Form 700-011-36 "Low-Bid Design-Build Qualification Validation" - Florida

What Is Form 700-011-36?

This is a legal form that was released by the Florida Department of Transportation - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on June 1, 2020;
  • The latest edition provided by the Florida Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form 700-011-36 by clicking the link below or browse more documents and templates provided by the Florida Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form 700-011-36 "Low-Bid Design-Build Qualification Validation" - Florida

Download PDF

Fill PDF online

Rate (4.5 / 5) 76 votes
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-011-36
CONSTRUCTION
LOW-BID DESIGN-BUILD QUALIFICATION VALIDATION
6/20
Page 1 of 2
Contract Number: ______
Design Build Contact Person: _______________________
Phone: ___________
Contact email: _____________________
The deadline for obtaining bid packages shall be 24 hours prior to scheduled letting date and time. In order to receive bid documents, the Design
Build firm must complete the table below for all qualifying team members at least 24 hours in advance of the scheduled letting. The form shall be
submitted to the appropriate district, who will confirm qualifications.
d1.designbuild@dot.state.fl.us
d3.designbuild@dot.state.fl.us
d5.designbuild@dot.state.fl.us
d7.designbuild@dot.state.fl.us
co.designbuild@dot.state.fl.us
d2.designbuild@dot.state.fl.us
d4.designbuild@dot.state.fl.us
d6.designbuild@dot.state.fl.us
tp.designbuild@dot.stat.fl.us
Prequalification of Contractor:
Lead Contractor Firm Name
JV? (Y or N)
Advertised Work Classification
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-011-36
CONSTRUCTION
LOW-BID DESIGN-BUILD QUALIFICATION VALIDATION
6/20
Page 1 of 2
Contract Number: ______
Design Build Contact Person: _______________________
Phone: ___________
Contact email: _____________________
The deadline for obtaining bid packages shall be 24 hours prior to scheduled letting date and time. In order to receive bid documents, the Design
Build firm must complete the table below for all qualifying team members at least 24 hours in advance of the scheduled letting. The form shall be
submitted to the appropriate district, who will confirm qualifications.
d1.designbuild@dot.state.fl.us
d3.designbuild@dot.state.fl.us
d5.designbuild@dot.state.fl.us
d7.designbuild@dot.state.fl.us
co.designbuild@dot.state.fl.us
d2.designbuild@dot.state.fl.us
d4.designbuild@dot.state.fl.us
d6.designbuild@dot.state.fl.us
tp.designbuild@dot.stat.fl.us
Prequalification of Contractor:
Lead Contractor Firm Name
JV? (Y or N)
Advertised Work Classification
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATIO
700-011-36
CONSTRUCTION
LOW-BID DESIGN-BUILD QUALIFICATION VALIDATION
6/20
Page 2 of 2
Continued
Prequalification of Lead Consultant and any proposed Subconsultants by advertised type(s) of work:
Project Advertised Work Types
Firm Name
Lead Consultant
Sub Consultants
Page of 2