Form MURK4 "Daily Work Report - Hot Mix Asphalt" - New York

What Is Form MURK4?

This is a legal form that was released by the New York State Department of Transportation - a government authority operating within New York. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on June 1, 2008;
  • The latest edition provided by the New York State Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form MURK4 by clicking the link below or browse more documents and templates provided by the New York State Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form MURK4 "Daily Work Report - Hot Mix Asphalt" - New York

Download PDF

Fill PDF online

Rate (4.8 / 5) 52 votes
MURK 4
DAILY WORK REPORT - HOT MIX ASPHALT
Metric
(06/08)
English
Date:
JOB STAMP
Day of Week
S
M
T
W
T
F
S
:
Sheet No.
DWR No.
of
AM
PM
Weather
° C
° C
Temperature
Time/Surf Temp
CONTRACTOR WORK HOURS:
TO
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
DESIGN
APROX
COURSE
WIDTH
LENGTH
AREA
COURSE
LANE
DEPTH
WEIGHT
TOTAL
LOCATION
(m)
(m)
(m ²)
(mm)
(MT)
(MT)
QUANTITY
QUANTITY
QUANTITY
QUANTITY
QUANTITY
COURSE
MIX ID
DISPATCHED
RECEIVED
REJECTED
WASTED
USED
FIRST TICKET NO.
LAST TICKET NO.
NO. OF TICKETS
INTERIM
FINAL
QTY
CEES
CONTRACT PAY
FS
ES
UNITS
LOCATION OF WORK
ENT
CHK
QUANTITY
QUANTITY
CHK
ITEM NO
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature:
Date Prepared:
Engineer-in-Charge
Reviewed by:
Date Reviewed:
Resident Engineer
MURK 1-1 CONTINUATION attached for additional narrative.
MURK 1-2 CONTINUATION attached for additional pay items & quantities.
MURK 4
DAILY WORK REPORT - HOT MIX ASPHALT
Metric
(06/08)
English
Date:
JOB STAMP
Day of Week
S
M
T
W
T
F
S
:
Sheet No.
DWR No.
of
AM
PM
Weather
° C
° C
Temperature
Time/Surf Temp
CONTRACTOR WORK HOURS:
TO
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
DESIGN
APROX
COURSE
WIDTH
LENGTH
AREA
COURSE
LANE
DEPTH
WEIGHT
TOTAL
LOCATION
(m)
(m)
(m ²)
(mm)
(MT)
(MT)
QUANTITY
QUANTITY
QUANTITY
QUANTITY
QUANTITY
COURSE
MIX ID
DISPATCHED
RECEIVED
REJECTED
WASTED
USED
FIRST TICKET NO.
LAST TICKET NO.
NO. OF TICKETS
INTERIM
FINAL
QTY
CEES
CONTRACT PAY
FS
ES
UNITS
LOCATION OF WORK
ENT
CHK
QUANTITY
QUANTITY
CHK
ITEM NO
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature:
Date Prepared:
Engineer-in-Charge
Reviewed by:
Date Reviewed:
Resident Engineer
MURK 1-1 CONTINUATION attached for additional narrative.
MURK 1-2 CONTINUATION attached for additional pay items & quantities.
MURK 4 REVERSE
(06/08)
YIELD CHECKS
COMPACT
ESTIMATED
MEASURED
WEIGHT
WIDTH
HMA
COURSE
DEPTH
LENGTH
LENGTH
LOCATION
(MT)
(m)
FACTOR
(mm)
(m)
(m)
HMA FACTOR = (MAXIMUM THEORETICAL DENSITY x PERCENTAGE COMPACTION)
ESTIMATED LENGTH = (WEIGHT) / (WIDTH x DEPTH x HMA FACTOR)
LABOR
EQUIPMENT
CLASSIFICATION
OP 1
OP 2
OP 3
OP 4
TYPE
ID #
OP 1
OP 2
OP 3
OP 4
FOREPERSON
LABORER
EQUIP. OPERATOR
TRUCK DRIVERS
IRONWORKERS
CARPENTERS
MASONS
OWN./OPERATORS
OP 1:
OP 2:
OP 3:
OP 4:
Print Form
Page of 2