Stage I Installation / Substantial Modification Notification - Rhode Island

Stage I Installation / Substantial Modification Notification - Rhode Island

Stage I Installation/Substantial Modification Notification is a legal document that was released by the Rhode Island Department of Environmental Management - a government authority operating within Rhode Island.

FAQ

Q: What is a Stage I Installation/Substantial Modification Notification?A: A Stage I Installation/Substantial Modification Notification is a form that must be filled out and submitted to the Rhode Island Department of Environmental Management (RIDEM) when installing or making significant modifications to Stage I vapor recovery systems at gasoline dispensing facilities.

Q: What is a Stage I vapor recovery system?A: A Stage I vapor recovery system is an emission control system designed to capture gasoline vapors during refueling at gasoline dispensing facilities.

Q: Who needs to submit a Stage I Installation/Substantial Modification Notification?A: Any gasoline dispensing facility in Rhode Island that is installing or making significant modifications to a Stage I vapor recovery system must submit a notification to RIDEM.

Q: What information is required on the notification form?A: The notification form requires information such as the facility's contact information, the type of Stage I system being installed or modified, and the expected completion date of the installation or modification.

Q: What happens after I submit the notification form?A: After submitting the notification form, the facility will receive a confirmation letter from RIDEM. RIDEM may also conduct an inspection of the facility to ensure compliance with the Stage I vapor recovery requirements.

Q: Are there any fees associated with submitting a Stage I Installation/Substantial Modification Notification?A: Currently, there are no fees associated with submitting a Stage I Installation/Substantial Modification Notification in Rhode Island.

Q: What are the consequences of not submitting a Stage I Installation/Substantial Modification Notification?A: Failure to submit a Stage I Installation/Substantial Modification Notification may result in penalties and enforcement actions by RIDEM, including fines and the possibility of having the facility's operating permits revoked.

ADVERTISEMENT

Form Details:

  • The latest edition currently provided by the Rhode Island Department of Environmental Management;
  • Ready to use and print;
  • Easy to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of the form by clicking the link below or browse more documents and templates provided by the Rhode Island Department of Environmental Management.

Download Stage I Installation / Substantial Modification Notification - Rhode Island

4.4 of 5 (30 votes)
  • Stage I Installation/Substantial Modification Notification - Rhode Island

    1

  • Stage I Installation/Substantial Modification Notification - Rhode Island, Page 2

    2

  • Stage I Installation/Substantial Modification Notification - Rhode Island, Page 3

    3

  • Stage I Installation/Substantial Modification Notification - Rhode Island, Page 4

    4

  • Stage I Installation / Substantial Modification Notification - Rhode Island, Page 1
  • Stage I Installation / Substantial Modification Notification - Rhode Island, Page 2
  • Stage I Installation / Substantial Modification Notification - Rhode Island, Page 3
  • Stage I Installation / Substantial Modification Notification - Rhode Island, Page 4
Prev 1 2 3 4 Next
ADVERTISEMENT