DA Form 7475-R "Uninterruptible Power Supply (Ups) System Inspection Checklist"

What Is DA Form 7475-R?

This is a military form that was released by the U.S. Department of the Army (DA) on August 1, 2002. The form, often mistakenly referred to as the DD Form 7475-R, is a military form used by and within the U.S. Army. As of today, no separate instructions for the form are provided by the DA.

Form Details:

  • A 1-page document available for download in PDF;
  • The latest version available from the Army Publishing Directorate;
  • Editable, free, and easy to use;

Download an up-to-date fillable DA Form 7475-R down below in PDF format or browse hundreds of other DA Forms stored in our online database.

ADVERTISEMENT
ADVERTISEMENT

Download DA Form 7475-R "Uninterruptible Power Supply (Ups) System Inspection Checklist"

701 times
Rate (4.4 / 5) 159 votes
UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM INSPECTION CHECKLIST
.
For use of this form see TM 5-694; the proponent agency is COE
SECTION A - CUSTOMER DATA
1. PLANT/BUILDING
2. LOCATION
3. JOB NUMBER
4. EQUIPMENT
5. CIRCUIT DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - VISUAL AND ELECTRICAL/MECHANICAL INSPECTION
9.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
COMPONENT INSPECTION/TESTING
ENERGIZE AND TEST SYSTEM
INSTALLATION INSPECTION/TESTING
UTILITY TRIP TEST
LOADED TRANSFER TEST (NORMAL,
WIRING VISUAL VERIFICATION
EMERGENCY & RETURN)
GENERATOR CONTROL FUNCTIONS
TIGHTNESS OF BOLTED CONNECTIONS
LOADING UPS TEST
BATTERY DISCHARGE TEST
DISCONNECT RECTIFIERS & INVERTERS
TEST ALL UPS DIAGNOSTIC FAULT
SEPARATELY. DOES SYSTEM OPERATE
INDICATORS
CORRECTLY?
SECTION D - ELECTRICAL TESTS
A-N
B-N
C-N
A-B
B-C
C-A
A
B
C
N
G
10.
UPS INPUT
A-N
B-N
C-N
A-B
B-C
C-A
A
B
N
G
C
UPS OUTPUT
A-N
B-N
C-N
A-B
B-C
C-A
A
B
C
N
G
UPS SWITCHBOARD HARMONIC (THD)
11. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
**NOTE VALUE AND PHASING
DA FORM 7475-R, AUG 2002
APD LC v1.00
UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM INSPECTION CHECKLIST
.
For use of this form see TM 5-694; the proponent agency is COE
SECTION A - CUSTOMER DATA
1. PLANT/BUILDING
2. LOCATION
3. JOB NUMBER
4. EQUIPMENT
5. CIRCUIT DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - VISUAL AND ELECTRICAL/MECHANICAL INSPECTION
9.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
COMPONENT INSPECTION/TESTING
ENERGIZE AND TEST SYSTEM
INSTALLATION INSPECTION/TESTING
UTILITY TRIP TEST
LOADED TRANSFER TEST (NORMAL,
WIRING VISUAL VERIFICATION
EMERGENCY & RETURN)
GENERATOR CONTROL FUNCTIONS
TIGHTNESS OF BOLTED CONNECTIONS
LOADING UPS TEST
BATTERY DISCHARGE TEST
DISCONNECT RECTIFIERS & INVERTERS
TEST ALL UPS DIAGNOSTIC FAULT
SEPARATELY. DOES SYSTEM OPERATE
INDICATORS
CORRECTLY?
SECTION D - ELECTRICAL TESTS
A-N
B-N
C-N
A-B
B-C
C-A
A
B
C
N
G
10.
UPS INPUT
A-N
B-N
C-N
A-B
B-C
C-A
A
B
N
G
C
UPS OUTPUT
A-N
B-N
C-N
A-B
B-C
C-A
A
B
C
N
G
UPS SWITCHBOARD HARMONIC (THD)
11. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
**NOTE VALUE AND PHASING
DA FORM 7475-R, AUG 2002
APD LC v1.00