Form B9 "Application for Air Permit to Construct/Operate - Emission Source (Other)" - North Carolina

What Is Form B9?

This is a legal form that was released by the North Carolina Department of Environmental Quality - a government authority operating within North Carolina. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on September 22, 2016;
  • The latest edition provided by the North Carolina Department of Environmental Quality;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;

Download a fillable version of Form B9 by clicking the link below or browse more documents and templates provided by the North Carolina Department of Environmental Quality.

ADVERTISEMENT
ADVERTISEMENT

Download Form B9 "Application for Air Permit to Construct/Operate - Emission Source (Other)" - North Carolina

1259 times
Rate
(4.7 / 5) 76 votes
FORM B9
EMISSION SOURCE (OTHER)
B9
REVISED: 09/22/16
NCDEQ/Division of Air Quality - Application for Air Permit to Construct/Operate
EMISSION SOURCE DESCRIPTION:
EMISSION SOURCE ID NO:
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO:
______________ OF ______________
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MAX. DESIGN
REQUESTED CAPACITY
TYPE
UNITS
CAPACITY (UNIT/HR)
LIMITATION(UNIT/HR)
MATERIALS ENTERING PROCESS - BATCH OPERATION
MAX. DESIGN
REQUESTED CAPACITY
TYPE
UNITS
CAPACITY (UNIT/BATCH)
LIMITATION (UNIT/BATCH)
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR):
(BATCHES/YR):
FUEL USED:
TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR):
MAX. CAPACITY HOURLY FUEL USE:
REQUESTED CAPACITY ANNUAL FUEL USE:
COMMENTS:
Attach Additional Sheets as Necessary
FORM B9
EMISSION SOURCE (OTHER)
B9
REVISED: 09/22/16
NCDEQ/Division of Air Quality - Application for Air Permit to Construct/Operate
EMISSION SOURCE DESCRIPTION:
EMISSION SOURCE ID NO:
CONTROL DEVICE ID NO(S):
OPERATING SCENARIO:
______________ OF ______________
EMISSION POINT (STACK) ID NO(S):
DESCRIBE IN DETAIL THE PROCESS (ATTACH FLOW DIAGRAM):
MATERIALS ENTERING PROCESS - CONTINUOUS PROCESS
MAX. DESIGN
REQUESTED CAPACITY
TYPE
UNITS
CAPACITY (UNIT/HR)
LIMITATION(UNIT/HR)
MATERIALS ENTERING PROCESS - BATCH OPERATION
MAX. DESIGN
REQUESTED CAPACITY
TYPE
UNITS
CAPACITY (UNIT/BATCH)
LIMITATION (UNIT/BATCH)
MAXIMUM DESIGN (BATCHES / HOUR):
REQUESTED LIMITATION (BATCHES / HOUR):
(BATCHES/YR):
FUEL USED:
TOTAL MAXIMUM FIRING RATE (MILLION BTU/HR):
MAX. CAPACITY HOURLY FUEL USE:
REQUESTED CAPACITY ANNUAL FUEL USE:
COMMENTS:
Attach Additional Sheets as Necessary