Form 740C "Cost Estimates and Loan Budget for Electric Borrowers"

What Is Form 740C?

This is a legal form that was released by the U.S. Department of Agriculture - Rural Development on February 5, 2004 and used country-wide. As of today, no separate filing guidelines for the form are provided by the issuing department.

Form Details:

  • Released on February 5, 2004;
  • The latest available edition released by the U.S. Department of Agriculture - Rural Development;
  • Easy to use and ready to print;
  • Yours to fill out and keep for your records;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form 740C by clicking the link below or browse more documents and templates provided by the U.S. Department of Agriculture - Rural Development.

ADVERTISEMENT
ADVERTISEMENT

Download Form 740C "Cost Estimates and Loan Budget for Electric Borrowers"

745 times
Rate (4.4 / 5) 52 votes
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a
valid OMB control number. The valid OMB control number for this information collection is 0572-0032. The time required to complete this information collection is estimated to average
10 hours per response, including the time for reviewing instrcutions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
collection of information.
This data will be used by RUS to review your financial situation. Your response is required (7 USC 901 et seq.) and is not confidential.
Form Approved
OMB No. 0572-0032
USDA-RUS
COST ESTIMATES AND LOAN BUDGET
BORROWER AND LOAN DESIGNATION
FOR ELECTRIC BORROWERS
To: U.S. Dept. of Agriculture, RUS, Washington, D. C. 20250
COST ESTIMATES AS OF:
(Month, Year)
INSTRUCTIONS
See tabs "Pg1 Instr" through "Pg4 Instr"
LOAN PERIOD
YEARS
SECTION A. COST ESTIMATES
BORROWER'S
1. DISTRIBUTION
COST ESTIMATES
RUS USE ONLY
100
a. New Line: (Excluding Tie-Lines)
Construction
Consumers
Miles
101
Underground
102
Overhead
Total Consumers. . . . . . . . . . . . .
Total Miles . . . . . . . . . . . . . . . . . . . . . .
Less Contributions . . . . . . . . . . . . . . . . . . . . . . . . . . .
Subtotal (New Line - code 100). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
200
b. New Tie-Lines
Line Designation
Miles
201
202
203
204
205
206
Subtotal from page 1A . . . . . . . . . . . . . . . . . . . . . . Miles . . . . . . . . . . . . . . . . . . .
Subtotal (Includes subtotals from pages 1A). . . . . . Miles . . . . . . . . . . . . . . . . .
300
c. Conversion and Line Changes
Line Designation
Miles
301
302
303
304
305
306
307
308
309
310
Subtotal from page 1A . . . . . . . . . . . . . . . . . . . . . . . . . Miles . . . . . . . . . . . . . . . . . .
Subtotal . (Includes subtotals from pages 1A) . . . . . Miles . . . . . . . . . . . . . . . . . .
400
d. New Substations, Switching Stations, Metering Points, etc.
Station Designation
kVA
kV to kV
401
402
403
404
405
406
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(Rev. 10-01, V2, 2/5/04)
RUS FORM 740c
PAGE 1 OF 4 PAGES
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a
valid OMB control number. The valid OMB control number for this information collection is 0572-0032. The time required to complete this information collection is estimated to average
10 hours per response, including the time for reviewing instrcutions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
collection of information.
This data will be used by RUS to review your financial situation. Your response is required (7 USC 901 et seq.) and is not confidential.
Form Approved
OMB No. 0572-0032
USDA-RUS
COST ESTIMATES AND LOAN BUDGET
BORROWER AND LOAN DESIGNATION
FOR ELECTRIC BORROWERS
To: U.S. Dept. of Agriculture, RUS, Washington, D. C. 20250
COST ESTIMATES AS OF:
(Month, Year)
INSTRUCTIONS
See tabs "Pg1 Instr" through "Pg4 Instr"
LOAN PERIOD
YEARS
SECTION A. COST ESTIMATES
BORROWER'S
1. DISTRIBUTION
COST ESTIMATES
RUS USE ONLY
100
a. New Line: (Excluding Tie-Lines)
Construction
Consumers
Miles
101
Underground
102
Overhead
Total Consumers. . . . . . . . . . . . .
Total Miles . . . . . . . . . . . . . . . . . . . . . .
Less Contributions . . . . . . . . . . . . . . . . . . . . . . . . . . .
Subtotal (New Line - code 100). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
200
b. New Tie-Lines
Line Designation
Miles
201
202
203
204
205
206
Subtotal from page 1A . . . . . . . . . . . . . . . . . . . . . . Miles . . . . . . . . . . . . . . . . . . .
Subtotal (Includes subtotals from pages 1A). . . . . . Miles . . . . . . . . . . . . . . . . .
300
c. Conversion and Line Changes
