Form DES-EA-099 "Contract Change Order Proposal (Cop) - Facility Professional Services (Fps)" - Washington

What Is Form DES-EA-099?

This is a legal form that was released by the Washington State Department of Enterprise Services - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on January 21, 2021;
  • The latest edition provided by the Washington State Department of Enterprise Services;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form DES-EA-099 by clicking the link below or browse more documents and templates provided by the Washington State Department of Enterprise Services.

ADVERTISEMENT
ADVERTISEMENT

Download Form DES-EA-099 "Contract Change Order Proposal (Cop) - Facility Professional Services (Fps)" - Washington

Download PDF

Fill PDF online

Rate (4.5 / 5) 10 votes
CONTRACT
FACILITY PROFESSIONAL SERVICES (FPS)
AGENCY
NO.
CONTRACT CHANGE ORDER
COP No.
PROPOSAL (COP)
PROJECT TITLE
TO:
(CONTRACTOR)
PROPOSAL REQUEST DATE:
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to:
DESIGN OMMISSIONS
AGENCY
LATENT CONDITIONS
DESIGN ERRORS
REASON FOR CHANGE:
CODE REQUIREMENTS
ALTERNATIVE PUBLIC WORKS CONSTRUCTION PHASE (W)
VALUE ENGINEERING
EXPLANATION:
DATE PROPOSAL REQUIRED:
CHANGE ORIGINATED BY:
(14 days from Request Date, unless other date agreed to)
PROPOSAL REQUESTED BY:
PM (FPS)
TO:
(A/E)
TO:
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
}
NO CHANGE
$
OF
INCREASE
(WASHINGTON STATE SALES TAX NOT INCLUDED)
DECREASE
In accordance with the General Conditions, Cost Estimate Detail Sheet(s) are attached hereto.
CONTRACT TIME:
}
NO CHANGE
INCREASE
OF
CALENDAR DAYS
DECREASE
The foregoing amount covers everything required in connection with the change. All other provisions of the contract
remain in full force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the Department of Enterprise Services.
BY
CONTRACTOR
SIGNATURE
DATE
TO: The Department of Enterprise Services' Authorizing Signator
We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance.
FPS COST VERIFICATION
A/E
DATE
DATE
FPS PROJECT MANAGER
AGENCY
DATE
DATE
FORM DES-EA-099 (Revised 01/21/2021)
CONTRACT
FACILITY PROFESSIONAL SERVICES (FPS)
AGENCY
NO.
CONTRACT CHANGE ORDER
COP No.
PROPOSAL (COP)
PROJECT TITLE
TO:
(CONTRACTOR)
PROPOSAL REQUEST DATE:
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to:
DESIGN OMMISSIONS
AGENCY
LATENT CONDITIONS
DESIGN ERRORS
REASON FOR CHANGE:
CODE REQUIREMENTS
ALTERNATIVE PUBLIC WORKS CONSTRUCTION PHASE (W)
VALUE ENGINEERING
EXPLANATION:
DATE PROPOSAL REQUIRED:
CHANGE ORIGINATED BY:
(14 days from Request Date, unless other date agreed to)
PROPOSAL REQUESTED BY:
PM (FPS)
TO:
(A/E)
TO:
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
}
NO CHANGE
$
OF
INCREASE
(WASHINGTON STATE SALES TAX NOT INCLUDED)
DECREASE
In accordance with the General Conditions, Cost Estimate Detail Sheet(s) are attached hereto.
CONTRACT TIME:
}
NO CHANGE
INCREASE
OF
CALENDAR DAYS
DECREASE
The foregoing amount covers everything required in connection with the change. All other provisions of the contract
remain in full force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the Department of Enterprise Services.
BY
CONTRACTOR
SIGNATURE
DATE
TO: The Department of Enterprise Services' Authorizing Signator
We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance.
FPS COST VERIFICATION
A/E
DATE
DATE
FPS PROJECT MANAGER
AGENCY
DATE
DATE
FORM DES-EA-099 (Revised 01/21/2021)