facility:
meets all solid waste, air and other applicable
Phone:
laws and regulations
conforms with the approved comprehensive solid
Signature:
waste handling plan
 c omplies with zoning requirements (JHD only)
Complete
Meets
Location
Date &
ocation requirements
L
Requirements
of material
Initials of
WAC 173-350-310(3)
Reviewer)
There are no specific location standards for
intermediate solid waste handling facilities subject
to this chapter; however intermediate solid waste
handling facilities must meet the requirements
provided under WAC 173-350-040(5).
Agency Comments:
Location
Complete
Meets
Date &
Design Standards
Requirements
of material
Initials of
WAC 173-350-310(4)
Reviewer)
Material recovery facilities, transfer stations,
baling and compaction sites:
Control public access and prevent unauthorized
vehicular traffic and illegal dumping of waste
Be sturdy and constructed of easily cleanable
materials
Provide effective means to control rodents,
insects, birds and other vectors
Provide effective means to control litter
Provide protection of the tipping floor from
wind, rain or snow
ECY 040-140 Intermediate (5/05)
Page 1
INTERMEDIATE SOLID WASTE HANDLING
FACILITIES
(Material recovery facilities, transfer stations, baling and
compaction sites, and drop boxes)
Checklist for Review of Solid Waste Permit Application
per WAC 173-350-310
Name of Applicant:
Name of Facility:
Permit # assigned by Health Department:
Date Received:
Lead Agency Reviewer
Determination of Compliance with:
Name:
The Site or Facility:
meets all solid waste, air and other applicable
Phone:
laws and regulations
conforms with the approved comprehensive solid
Signature:
waste handling plan
 c omplies with zoning requirements (JHD only)
Complete
Meets
Location
Date &
ocation requirements
L
Requirements
of material
Initials of
WAC 173-350-310(3)
Reviewer)
There are no specific location standards for
intermediate solid waste handling facilities subject
to this chapter; however intermediate solid waste
handling facilities must meet the requirements
provided under WAC 173-350-040(5).
Agency Comments:
Location
Complete
Meets
Date &
Design Standards
Requirements
of material
Initials of
WAC 173-350-310(4)
Reviewer)
Material recovery facilities, transfer stations,
baling and compaction sites:
Control public access and prevent unauthorized
vehicular traffic and illegal dumping of waste
Be sturdy and constructed of easily cleanable
materials
Provide effective means to control rodents,
insects, birds and other vectors
Provide effective means to control litter
Provide protection of the tipping floor from
wind, rain or snow
ECY 040-140 Intermediate (5/05)
Page 1
Provide pollution control measures to protect
surface and ground waters, including runoff
collection and discharge designed to handle a
twenty-five-year storm as defined in WAC
173-350-100, and equipment cleaning and
washdown water
Provide pollution control measures to protect
air quality
Provide all-weather surfaces for vehicular
traffic
Drop boxes shall be constructed of durable
watertight materials with a lid or screen on top that
prevents the loss of materials during transport and
access by rats and other vermin
Agency Comments:
Location
Complete
Meets
Date &
Plan of operations
Requirements
of material
Initials of
WAC 173-350-310(5)(e)
Reviewer)
A description of the types of solid wastes to be
handled at the facility (5)(e)(i)
A description of how solid wastes are to be handled
on-site during the facility's life, including maximum
facility capacity, methods of adding or removing
waste from the facility and equipment used
(5)(e)(ii)
A description of the procedures used to ensure that
dangerous waste and other unacceptable waste are
not accepted at the facility (5)(3)(iii)
Safety and emergency plans (5)(e)(iv)
A description of how equipment, structures and
other systems are to be inspected and maintained,
including the frequency of inspection and
inspection logs (5)(e)(v)
For putrescible wastes, a nuisance odor
management plan describing the actions to be taken
to control nuisance odors (5)(e)(vi)
NA
Forms used to record volumes or weights (5)(e)(vii)
Other such details to demonstrate that the facility
will be operated in accordance with subsection 4
and as required by the JHD (5)(e)(viii)
Agency Comments:
Complete
Meets
Location
Date &
Ground Water Monitoring
Requirements
of material
Initials of
Requirements WAC 173-350-310(6)
Reviewer)
ECY 040-140 Intermediate (5/05)
Page 2
There are no specific ground water monitoring
requirements for intermediate solid waste handling
facilities subject to this chapter; however,
intermediate solid waste handling facilities must
meet the requirements provided under WAC 173-
350-040(5)
Agency Comments:
Complete
Meets
Location
Date &
Closure plan
Requirements
of material
Initials of
WAC 173-350-310(7)(b)
Reviewer)
Methods of removing wastes
Agency Comments:
Complete
Meets
Location
Date &
Financial Assurance Requirements
Requirements
of material
Initials of
WAC 173-350-310(8)
Reviewer)
There are no specific financial assurance
requirements for intermediate solid waste handling
facilities subject to this chapter; however,
intermediate solid waste handling facilities must
meet the requirements provided under WAC 173-
350-040(5)
Agency Comments:
If you require this publication in an alternate format, please contact the Solid Waste & Financial Assistance Program
at 360-407-6900 or TTY (for the speech and hearing impaired) at 711 or 800-833-6388.
ECY 040-140 Intermediate (5/05)
Page 3
Page of 3