DA Form 7591 "Modification Work Order Fielding Plan (Mwofp)"

What Is DA Form 7591?

This is a military form that was released by the U.S. Department of the Army (DA) on February 1, 2006. The form, often mistakenly referred to as the DD Form 7591, is a military form used by and within the U.S. Army. As of today, no separate instructions for the form are provided by the DA.

Form Details:

  • A 1-page document available for download in PDF;
  • The latest version available from the Army Publishing Directorate;
  • Editable, free, and easy to use;
  • Fill out the form in our online filing application.

Download an up-to-date fillable DA Form 7591 down below in PDF format or browse hundreds of other DA Forms stored in our online database.

ADVERTISEMENT
ADVERTISEMENT

Download DA Form 7591 "Modification Work Order Fielding Plan (Mwofp)"

Download PDF

Fill PDF online

Rate (4.6 / 5) 65 votes
MODIFICATION WORK ORDER FIELDING PLAN (MWOFP)
For use of this form, see AR 750-10; the proponent agency is DCS, G-4.
AMC LIFE CYCLE MANAGEMENT COMMAND (LCMC) NAME
MODIFICATION WORK ORDER (MWO) NUMBER
TITLE
NOMENCLATURE
NATIONAL STOCK NUMBER (NSN)
LINE ITEM NUMBER (LIN)
CLASSIFICATION
FISCAL YEAR INVOLVED
This document represents an agreement for application of the modification described herein and for the necessary logistical
and administrative support to accomplish the effort.
and
Full agreement between the
is indicated by the signatures of command representatives at the close of this document.
1. PURPOSE
3. APPLICATION SCHEDULE (if applicable)
2. METHOD OF APPLICATION
4. REQUIREMENTS:
a. MAN-HOUR
b. FACILITIES
c. USER SUPPORT
d. TRAINING
e. DISPOSITION
5. MWO KIT REQUIREMENTS (Please include kits required for float, and other stocked and training equipment and weapon systems, if applicable)
6a. MODIFICATION SITE AND POC
c. E-MAIL ADDRESS
b. PHONE (DSN/COMM)
7. KIT DELIVERY: Kits are free issue (ONE TIME ONLY). Do Not Requisition the modification kits. Kits will be shipped to the Department
of Defense Activity Address Code (DODAAC) you designate in this document. The storage of kits will be the responsibility of the
modification site POC.
a. SHIP TO ADDRESS
b. SHIP TO DODAAC
c. POC
d. PHONE (DSN/COMM)
APPLICATION REPORTING PROCEDURES: The organization that applies the MWO is responsible for submitting all MWO completions into the
Modification Management Information System (MMIS) (https://www.mmis.army.mil).
8. FUNDING: The user only needs to complete the below information if funding is required, otherwise leave blank. Specifically excluded from
this estimate will be the cost for depreciation of plant equipment and cost of military labor.
a. REIMBURSEMENT INFORMATION:
b. MIPR INFORMATION:
MIPR POC
MAN-HOUR DIRECT LABOR COST
OVERHEAD INDIRECT EXPENSE
MIPR ADDRESS
CONSUMABLE MATERIAL COST
TRANSPORTATION
PHONE (DSN/COMM)
COST PER UNIT
E-MAIL ADDRESS
TOTAL NUMBER OF UNITS
FAX
TOTAL COST
b. DATE (YYYYMMDD)
9a. LCMC MWO COORDINATOR SIGNATURE
10a. INSTALLATION MWO COORDINATOR SIGNATURE
b. DATE (YYYYMMDD)
DA FORM 7591, FEB 2006
APD LC v1.01ES
MODIFICATION WORK ORDER FIELDING PLAN (MWOFP)
For use of this form, see AR 750-10; the proponent agency is DCS, G-4.
AMC LIFE CYCLE MANAGEMENT COMMAND (LCMC) NAME
MODIFICATION WORK ORDER (MWO) NUMBER
TITLE
NOMENCLATURE
NATIONAL STOCK NUMBER (NSN)
LINE ITEM NUMBER (LIN)
CLASSIFICATION
FISCAL YEAR INVOLVED
This document represents an agreement for application of the modification described herein and for the necessary logistical
and administrative support to accomplish the effort.
and
Full agreement between the
is indicated by the signatures of command representatives at the close of this document.
1. PURPOSE
3. APPLICATION SCHEDULE (if applicable)
2. METHOD OF APPLICATION
4. REQUIREMENTS:
a. MAN-HOUR
b. FACILITIES
c. USER SUPPORT
d. TRAINING
e. DISPOSITION
5. MWO KIT REQUIREMENTS (Please include kits required for float, and other stocked and training equipment and weapon systems, if applicable)
6a. MODIFICATION SITE AND POC
c. E-MAIL ADDRESS
b. PHONE (DSN/COMM)
7. KIT DELIVERY: Kits are free issue (ONE TIME ONLY). Do Not Requisition the modification kits. Kits will be shipped to the Department
of Defense Activity Address Code (DODAAC) you designate in this document. The storage of kits will be the responsibility of the
modification site POC.
a. SHIP TO ADDRESS
b. SHIP TO DODAAC
c. POC
d. PHONE (DSN/COMM)
APPLICATION REPORTING PROCEDURES: The organization that applies the MWO is responsible for submitting all MWO completions into the
Modification Management Information System (MMIS) (https://www.mmis.army.mil).
8. FUNDING: The user only needs to complete the below information if funding is required, otherwise leave blank. Specifically excluded from
this estimate will be the cost for depreciation of plant equipment and cost of military labor.
a. REIMBURSEMENT INFORMATION:
b. MIPR INFORMATION:
MIPR POC
MAN-HOUR DIRECT LABOR COST
OVERHEAD INDIRECT EXPENSE
MIPR ADDRESS
CONSUMABLE MATERIAL COST
TRANSPORTATION
PHONE (DSN/COMM)
COST PER UNIT
E-MAIL ADDRESS
TOTAL NUMBER OF UNITS
FAX
TOTAL COST
b. DATE (YYYYMMDD)
9a. LCMC MWO COORDINATOR SIGNATURE
10a. INSTALLATION MWO COORDINATOR SIGNATURE
b. DATE (YYYYMMDD)
DA FORM 7591, FEB 2006
APD LC v1.01ES