Drilled Pier Inspection Form - Slurry Method - North Carolina

Drilled Pier Inspection Form - Slurry Method - North Carolina

Drilled Pier Inspection Form - Slurry Method is a legal document that was released by the North Carolina Department of Transportation - a government authority operating within North Carolina.

FAQ

Q: What is the purpose of a drilled pier inspection form?
A: The purpose of a drilled pier inspection form is to document and record the inspection of drilled piers.

Q: What is the slurry method for drilled pier construction?
A: The slurry method is a technique used in drilled pier construction where a slurry is pumped into the borehole to stabilize the excavation.

Q: What does the North Carolina drilled pier inspection form include?
A: The North Carolina drilled pier inspection form includes sections for recording information about the pier, drilling equipment, slurry materials, and inspection findings.

Q: Who is responsible for completing the drilled pier inspection form?
A: The person conducting the inspection is responsible for completing the drilled pier inspection form.

ADVERTISEMENT

Form Details:

  • Released on October 1, 2019;
  • The latest edition currently provided by the North Carolina Department of Transportation;
  • Ready to use and print;
  • Easy to customize;
  • Compatible with most PDF-viewing applications;

Download a fillable version of the form by clicking the link below or browse more documents and templates provided by the North Carolina Department of Transportation.

Download Drilled Pier Inspection Form - Slurry Method - North Carolina

4.7 of 5 (15 votes)
  • Drilled Pier Inspection Form - Slurry Method - North Carolina

    1

  • Drilled Pier Inspection Form - Slurry Method - North Carolina, Page 2

    2

  • Drilled Pier Inspection Form - Slurry Method - North Carolina, Page 1
  • Drilled Pier Inspection Form - Slurry Method - North Carolina, Page 2
Prev 1 2 Next
ADVERTISEMENT