Form AO1-370 "Suspension of Ridot Plant Approval Notification" - Rhode Island

What Is Form AO1-370?

This is a legal form that was released by the Rhode Island Department of Transportation - a government authority operating within Rhode Island. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on April 25, 2016;
  • The latest edition provided by the Rhode Island Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form AO1-370 by clicking the link below or browse more documents and templates provided by the Rhode Island Department of Transportation.

ADVERTISEMENT
ADVERTISEMENT

Download Form AO1-370 "Suspension of Ridot Plant Approval Notification" - Rhode Island

Download PDF

Fill PDF online

Rate (4.7 / 5) 12 votes
RHODE ISLAND DEPARTMENT OF TRANSPORTATION
Copy:
MATERIALS AND QUALITY ASSURANCE
Contractor
Plant Inspector
SUSPENSION OF RIDOT PLANT APPROVAL NOTIFICATION
Materials Section
MATERIALS INSPECTOR:
Plant Name:
Plant Location:
Specific Reason for Suspension:
Comments:
/
Sign
Print
Date
Time Notified
Materials Representative
CONTRACTOR REPRESENTATIVE:
As of the above date the Bituminous / Portland Cement Concrete Plant is deemed unacceptable for
supplying RIDOT contracts due to failure to meet R.I. Specifications.
This plant may be accepted for supplying RIDOT contracts upon compliance with R.I. Specification
and Approval / Notification by this section.
Resolution by Contractor:
/
Completed:
Sign
Print
Date
Contractor Representative
After signing scan and email to Materials Section and Materials Plant Inspector:
RIDOT – Materials Section
2 Capitol Hill, Rm. 018
Providence, RI 02903
Fax # 401-222-3489
MATERIALS OFFICE:
/
Sign
Print
Date
Completed Form Received By
ID# AO1 – 370
REV. 4/25/16
RHODE ISLAND DEPARTMENT OF TRANSPORTATION
Copy:
MATERIALS AND QUALITY ASSURANCE
Contractor
Plant Inspector
SUSPENSION OF RIDOT PLANT APPROVAL NOTIFICATION
Materials Section
MATERIALS INSPECTOR:
Plant Name:
Plant Location:
Specific Reason for Suspension:
Comments:
/
Sign
Print
Date
Time Notified
Materials Representative
CONTRACTOR REPRESENTATIVE:
As of the above date the Bituminous / Portland Cement Concrete Plant is deemed unacceptable for
supplying RIDOT contracts due to failure to meet R.I. Specifications.
This plant may be accepted for supplying RIDOT contracts upon compliance with R.I. Specification
and Approval / Notification by this section.
Resolution by Contractor:
/
Completed:
Sign
Print
Date
Contractor Representative
After signing scan and email to Materials Section and Materials Plant Inspector:
RIDOT – Materials Section
2 Capitol Hill, Rm. 018
Providence, RI 02903
Fax # 401-222-3489
MATERIALS OFFICE:
/
Sign
Print
Date
Completed Form Received By
ID# AO1 – 370
REV. 4/25/16