DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina

DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina

What Is DHEC Form 1932?

This is a legal form that was released by the South Carolina Department of Health and Environmental Control - a government authority operating within South Carolina. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is DHEC Form 1932?A: DHEC Form 1932 is an application for a permit to construct a solid waste management system in South Carolina.

Q: What is a solid waste management system?A: A solid waste management system is a facility or system used for the collection, disposal, and management of solid waste.

Q: Who needs to fill out DHEC Form 1932?A: Anyone who wants to construct a solid waste management system in South Carolina needs to fill out DHEC Form 1932.

Q: What information is needed in DHEC Form 1932?A: DHEC Form 1932 requires detailed information about the proposed solid waste management system, including its location, design plans, and potential environmental impacts.

Q: Are there any fees associated with submitting DHEC Form 1932?A: Yes, there are fees associated with submitting DHEC Form 1932. The specific fees depend on the type and size of the solid waste management system.

Q: What happens after submitting DHEC Form 1932?A: After submitting DHEC Form 1932, the application will be reviewed by the South Carolina Department of Health and Environmental Control (DHEC) to determine if the proposed solid waste management system meets all the regulatory requirements.

Q: How long does it take to get a permit after submitting DHEC Form 1932?A: The time it takes to obtain a permit after submitting DHEC Form 1932 can vary depending on the complexity of the proposed solid waste management system and the completeness of the application. It is best to contact the South Carolina Department of Health and Environmental Control (DHEC) for an estimate of the processing time.

Q: Can I start construction before receiving a permit?A: No, you cannot start construction of a solid waste management system before receiving a permit from the South Carolina Department of Health and Environmental Control (DHEC). Construction without a permit may result in legal penalties.

Q: What should I do if my DHEC Form 1932 application is denied?A: If your DHEC Form 1932 application is denied, you may have the option to appeal the decision. It is recommended to consult with an attorney familiar with environmental regulations to discuss your options.

ADVERTISEMENT

Form Details:

  • Released on April 1, 2021;
  • The latest edition provided by the South Carolina Department of Health and Environmental Control;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of DHEC Form 1932 by clicking the link below or browse more documents and templates provided by the South Carolina Department of Health and Environmental Control.

Download DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina

4.8 of 5 (5 votes)
  • DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina

    1

  • DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina, Page 2

    2

  • DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina, Page 1
  • DHEC Form 1932 Application for Permit to Construct a Solid Waste Management System - South Carolina, Page 2
Prev 1 2 Next
ADVERTISEMENT

Related Documents