Form TR8 "Technical Report Statement of Responsibility for Energy Code Progress Inspections" - New York City

What Is Form TR8?

This is a legal form that was released by the New York City Department of Buildings - a government authority operating within New York City. Check the official instructions before completing and submitting the form.

Form Details:

  • Released on May 1, 2020;
  • The latest edition provided by the New York City Department of Buildings;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form TR8 by clicking the link below or browse more documents and templates provided by the New York City Department of Buildings.

ADVERTISEMENT
ADVERTISEMENT

Download Form TR8 "Technical Report Statement of Responsibility for Energy Code Progress Inspections" - New York City

Download PDF

Fill PDF online

Rate (4.5 / 5) 71 votes
Page background image
TR8: Technical Report
Statement of Responsibility for
Orient and affix BIS
Energy Code Progress Inspections
job number label here
This form must be typewritten
1
Location Information
(required for all applications)
House No(s)
Street Name
BIN No(s)
Work on Floor(s)
2
Applicant Information
(required for all applications)
Choose all that apply:
Design Applicant 3A, 4
Progress Inspections Applicant 3B-D, 5-6
Last Name
First Name
Middle Initial
Business Name
Business Phone
Business Address
Email Address
City
State
Zip
Mobile Telephone
License Type
(choose one):
P.E.
R.A.
License Number
3
Energy Code Progress Inspection
(required for applications where Energy Code Compliance Progress Inspection is marked ‘Yes’ on TR1)
3B
3C
3D
3A
Identification of Requirement
Identification of
Certificate of Complete
Withdraw
Responsibilities
Inspections/Tests
Responsibilities
Table Reference in 1RCNY
Progress Inspections
Initial & Date
Initial & Date
Initial & Date
Y
N
§5000-01(h) (1 )and (2)
Protection of exposed foundation insulation
(IA1), (IIA1)
Insulation placement and R-values
(IA2), (IIA2)
Fenestration and door U-factor and product ratings
(IA3), (IIA3)
Fenestration air leakage
(IA4), (IIA4)
Fenestration areas
(IA5), (IIA5)
Air barrier − visual inspection
(IA6), (IIA6)
(IA7), (IIA7)
Air barrier − testing
Air barrier continuity plan testing/inspection
(IIA8)
Vestibules
(IIA9)
Fireplaces
(IB1), (IIB1)
Ventilation and air distribution system
(IB2)
Shutoff dampers
(IIB2)
HVAC-R and service water heating equipment
(IB3), (IIB3)
HVAC-R and service water heating system controls
(IB4), (IIB4)
HVAC-R and service water piping design and insulation
(IB5), (IIB5)
Duct leakage testing, insulation and design
(IB6), (IIB6)
Metering
(IC1), (IIC1)
Lighting in dwelling units
(IIC2)
Interior lighting power
(IC2), (IIC3)
Exterior lighting power
(IIC4)
Lighting controls
(IIC5)
Electrical motors and elevators
(IIC6)
Maintenance information
(ID1), (IID1)
Permanent certificate
(ID2)
Electric vehicle service equipment requirements
(ID3)
* For column 3C, indicate date when the actual final inspection was performed.
Rev. 5/20
TR8: Technical Report
Statement of Responsibility for
Orient and affix BIS
Energy Code Progress Inspections
job number label here
This form must be typewritten
1
Location Information
(required for all applications)
House No(s)
Street Name
BIN No(s)
Work on Floor(s)
2
Applicant Information
(required for all applications)
Choose all that apply:
Design Applicant 3A, 4
Progress Inspections Applicant 3B-D, 5-6
Last Name
First Name
Middle Initial
Business Name
Business Phone
Business Address
Email Address
City
State
Zip
Mobile Telephone
License Type
(choose one):
P.E.
R.A.
License Number
3
Energy Code Progress Inspection
(required for applications where Energy Code Compliance Progress Inspection is marked ‘Yes’ on TR1)
3B
3C
3D
3A
Identification of Requirement
Identification of
Certificate of Complete
Withdraw
Responsibilities
Inspections/Tests
Responsibilities
Table Reference in 1RCNY
Progress Inspections
Initial & Date
Initial & Date
Initial & Date
Y
N
§5000-01(h) (1 )and (2)
Protection of exposed foundation insulation
(IA1), (IIA1)
Insulation placement and R-values
(IA2), (IIA2)
Fenestration and door U-factor and product ratings
(IA3), (IIA3)
Fenestration air leakage
