SEWAGE TREATMENT SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT
2. LOCATION
3. JOB NUMBER
6. DATE (YYYYMMDD)
4. EQUIPMENT
5. SYSTEM DESIGNATION
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - EQUIPMENT DATA
9. SEPTIC TANK MANUFACTURER
10. MODEL NO
11. SERIAL NO
12. FLOW RATING GPD
13. PUMP MANUFACTURER
14. MODEL NO
15. SERIAL NO
16. FLOW RATING GPM
17. SLUDGE DIGESTER
18. MODEL NO
19. SERIAL NO
20. FLOW RATING GPD
SECTION C - VISUAL AND MECHANICAL INSPECTION
21.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
EXTERIOR OF EQUIPMENT
BRACING
COMPLETENESS OF ASSEMBLY
LABELING AND TAGGING
EQUIPMENT ROTATION
TIGHTNESS OF BOLTED CONNECTIONS
ELECTRICAL/MECHANICAL INTERLOCKS
LEAKS, LINE BLOCKAGES
SAFETY INTERLOCKS
WORKING SPACE
INSTRUMENTS
ANCHORAGE
PROPER GROUNDING
INSTALLATION AND LINE SLOPE
PROPER INSULATION
COMPARISON TO DRAWINGS
PROPER LUBRICATION
CONTROL SYSTEM
EQUIPMENT IDENTIFICATION
SECTION D - CALIBRATION AND SET POINT
22
NOTES
DESCRIPTION
SENSORS
CONTROLLERS
ACTUATORS
FLOW METERS
MONITORING EQUIPMENT
SAMPLING EQUIPMENT
METERING PUMPS
SECTION E - SYSTEM TESTS
23
PASS
FAIL
COMMENTS
NOTES
FLOW
DIGESTER OFF GAS
EFFLUENT SAMPLE TESTS
SYSTEM TEST
24. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
DA FORM 7488-R, DEC 2002
APD LC v1.00
SEWAGE TREATMENT SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT
2. LOCATION
3. JOB NUMBER
6. DATE (YYYYMMDD)
4. EQUIPMENT
5. SYSTEM DESIGNATION
7. TEST EQUIPMENT
8. TESTED BY
SECTION B - EQUIPMENT DATA
9. SEPTIC TANK MANUFACTURER
10. MODEL NO
11. SERIAL NO
12. FLOW RATING GPD
13. PUMP MANUFACTURER
14. MODEL NO
15. SERIAL NO
16. FLOW RATING GPM
17. SLUDGE DIGESTER
18. MODEL NO
19. SERIAL NO
20. FLOW RATING GPD
SECTION C - VISUAL AND MECHANICAL INSPECTION
21.
CHECK POINT
COND*
NOTES
CHECK POINT
COND*
NOTES
EXTERIOR OF EQUIPMENT
BRACING
COMPLETENESS OF ASSEMBLY
LABELING AND TAGGING
EQUIPMENT ROTATION
TIGHTNESS OF BOLTED CONNECTIONS
ELECTRICAL/MECHANICAL INTERLOCKS
LEAKS, LINE BLOCKAGES
SAFETY INTERLOCKS
WORKING SPACE
INSTRUMENTS
ANCHORAGE
PROPER GROUNDING
INSTALLATION AND LINE SLOPE
PROPER INSULATION
COMPARISON TO DRAWINGS
PROPER LUBRICATION
CONTROL SYSTEM
EQUIPMENT IDENTIFICATION
SECTION D - CALIBRATION AND SET POINT
22
NOTES
DESCRIPTION
SENSORS
CONTROLLERS
ACTUATORS
FLOW METERS
MONITORING EQUIPMENT
SAMPLING EQUIPMENT
METERING PUMPS
SECTION E - SYSTEM TESTS
23
PASS
FAIL
COMMENTS
NOTES
FLOW
DIGESTER OFF GAS
EFFLUENT SAMPLE TESTS
SYSTEM TEST
24. NOTES
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE