Form 700-010-21 "Low Bid Design-Build Technical Proposal" - Florida

What Is Form 700-010-21?

This is a legal form that was released by the Florida Department of Transportation - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on April 1, 2018;
  • The latest edition provided by the Florida Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form 700-010-21 by clicking the link below or browse more documents and templates provided by the Florida Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form 700-010-21 "Low Bid Design-Build Technical Proposal" - Florida

Download PDF

Fill PDF online

Rate (4.6 / 5) 62 votes
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-010-21
CONSTRUCTION
LOW BID DESIGN-BUILD TECHNICAL PROPOSAL
04/18
Page 1
Advertisement No.:
DOT FM Number:
Project Name:
Design-Build Firm Name:
Street Address:
City:
State:
Zip:
Proposed responsible office location for firm:
Contact person:
Phone:
Contact email:
Firms: Please be aware that all font (including in graphics, tables, and captions on photos) must be standard Times New
Roman, 10 point, single line spacing with no modification of font or spacing allowed. Paper size: 8 ½ X 11, single-sided,
maximum of 2 pages. One half inch clear margin on all sides must be maintained on all pages. Character styling such as use of
color, bold, and italics is allowed. It is the Firm’s responsibility, due to font and format restrictions within this Form, to work within
the constraints of the form and its format. After pasting your proposal into this Form, highlight all text and ensure the font size of
Times New Roman, 10 point was retained. Recreation of the Form in another software application to modify the Form format is not
permitted. This Form works best when saved with a .docx extension. The page layout may be modified to add columns, tables,
graphics, and photos.
All graphics and photos must be created in a clean, blank word document and the “text wrapping square”
option applied before cutting and pasting into this Form.
Use of a table is recommended for text boxes. Once your content is
inserted, delete any additional blank pages that are generated by pressing your delete key after the last word in the proposal.
*Please retain the source document as it may be requested at a later date in the procurement, to verify adherence with aforementioned
restrictions.
Note:
Provide the prequalification held by the Lead Contractor, the Lead Consultant and any proposed subconsultants on page 2 and 3 of this
form.
Use pages 4 and 5 of this form to provide the following information or information as amended by the Request for Proposal.
Proposed approach and understanding of the project.
Proposed key personnel and their proposed roles (do not include resumes).
Responsible Office
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-010-21
CONSTRUCTION
LOW BID DESIGN-BUILD TECHNICAL PROPOSAL
04/18
Page 1
Advertisement No.:
DOT FM Number:
Project Name:
Design-Build Firm Name:
Street Address:
City:
State:
Zip:
Proposed responsible office location for firm:
Contact person:
Phone:
Contact email:
Firms: Please be aware that all font (including in graphics, tables, and captions on photos) must be standard Times New
Roman, 10 point, single line spacing with no modification of font or spacing allowed. Paper size: 8 ½ X 11, single-sided,
maximum of 2 pages. One half inch clear margin on all sides must be maintained on all pages. Character styling such as use of
color, bold, and italics is allowed. It is the Firm’s responsibility, due to font and format restrictions within this Form, to work within
the constraints of the form and its format. After pasting your proposal into this Form, highlight all text and ensure the font size of
Times New Roman, 10 point was retained. Recreation of the Form in another software application to modify the Form format is not
permitted. This Form works best when saved with a .docx extension. The page layout may be modified to add columns, tables,
graphics, and photos.
All graphics and photos must be created in a clean, blank word document and the “text wrapping square”
option applied before cutting and pasting into this Form.
Use of a table is recommended for text boxes. Once your content is
inserted, delete any additional blank pages that are generated by pressing your delete key after the last word in the proposal.
*Please retain the source document as it may be requested at a later date in the procurement, to verify adherence with aforementioned
restrictions.
Note:
Provide the prequalification held by the Lead Contractor, the Lead Consultant and any proposed subconsultants on page 2 and 3 of this
form.
Use pages 4 and 5 of this form to provide the following information or information as amended by the Request for Proposal.
Proposed approach and understanding of the project.
Proposed key personnel and their proposed roles (do not include resumes).
Responsible Office
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-010-21
CONSTRUCTION
LOW BID DESIGN-BUILD TECHNICAL PROPOSAL
04/18
Page 2
The Design-Build firm must provide qualification information as part of the Technical Proposal, even if previously provided through the Low-Bid Design-Build
Qualification Validation Form.
Prequalification of Contractor:
Lead Contractor Firm Name
JV? (Y or N)
Advertised Work Classification
Prequalification of Lead Consultant and any proposed Subconsultants by advertised type(s) of work:
Project Advertised Work Types
Firm Name
Lead Consultant
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-010-21
CONSTRUCTION
LOW BID DESIGN-BUILD TECHNICAL PROPOSAL
04/18
Page 3
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-010-21
CONSTRUCTION
LOW BID DESIGN-BUILD TECHNICAL PROPOSAL
04/18
Page 4
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
700-010-21
CONSTRUCTION
LOW BID DESIGN-BUILD TECHNICAL PROPOSAL
04/18
Page 5