(IA4), (IIA4)
Fenestration areas
(IA5), (IIA5)
Air barrier − visual inspection
(IA6), (IIA6)
(IA7), (IIA7)
Air barrier − testing
Air barrier continuity plan testing/inspection
(IIA8)
Vestibules
(IIA9)
Fireplaces
(IB1), (IIB1)
Ventilation and air distribution system
(IB2)
Shutoff dampers
(IIB2)
HVAC-R and service water heating equipment
(IB3), (IIB3)
HVAC-R and service water heating system controls
(IB4), (IIB4)
HVAC-R and service water piping design and insulation
(IB5), (IIB5)
Duct leakage testing, insulation and design
(IB6), (IIB6)
Metering
(IC1), (IIC1)
Lighting in dwelling units
(IIC2)
Interior lighting power
(IC2), (IIC3)
Exterior lighting power
(IIC4)
Lighting controls
(IIC5)
Electrical motors and elevators
(IIC6)
Maintenance information
(ID1), (IID1)
Permanent certificate
(ID2)
Electric vehicle service equipment requirements
(ID3)
* For column 3C, indicate date when the actual final inspection was performed.
Rev. 5/20
TR8
PAGE 2
4
Design Applicant’s Statements and Signatures
(P.E./R.A. responsible for plans must sign and seal)
Name (please print)
I have identified herein all of the progress inspections, and commissioning
required for compliance and determined whether commissioning is
required.
Signature
Date
Commissioning is required for applications where C408 or ASHRAE 90.1
Section 6.7.2.3 requires commissioning. Check one:
This project requires commissioning and a preliminary commissioning
report certification will be provided prior to sign-off.
P.E./R.A. Seal (apply seal, then sign and date over seal)
This project does not require commissioning.
5
Inspection Applicant’s Identification of Responsibilities
Check all that apply below:
For the Progress Inspections indicated above in Section 3 and identified by me for responsibility, I certify that I am the
principal/director of the progress inspection agency accepting responsibility for conducting the inspections as identified in
section 3B. I further certify that I have read the applicable sections of the New York City Construction Codes and 1 RCNY
5000-01 in connection with progress inspections as well as 1 RCNY 101-07, which specifies the qualifications required for
each progress inspector, and that this agency meets those qualifications for each and every progress inspection for which
I/we take responsibility. I agree that both I and the agency will comply with all provisions of the New York City Construction
Codes and the Rules. I am aware of the additional sanctions imposed on false filings by §28-211.1.2 of the Administrative
Code.
Change of Applicant: I am a newly designated individual responsible for the items specified herein and I hereby state that:
None of the inspections/tests indicated herein have been performed to date by the previously designated individual.
Some of the inspections/tests indicated herein have been performed by the previously designated individual,
as indicated in the attached report.
I am aware of the additional sanctions imposed on false filings by §28-211.1.2 of the Administrative Code.
Name (please print)
Signature
Date
P.E. / R.A. Seal (apply seal, then sign and date over seal)
6
Inspection Applicant’s Certification of Completion
I have completed the items specified herein and certify the following (check one only):
All work performed substantially conforms to approved construction documents and has been performed in accordance
with applicable provisions of the New York City Energy Conservation Code and other designated rules and regulations.
All work performed substantially conforms to approved construction documents and has been performed in accordance
with applicable provisions of the New York City Energy Conservation Code and other designated rules and regulations,
except as indicated in the attached report.
I am aware of the additional sanctions imposed on false filings by §28-211.1.2 of the Administrative Code.
Withdrawal of Applicant:
I am withdrawing responsibility for the
items of progress
inspections and/or tests indicated herein
and herewith submit the results or status of the work performed to date.
Name (please print)
Signature
Date
P.E. / R.A. Seal (apply seal, then sign and date over seal)
Rev. 5/20
Page of 2