Form CDD-0252 "Residential Lot Lines, Building Location, and Required Setbacks Owner Certification" - City of Sacramento, California

What Is Form CDD-0252?

This is a legal form that was released by the Community Development Department - City of Sacramento, California - a government authority operating within California. The form may be used strictly within City of Sacramento. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on January 1, 2020;
  • The latest edition provided by the Community Development Department - City of Sacramento, California;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form CDD-0252 by clicking the link below or browse more documents and templates provided by the Community Development Department - City of Sacramento, California.

ADVERTISEMENT
ADVERTISEMENT

Download Form CDD-0252 "Residential Lot Lines, Building Location, and Required Setbacks Owner Certification" - City of Sacramento, California

Download PDF

Fill PDF online

Rate (4.5 / 5) 18 votes
Page background image
Permit #
Project Address:
Residential Lot Lines, Building Location,
and Required Setbacks
Owner Certification
Release and Indemnity
A property owner proposing construction for which a building permit is issued by the City of
Sacramento is required to verify for the City and the City’s building inspectors the location of the
property lines at the construction site and the applicable required setbacks for the improvement to be
constructed.
The certification and release and indemnity are required when the required building setback is five
feet or less and a survey is not provided. This form must be completed, signed, and submitted to the
City’s building inspector prior to the first foundation inspection.
The Building Official is authorized to require additional construction documents that are
prepared by a registered design professional. This may include evidence of property line
location (including a property survey) whenever the Building Official determines that the
location of the proposed work is in question or is disputed. 2019 CRC, Section R106.
Certification of Lot Lines, Building Location and Required Setback
I, _________________________, hereby declare, acknowledge, and affirm the following:
1. That I am the owner of the real property located at ___________________________,
Sacramento, CA.
2. That I have used reasonable care to verify the location of all property lines, measurements,
and locations at the construction site and that they correspond to the property lines,
measurements, and locations shown on the application and the accompanying drawings.
3. That the construction project is located on the site in full compliance with the approved building
plans and applicable building setbacks under the Sacramento Zoning Code and conditions of
approval, if any.
4. That I have clearly and accurately marked at the construction site all property lines that are five
feet or less from propose construction.
CDD-0252
Revised 1-01-2020
Page 1 of 2
Permit #
Project Address:
Residential Lot Lines, Building Location,
and Required Setbacks
Owner Certification
Release and Indemnity
A property owner proposing construction for which a building permit is issued by the City of
Sacramento is required to verify for the City and the City’s building inspectors the location of the
property lines at the construction site and the applicable required setbacks for the improvement to be
constructed.
The certification and release and indemnity are required when the required building setback is five
feet or less and a survey is not provided. This form must be completed, signed, and submitted to the
City’s building inspector prior to the first foundation inspection.
The Building Official is authorized to require additional construction documents that are
prepared by a registered design professional. This may include evidence of property line
location (including a property survey) whenever the Building Official determines that the
location of the proposed work is in question or is disputed. 2019 CRC, Section R106.
Certification of Lot Lines, Building Location and Required Setback
I, _________________________, hereby declare, acknowledge, and affirm the following:
1. That I am the owner of the real property located at ___________________________,
Sacramento, CA.
2. That I have used reasonable care to verify the location of all property lines, measurements,
and locations at the construction site and that they correspond to the property lines,
measurements, and locations shown on the application and the accompanying drawings.
3. That the construction project is located on the site in full compliance with the approved building
plans and applicable building setbacks under the Sacramento Zoning Code and conditions of
approval, if any.
4. That I have clearly and accurately marked at the construction site all property lines that are five
feet or less from propose construction.
CDD-0252
Revised 1-01-2020
Page 1 of 2
Permit #
Project Address:
Release and Indemnity
I acknowledge and agree that the City’s building inspectors will rely on my
representations regarding the location of all property lines, measurements, and locations at
the construction site, and that I shall be fully and solely responsible for any and all losses,
damages, costs, expenses, judgments, penalties, and liabilities of every type and description
that may arise from the City’s reliance on my representations regarding the location of all
property lines, measurements and locations at the construction site. I waive and release the
City, its officers, employees, elected officials, and agents from any and all claims, damages,
actions, liabilities, causes of action, attorney’s fees, cost, and any other claims, known or
unknown, suspected or unsuspected, hereafter arising out of or relating to City’s reliance on
my representations regarding the location of all property lines, measurements, and locations
at the construction site.
I further agree and promise to indemnify and hold harmless the City of Sacramento,
its officers, employees, elected official, and agents from any and all losses, damages, costs,
expenses, judgments, penalties, and liabilities, of every type and description, including any
fees and costs of City’s staff, staff attorneys, and outside attorneys, reasonably incurred by
City by reason of, or resulting from, directly or indirectly, City’s reliance on my
representations regarding the location of all property lines, measurements, and locations at
the construction site.
Owner:
Signature:
Name (Print):
Title:
Date:
Please note that once this document is submitted to the City of Sacramento, your information may be subject to the Public Records Request Act.
However, the City will not sell your data or information for any purposes.
CDD-0252
Revised 1-01-2020
Page 2 of 2
Page of 2