DOT Form 140-005 Change Order - Washington

DOT Form 140-005 Change Order - Washington

What Is DOT Form 140-005?

This is a legal form that was released by the Washington State Department of Transportation - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form 140-005 Change Order?
A: Form 140-005 Change Order is a document used by the Washington Department of Transportation (DOT) to request changes to an existing contract.

Q: Who uses Form 140-005 Change Order?
A: Form 140-005 Change Order is used by the Washington Department of Transportation (DOT) and contractors working on DOT projects.

Q: What is the purpose of Form 140-005 Change Order?
A: The purpose of Form 140-005 Change Order is to document and authorize changes to an existing contract, such as modifications to the scope of work, schedule, or cost.

Q: When should Form 140-005 Change Order be used?
A: Form 140-005 Change Order should be used when there is a need to make changes to an existing contract for a Washington DOT project.

Q: Is there a fee to file Form 140-005 Change Order?
A: There is no specific fee associated with filing Form 140-005 Change Order, but any changes made to the contract may result in additional costs.

Q: Are there any specific requirements for completing Form 140-005 Change Order?
A: Yes, Form 140-005 Change Order must be completed accurately and include all necessary information, such as the reasons for the change, proposed modifications, and any cost implications.

ADVERTISEMENT

Form Details:

  • Released on April 1, 2015;
  • The latest edition provided by the Washington State Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of DOT Form 140-005 by clicking the link below or browse more documents and templates provided by the Washington State Department of Transportation.

Download DOT Form 140-005 Change Order - Washington

4.8 of 5 (9 votes)
  • DOT Form 140-005 Change Order - Washington

    1

  • DOT Form 140-005 Change Order - Washington, Page 2

    2

  • DOT Form 140-005 Change Order - Washington, Page 1
  • DOT Form 140-005 Change Order - Washington, Page 2
Prev 1 2 Next
ADVERTISEMENT