Line Designation
Miles
301
302
303
304
305
306
307
308
309
310
Subtotal from page 1A . . . . . . . . . . . . . . . . . . . . . . . . . Miles . . . . . . . . . . . . . . . . . .
Subtotal . (Includes subtotals from pages 1A) . . . . . Miles . . . . . . . . . . . . . . . . . .
400
d. New Substations, Switching Stations, Metering Points, etc.
Station Designation
kVA
kV to kV
401
402
403
404
405
406
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(Rev. 10-01, V2, 2/5/04)
RUS FORM 740c
PAGE 1 OF 4 PAGES
COST ESTIMATE AND LOAN BUDGET FOR ELECTRIC BORROWERS
BORROWER AND LOAN DESIGNATION
SECTION A. COST ESTIMATES (Page 1 Continuation Sheet)
BORROWER'S
RUS USE ONLY
COST ESTIMATES
200
b. New Tie-Lines (Continued)
Line Designation
Miles
207
208
209
210
211
212
213
214
215
216
Miles . . . . . . . . . . . . . . . . . . . . .
Subtotal (transfers to page 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
300
c. Conversion and Line Changes(Continued)
Line Designation
Miles
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
Subtotal (transfers to page 1). . . . . . . . . . . . . . . . . . . . . Miles
RUS Form 740c
(Rev. 10-01, V2, 2/5/04)
Page 1A of 4
BORROWER AND LOAN DESIGNATION
SECTION A. COST ESTIMATES (cont.)
BORROWER'S
RUS USE ONLY
COST ESTIMATES
500
e. Substation, Switching Station, Metering Point Changes
Station Designation
Description of Changes
501
502
503
504
505
506
507
508
509
Subtotal From Page 2A . . . . . . . . . . . . . . . . . . .
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
600
f. Miscellaneous Distribution Equipment
601
(1) Transformers and Meters
Construction
Transformers
Meters
Underground
Overhead
Subtotal code 601 . . . (included in total of all 600 codes below)
602
(2) Sets of Service Wires to increase Capacity
603
(3) Sectionalizing Equipment
604
(4) Regulators
605
(5) Capacitors
606
(6) Ordinary Replacements
(7)
(8)
(9)
(10)
(11)
Subtotal ALL 600 codes . . . . . . . . . . . . . . . . . . . . . . . . .
700
g. Other Distribution Items
701
(1) Engineering Fees
702
(2) Security Lights
703
(3) Reimbursement of General Funds (see attached)
704
(4)
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TOTAL DISTRIBUTION. . . . . . . . .
800
2. Transmission
a. New Line
Line Designation
Voltage
Wire Size
Miles
801
802
803
804
805
806
807
808
809
810
Subtotal - Miles from Page 2A . . . . . . . . . .
Total Miles . . . . . . . . . . . . .
Subtotal From Page 2A . . . . . . . . . . . . . . . . . . . . . . . .
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RUS Form 740c
(Rev. 10-01, V2, 2/5/04)
PAGE 2 OF 4 PAGES
COST ESTIMATE AND LOAN BUDGET FOR ELECTRIC BORROWERS
BORROWER AND LOAN DESIGNATION
SECTION A. COST ESTIMATES (Page 2 Continuation Sheet)
BORROWER'S
RUS USE ONLY
COST ESTIMATES
500
e. Substation, Switch Stations, Metering Point Changes (Continued)
Station Designation
kVA
kV TO kV
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
Subtotal (transfers to page 2) . . . . . . . . . . . . . . . . . . . .
800 a. New Line (Continued)
Line Designation
Voltage
Wire Size
Miles
811
812
813
814
815
816
817
818
819
820
Subtotal - Miles(transfers to page 2). .
Subtotal (transfers to page 2). . . . . . . . . . . . . . . . . . . . .
RUS Form 740c
(Rev. 10-01, V2, 2/5/04)
Page 2A of 4
COST ESTIMATE AND LOAN BUDGET FOR ELECTRIC BORROWERS
BORROWER AND LOAN DESIGNATION
SECTION A. COST ESTIMATES
(cont.)
BORROWER'S
RUS USE ONLY
COST ESTIMATES
900
b. New Substation, Switching Station, etc.
Station Designation
kVA
kV TO kV
901
902
903
904
905
906
907
908
Subtotal From Page 3A . . . . . . . . . . . . . . . . . . . . . . . .
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1000 c. Line and Station Changes
Line/Station Designation
Description of Changes
1001
1002
1003
1004
1005
1006
1007
1008
1009
Subtotal From page 3A through 3C . . . . . . . . . . . . . . . . . .
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1100 d. Other Transmission Items
1101
(1)
R/W Procurement
1102
(2)
Engineering Fees
1103
(3)
Reimbursement of General Funds (see schedule)
1104
(4)
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TOTAL TRANSMISSION. . . . . . . . . . . .
1200 3. GENERATION (including Step-up Station at Plant)
1201
a Fuel
Nameplate Rating
kW
1202
b.
TOTAL GENERATION. . . . . . . . . . . . . .
1300 4. HEADQUARTERS FACILITIES
1301
a. New or additional Facilities
(Attach RUS Form 740g)
1302
b.
TOTAL HEADQUARTERS FACILITIES . . . . . . . . . . . . . . . .
RUS Form 740c
(Rev. 10-01, V2, 2/5/04)
PAGE 3 OF 4 PAGES
Page of 14