This version of the form is not currently in use and is provided for reference only. Download this version of
Form DR0021S
for the current year.
This is a legal form that was released by the Colorado Department of Revenue - a government authority operating within Colorado. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is Form DR0021S?
A: Form DR0021S is the Extension of Time for Filing Colorado Oil and Gas Severance Tax Return.
Q: What is the purpose of Form DR0021S?
A: The purpose of Form DR0021S is to request an extension for filing the Colorado Oil and Gas Severance Tax Return.
Q: Who needs to file Form DR0021S?
A: Anyone who needs more time to file their Colorado Oil and Gas Severance Tax Return can file Form DR0021S.
Q: When is Form DR0021S due?
A: Form DR0021S is due on the original due date of the Colorado Oil and Gas Severance Tax Return, which is the 20th day of the month following the calendar quarterly period.
Q: Can I file Form DR0021S after the original due date?
A: No, you must file Form DR0021S before the original due date of the Colorado Oil and Gas Severance Tax Return.
Q: Is there a penalty for late filing of Form DR0021S?
A: Yes, there is a penalty for late filing of Form DR0021S, which is $5 per day for each day the return is late, up to a maximum of $500.
Q: Can I file Form DR0021S if I have already filed my Colorado Oil and Gas Severance Tax Return?
A: No, you cannot file Form DR0021S after you have already filed your Colorado Oil and Gas Severance Tax Return.
Form Details:
Download a fillable version of Form DR0021S by clicking the link below or browse more documents and templates provided by the Colorado Department of Revenue.