LUBE OIL SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT
2. LOCATION
3. JOB NUMBER
4. EQUIPMENT
5. SYSTEM DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - EQUIPMENT DATA
9. PUMP MANUFACTURER
10. MODEL NO
11. SERIAL NO
12. FLOW RATING GPM
13. TYPE
14. HP @ RPM
15. PRESSURE RATING PSIG
16. HEATER MANUFACTURER
17. MODEL NO
18. SERIAL NO
19. FLOW RATING GPM
20. COOLER MANUFACTURER
21. MODEL NO
22. SERIAL NO
23. FLOW RATING GPM
24. CENTRIFUGE MANUFACTURER
25. MODEL NO
26. SERIAL NO
27. FLOW RATING GPM
SECTION C - VISUAL AND MECHANICAL INSPECTION
28.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
EXTERIOR OF EQUIPMENT
EQUIPMENT IDENTIFICATION
COMPLETENESS OF ASSEMBLY
BRACING
EQUIPMENT ROTATION
LABELING AND TAGGING
ELECTRICAL/MECHANICAL INTERLOCKS
SAFETY INTERLOCKS
INSTRUMENTS
WORKING SPACE
PROPER GROUNDING
ANCHORAGE
PROPER INSULATION
LEAKS
TIGHTNESS OF BOLTED CONNECTIONS
COMPARISON TO DRAWINGS
PROPER LUBRICATION
CONTROL SYSTEM
SECTION D - CALIBRATION AND SET POINT
29.
NOTES
DESCRIPTION
SENSORS
CONTROLLERS
ACTUATORS
SECTION E - LUBE SYSTEM TESTS
30.
OPERATING MODES
TEMPERATURES PRESSURES
FLOWS
LEVELS
NOTES
PUMP
HEATER
COOLER
ENGINE
HYDROSTATIC TEST
SYSTEM TEST
31. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
DA FORM 7481-R, DEC 2002
APD LC v1.00
LUBE OIL SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT
2. LOCATION
3. JOB NUMBER
4. EQUIPMENT
5. SYSTEM DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - EQUIPMENT DATA
9. PUMP MANUFACTURER
10. MODEL NO
11. SERIAL NO
12. FLOW RATING GPM
13. TYPE
14. HP @ RPM
15. PRESSURE RATING PSIG
16. HEATER MANUFACTURER
17. MODEL NO
18. SERIAL NO
19. FLOW RATING GPM
20. COOLER MANUFACTURER
21. MODEL NO
22. SERIAL NO
23. FLOW RATING GPM
24. CENTRIFUGE MANUFACTURER
25. MODEL NO
26. SERIAL NO
27. FLOW RATING GPM
SECTION C - VISUAL AND MECHANICAL INSPECTION
28.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
EXTERIOR OF EQUIPMENT
EQUIPMENT IDENTIFICATION
COMPLETENESS OF ASSEMBLY
BRACING
EQUIPMENT ROTATION
LABELING AND TAGGING
ELECTRICAL/MECHANICAL INTERLOCKS
SAFETY INTERLOCKS
INSTRUMENTS
WORKING SPACE
PROPER GROUNDING
ANCHORAGE
PROPER INSULATION
LEAKS
TIGHTNESS OF BOLTED CONNECTIONS
COMPARISON TO DRAWINGS
PROPER LUBRICATION
CONTROL SYSTEM
SECTION D - CALIBRATION AND SET POINT
29.
NOTES
DESCRIPTION
SENSORS
CONTROLLERS
ACTUATORS
SECTION E - LUBE SYSTEM TESTS
30.
OPERATING MODES
TEMPERATURES PRESSURES
FLOWS
LEVELS
NOTES
PUMP
HEATER
COOLER
ENGINE
HYDROSTATIC TEST
SYSTEM TEST
31. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE