WET PIPE SPRINKLER SYSTEM AND FIRE DETECTION SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT
2. LOCATION
3. JOB NUMBER
4. EQUIPMENT
5. SYSTEM DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - EQUIPMENT DATA
9. FIRE DETECTION CONTROL PANEL
10. MODEL NO
11. SERIAL NO
12. LOCATION
AND SYSTEM MANUFACTURER
13. FIRE RISER
14. LOCATION
SECTION C - VISUAL AND MECHANICAL INSPECTION
15.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
EXTERIOR OF EQUIPMENT
EQUIPMENT IDENTIFICATION
COMPLETENESS OF ASSEMBLY
FREEZE PROTECT, VENTS AND DRAINS
CONTROL SYSTEM DISPLAY
LABELING AND TAGGING
ELECTRICAL/MECHANICAL INTERLOCKS
WALLS AND OBJECTS NEAR SPRINKLER HEADS
SAFETY INTERLOCKS
MATERIALS BEING STORED
INSTRUMENTS AND ALARMS
OCCUPANCY
PROPER GROUNDING
PAD LOCKS
PROPER INSULATION
ACCESS NEAR RISER, PANEL AND FDC
LOCATION OF SPRINKLER HEADS
ANCHORAGE AND PIPE HANGERS
CONDITION OF SPRINKLER HEADS
COMPARISON TO DRAWINGS
SECTION D - CALIBRATION AND SET POINT
16.
NOTES
DESCRIPTION
GAUGES
BATTERY AND CHARGER
SECTION E - SYSTEM TESTS
17.
OPERATING MODES
TEMPERATURES PRESSURES
FLOWS
LEVELS
NOTES
HYDROSTATIC TEST
ALARM/STROBES
FLOW AND TAMPER SWITCHES
PULL STATIONS
FLOW TEST
SYSTEM TEST
18. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
DA FORM 7483-R, DEC 2002
APD LC v1.00
WET PIPE SPRINKLER SYSTEM AND FIRE DETECTION SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT
2. LOCATION
3. JOB NUMBER
4. EQUIPMENT
5. SYSTEM DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - EQUIPMENT DATA
9. FIRE DETECTION CONTROL PANEL
10. MODEL NO
11. SERIAL NO
12. LOCATION
AND SYSTEM MANUFACTURER
13. FIRE RISER
14. LOCATION
SECTION C - VISUAL AND MECHANICAL INSPECTION
15.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
EXTERIOR OF EQUIPMENT
EQUIPMENT IDENTIFICATION
COMPLETENESS OF ASSEMBLY
FREEZE PROTECT, VENTS AND DRAINS
CONTROL SYSTEM DISPLAY
LABELING AND TAGGING
ELECTRICAL/MECHANICAL INTERLOCKS
WALLS AND OBJECTS NEAR SPRINKLER HEADS
SAFETY INTERLOCKS
MATERIALS BEING STORED
INSTRUMENTS AND ALARMS
OCCUPANCY
PROPER GROUNDING
PAD LOCKS
PROPER INSULATION
ACCESS NEAR RISER, PANEL AND FDC
LOCATION OF SPRINKLER HEADS
ANCHORAGE AND PIPE HANGERS
CONDITION OF SPRINKLER HEADS
COMPARISON TO DRAWINGS
SECTION D - CALIBRATION AND SET POINT
16.
NOTES
DESCRIPTION
GAUGES
BATTERY AND CHARGER
SECTION E - SYSTEM TESTS
17.
OPERATING MODES
TEMPERATURES PRESSURES
FLOWS
LEVELS
NOTES
HYDROSTATIC TEST
ALARM/STROBES
FLOW AND TAMPER SWITCHES
PULL STATIONS
FLOW TEST
SYSTEM TEST
18. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE