"Health Office Inventory Template - Syracuse City School District"

ADVERTISEMENT
ADVERTISEMENT

Download "Health Office Inventory Template - Syracuse City School District"

259 times
Rate (4.7 / 5) 13 votes
SYRACUSE CITY SCHOOL DISTRICT
6/09
HEALTH OFFICE INVENTORY
School
School Nurse
Date ___________________
(19)
EQUIPMENT
QUANTITY
TAG #
MODEL/SERIAL #
MAKE
COLOR
CONDITION
NEED REPAIR/
OR REMARKS
UPHOLSTERY
AUDIOMETER, Auxiliary Audio Equipment
(describe)
CABINETS, Medical – upright – (specify
wood/metal)
CABINETS, Storage
CABINETS, Wardrobe
CHAIRS, Swivel desk
CHAIRS, Wooden
CHAIRS, Molded plastic
COMPUTER
PRINTER
MONITOR
STAND
COTS (recovery couch)
DESK
EYE CHART STAND
FILE CABINETS, Health Card – 5x8 (specify #
drawers, wood/metal)
FILE CABINETS, Regular, 2 drawer (specify ltr.
or legal size)
FILE CABINETS, Regular, 3 drawer
SYRACUSE CITY SCHOOL DISTRICT
6/09
HEALTH OFFICE INVENTORY
School
School Nurse
Date ___________________
(19)
EQUIPMENT
QUANTITY
TAG #
MODEL/SERIAL #
MAKE
COLOR
CONDITION
NEED REPAIR/
OR REMARKS
UPHOLSTERY
AUDIOMETER, Auxiliary Audio Equipment
(describe)
CABINETS, Medical – upright – (specify
wood/metal)
CABINETS, Storage
CABINETS, Wardrobe
CHAIRS, Swivel desk
CHAIRS, Wooden
CHAIRS, Molded plastic
COMPUTER
PRINTER
MONITOR
STAND
COTS (recovery couch)
DESK
EYE CHART STAND
FILE CABINETS, Health Card – 5x8 (specify #
drawers, wood/metal)
FILE CABINETS, Regular, 2 drawer (specify ltr.
or legal size)
FILE CABINETS, Regular, 3 drawer
FILE CABINETS, Regular, 4 drawer “
HEIGHT CHART – WALL
LAMPS, Gooseneck
LAMPS, Desk
LAMPS, Magnifying
NEBULIZER
OTOSCOPE
RACK – FOR MAGAZINES
REFRIGERATOR
SCALES –with height rods
SCREENS
STOOLS, Foot
STOOLS, Revolving
STRETCHER
STRETCHER CHAIR
TABLE, EXAMINING
TABLE, TREATMENT
TABLE, UTILITY
TABLE, WORK
TITMUS VISION TESTER
UTILITY CART
WHEELCHAIR (specify adult or pediatric size)
6/09
SUPPLIES
QUANTITY
CONDITION OR REMARKS
AIRWAYS, Hudson Lifesaver Tube
AIRWAYS, Laerdal Pocket Mask
Ambu Bag (Adult)
Ambu Bag (Child)
BASINS, Wash
BASINS, Emesis
BLANKETS (specify color)
BULLETIN BOARDS
CAN, STEP-ON
EMERGENCY KIT
EYE CHART, Alphabet
EYE CHART, "E"
EYE CHART, Symbols
EYE CHART, Cover
FLASHLIGHT
FORCEPS, Thumb
FORCEPS, Splinter
HOT WATER BOTTLE - COMBINATION UNIT
ISHIHARA TEST PLATES
JARS (for cotton, tongue blades, etc.) Glass with metal top (specify size)
OCCLUDERS
OSHA KIT
PEAK FLOW METER
PENLIGHT
PILLOWS (Specify color)
REFERENCE BOOK, INFECTION CONTROL MANUAL (RED BINDER)
REFERENCE BOOK, “GUIDELINES FOR PROTECTING STUDENT HEALTH INFORMATION”
REFERENCE BOOK, BLS FOR HEALTHCARE PROVIDERS MANUAL
REFERENCE BOOK, HEARTSAVER CPR MANUAL
REFERENCE BOOK, NYS GUIDELINES
REFERENCE BOOK, HEALTH SERVICES PROTOCOLS (WHITE BINDER)
REFERENCE BOOK, POLICY AND PROCEDURE MANUAL (GREEN BINDER)
REFERENCE BOOK, ADMINUISTRATIVE MANUAL (BLACK BINDER)
REFERENCE BOOK, “CHILDREN ASSISTED BY MEDICAL TECHNOLOGY IN EDUCATIONAL
SETTINGS: GUIDELINES FOR CARE (LIGHT BLUE BINDER)
REFERENCE BOOK, DRUG MANUAL
REFERENCE BOOK, “FIRST AID FAST”
REFERENCE BOOK, HANDBOOK OF PEDIATRICS
REFERENCE BOOK, SCHOOL HEALTH, A Guide for Health Professionals
REFERENCE BOOK, GUIDELINES FOR PROTECTING CONFIDENTIAL STUDENT HEALTH
INFORMATION
REFERENCE BOOK, FUNDAMENTALS OF BASIC LIFE SUPPORT FOR HEALTHCARE PROVIDERS
nd
REFERENCE BOOK, GULDELINES FOR CARE (Children and Youth – 2
Edition)
REFERENCE BOOK, The School Nurse’s Source Book of Individualized Healthcare Plans
REFERENCE BOOK, Children with Diabetes
SCISSORS, Bandage
SCISSORS, Cuticle
SCISSORS, Surgical
SCOLIOMETER
SPHYGMOMANOMETER (Specify Mfgr.) Adult
SPHYGMOMANOMETER (Specify Mfgr.) Pediatric
STETHOSCOPE
SYRINGE DISPOSAL CONTAINER
Page of 5