Form 2440-1B "Final Field Plan Review Inspection Request Checklist" - Georgia (United States)

What Is Form 2440-1B?

This is a legal form that was released by the Georgia Department of Transportation - a government authority operating within Georgia (United States). As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on March 15, 2021;
  • The latest edition provided by the Georgia Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form 2440-1B by clicking the link below or browse more documents and templates provided by the Georgia Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form 2440-1B "Final Field Plan Review Inspection Request Checklist" - Georgia (United States)

Download PDF

Fill PDF online

Rate (4.3 / 5) 6 votes
GDOT Publications
Policies & Procedures
Form Word:
2440-1b - Final Field Plan Review Inspection Checklist
Section:Plan Review
Reports To: Chief Engineer
Office/Department: Engineering Services
Contact: 404-631-1000
FINAL FIELD PLAN REVIEW INSPECTION REQUEST CHECKLIST
The following Checklist shall be completed by the Design Phase Leader and submitted when a Final Field Plan Review Inspection is
requested. All necessary items are required in order to schedule a Final Field Plan Review Inspection. Failure to do so will delay the
FFPR. Note: The Project Review Engineer may grant exceptions to these requirements.
The request shall include:
Transmittal letter including description of project
Printout of the Detailed Cost Estimate Report from GDOT 411
Environmental “Green Sheet” (Signed by the Project Manager)
Written certification stating that the current design for the proposed project is consistent with the approved RTP/TIP/STIP or that
the design or concept has not changed since the letter issued by the Office of Planning at the PFPR Stage. For projects in the non-
attainment areas the certification should come from the State Transportation Planning Administrator. For other projects, including
projects exempt from for air quality analysis, written certification comes from the Design Phase Leader/Engineer of Record.
The completed plans (two (2) 11x17 sets) shall include all plans that will be part of the contract. Examples are:
Roadway Plans
N/A Approved Bridge Plans (with approval letter/email from the Office of Bridge Design)
N/A Approved Special Design Wall Plans (with approval letter/email from the Office of Bridge Design)
N/A Retaining Wall Plans
N/A Noise Wall Plans and Details
N/A Signing and Marking Plans
N/A Erosion, Sedimentation and Pollution Plan
N/A Traffic Signal Plans
N/A Staging Plans
N/A Staging Cross Sections
N/A Lighting Plans
N/A Utility (Existing and Proposed Relocations)
N/A Electrical, Gas, Water, and Sewer Plans (if included as a contract item)
N/A Restoration/Mitigation Plans
N/A Sediment Basin Construction Details
N/A Post Construction Stormwater BMP Construction Details and Grading Sheets
Additionally, the following information shall be submitted along with the FFPR Request:
N/A All Project Specific Special Provisions
N/A Copy of email to State Construction Office requesting the approval of SP 108.08 and SP 150.6
N/A A+B Evaluation Tool
N/A Bridge Design Special Provision Checklist
N/A Earthwork Calculations Summary (mainline, side streets, and staging)
Form Word: 2440-1b- Final Field Plan Review Inspection Checklist
Date Last Reviewed: 3/15/2021
Page 1 of 3
GDOT Publications
Policies & Procedures
Form Word:
2440-1b - Final Field Plan Review Inspection Checklist
Section:Plan Review
Reports To: Chief Engineer
Office/Department: Engineering Services
Contact: 404-631-1000
FINAL FIELD PLAN REVIEW INSPECTION REQUEST CHECKLIST
The following Checklist shall be completed by the Design Phase Leader and submitted when a Final Field Plan Review Inspection is
requested. All necessary items are required in order to schedule a Final Field Plan Review Inspection. Failure to do so will delay the
FFPR. Note: The Project Review Engineer may grant exceptions to these requirements.
The request shall include:
Transmittal letter including description of project
Printout of the Detailed Cost Estimate Report from GDOT 411
Environmental “Green Sheet” (Signed by the Project Manager)
Written certification stating that the current design for the proposed project is consistent with the approved RTP/TIP/STIP or that
the design or concept has not changed since the letter issued by the Office of Planning at the PFPR Stage. For projects in the non-
attainment areas the certification should come from the State Transportation Planning Administrator. For other projects, including
projects exempt from for air quality analysis, written certification comes from the Design Phase Leader/Engineer of Record.
The completed plans (two (2) 11x17 sets) shall include all plans that will be part of the contract. Examples are:
Roadway Plans
N/A Approved Bridge Plans (with approval letter/email from the Office of Bridge Design)
N/A Approved Special Design Wall Plans (with approval letter/email from the Office of Bridge Design)
N/A Retaining Wall Plans
N/A Noise Wall Plans and Details
N/A Signing and Marking Plans
N/A Erosion, Sedimentation and Pollution Plan
N/A Traffic Signal Plans
N/A Staging Plans
N/A Staging Cross Sections
N/A Lighting Plans
N/A Utility (Existing and Proposed Relocations)
N/A Electrical, Gas, Water, and Sewer Plans (if included as a contract item)
N/A Restoration/Mitigation Plans
N/A Sediment Basin Construction Details
N/A Post Construction Stormwater BMP Construction Details and Grading Sheets
Additionally, the following information shall be submitted along with the FFPR Request:
N/A All Project Specific Special Provisions
N/A Copy of email to State Construction Office requesting the approval of SP 108.08 and SP 150.6
N/A A+B Evaluation Tool
N/A Bridge Design Special Provision Checklist
N/A Earthwork Calculations Summary (mainline, side streets, and staging)
Form Word: 2440-1b- Final Field Plan Review Inspection Checklist
Date Last Reviewed: 3/15/2021
Page 1 of 3
(N/A) Approved Pavement Design: Minor Pavement Design
Pavement Evaluation Summary
Pavement Design Package
N/A Approved Soil Survey Summary Report
N/A Approved Bridge Foundation Investigation Report
N/A Approved Wall Foundation Investigation Report
N/A Transportation Management Plan
N/A Copy of approved Design Exceptions/Design Variances
Q/A Certification (GDOT Plans - QA Checklist, Consultant Plans - QC/QA Certification Letter)
I certify that all of the requested items have been submitted along with this Request for a Final Field Plan Review
Inspection.
GDOT Project Manager
Office
Phone
Number
Design Phase Leader
Company/Office
Phone Number
Project Number
County
P.I. Number
Date Submitted
Form Word: 2440-1b- Final Field Plan Review Inspection Checklist
Date Last Reviewed: 3/15/2021
Page 2 of 3
References:
History:
A+B Evaluation Tool added: 03/15/21;
copied to GDOT Publications v.02: 03/15/12
Reviewed: 1/28/2021
Reviewed: 3/15/2021
http://teams.dot.ga.gov/info/pap/publicationauthoring
Form Word: 2440-1b- Final Field Plan Review Inspection Checklist
Date Last Reviewed: 3/15/2021
Page 3 of 3
Page of 3