Form MURK3 "Daily Work Report - Portland Cement Concrete Pavement" - New York

What Is Form MURK3?

This is a legal form that was released by the New York State Department of Transportation - a government authority operating within New York. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on June 1, 2008;
  • The latest edition provided by the New York State Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form MURK3 by clicking the link below or browse more documents and templates provided by the New York State Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form MURK3 "Daily Work Report - Portland Cement Concrete Pavement" - New York

Download PDF

Fill PDF online

Rate (4.4 / 5) 73 votes
DAILY WORK REPORT - PORTLAND CEMENT CONCRETE PAVEMENT
Metric
MURK 3
(06/08)
English
Date:
JOB STAMP
Day of Week
S
M
T
W
T
F
S
:
.
DWR No
Sheet No.
of
AM
PM
Weather
° C
° C
Temperature
CONTRACTOR WORK HOURS:
TO
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
LOCATION
LANE
DESIGN
WIDTH
LENGTH
AREA
VOLUME
DEPTH(mm)
(m)
(m)
(m ²)
(m ³)
0.00
0.00
0.00
CLASS
BR 316
QUANTITY
QUANTITY
QUANTITY
QUANTITY
QUANTITY
REPORT NO
DISPATCHED
RECEIVED
REJECTED
WASTED
USED
FIRST TICKET NO.
LAST TICKET NO.
NO. OF TICKETS
INTERIM
FINAL
QTY
CEES
CONTRACT
FS
ES
UNITS
LOCATION OF WORK
ENT
CHK
QUANTITY
QUANTITY
CHK
PAY ITEM NO
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature:
Date Prepared:
Engineer-in-Charge
Reviewed by:
Date Reviewed:
Resident Engineer
MURK 1-1 CONTINUATION attached for additional narrative.
MURK 1-2 CONTINUATION attached for additional pay items & quantities.
DAILY WORK REPORT - PORTLAND CEMENT CONCRETE PAVEMENT
Metric
MURK 3
(06/08)
English
Date:
JOB STAMP
Day of Week
S
M
T
W
T
F
S
:
.
DWR No
Sheet No.
of
AM
PM
Weather
° C
° C
Temperature
CONTRACTOR WORK HOURS:
TO
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
LOCATION
LANE
DESIGN
WIDTH
LENGTH
AREA
VOLUME
DEPTH(mm)
(m)
(m)
(m ²)
(m ³)
0.00
0.00
0.00
CLASS
BR 316
QUANTITY
QUANTITY
QUANTITY
QUANTITY
QUANTITY
REPORT NO
DISPATCHED
RECEIVED
REJECTED
WASTED
USED
FIRST TICKET NO.
LAST TICKET NO.
NO. OF TICKETS
INTERIM
FINAL
QTY
CEES
CONTRACT
FS
ES
UNITS
LOCATION OF WORK
ENT
CHK
QUANTITY
QUANTITY
CHK
PAY ITEM NO
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature:
Date Prepared:
Engineer-in-Charge
Reviewed by:
Date Reviewed:
Resident Engineer
MURK 1-1 CONTINUATION attached for additional narrative.
MURK 1-2 CONTINUATION attached for additional pay items & quantities.
MURK 3 REVERSE (01/07)
CONCRETE SPECIFICATIONS
SLUMP
AIR CONTENT
TEMP (° C)
CLASS
MIN
MAX
MIN
MAX
MIN
MAX
TRUCK AND MIXING INFORMATION
(NOTE TYPE BELOW)
MIXER TYPE:
TRUCK MIX
TRANSIT MIX
CENTRAL MIX
OTHER
TRUCK OR
LOAD
END
START
END
MIXING
END DIS-
SLUMP
AIR
CONC
REMARKS
START
DISCHARGE
TICKET
SIZE
BATCH
MIX TIME
MIX TIME
REVS
CHARGE
(mm)
CONTENT
TEMP
(4)
TIME
NO.
(m ³)
TIME
(1)
(2)
(3)
TIME
(%)
(° C)
NOTES: MAKE ENTRIES FOR (1) Truck Mix only (2) Truck Mix and Central Mix Only (3) Truck Mix and Transit Mix Only (4) Transit Mix Only
LABOR
EQUIPMENT
CLASSIFICATION
OP 1
OP 2
OP 3
OP 4
TYPE
ID #
OP 1
OP 2
OP 3
OP 4
FOREPERSON
LABORER
EQUIP. OPERATOR
TRUCK DRIVERS
IRONWORKERS
CARPENTERS
MASONS
OWN./OPERATORS
OP 1:
OP 2:
OP 3:
OP 4:
Print Form
Page of 2