DA Form 7307-r "Cost Estimating Worksheet - Facility Alteration"

What Is DA Form 7307-r?

This is a military form that was released by the U.S. Department of the Army (DA) on April 1, 1994. The form, often mistakenly referred to as the DD Form 7307-r, is a military form used by and within the U.S. Army. As of today, no separate instructions for the form are provided by the DA.

Form Details:

  • A 1-page document available for download in PDF;
  • The latest version available from the Army Publishing Directorate;
  • Editable, free, and easy to use;

Download an up-to-date fillable DA Form 7307-r down below in PDF format or browse hundreds of other DA Forms stored in our online database.

ADVERTISEMENT
ADVERTISEMENT

Download DA Form 7307-r "Cost Estimating Worksheet - Facility Alteration"

1172 times
Rate (4.3 / 5) 186 votes
COST ESTIMATING WORKSHEET - FACILITY ALTERATION
For use of this form, see TM 5-800-4; the proponent agency is USACE
2. PROJECT TITLE
3. FY
1. PROJECT NUMBER
4. BUILDING NUMBER
5. LOCATION
6. HISTORICAL
YES
NO
7. FACILITY TYPE
8. CATEGORY CODE
9. FACILITY SIZE
10. AREA TO BE
11. FUND TYPE
(SF)
ALTERED (SF)
(MCA/OMA/AFH)
15. CONST START
13. BASIS OF ESTIMATE
14. MONTHS
12. ESTIMATOR/OFFICE/DATE
16. REMOVAL/DEMOLITION PORTION OF PRIMARY FACILITY
PERCENT OF
PERCENT OF
LABOR
SYSTEM PERCENT
TOTAL PERCENT
SYSTEM
LABOR TO
PERCENT TO
OF TOTAL
REMOVAL
BUILDING SYSTEM WORK BREAKDOWN
REMOVE
INSTALL
ALTERED
a
b
c
d
e
01 - SUBSTRUCTURE
02 - SUPERSTRUCTURE
03 - ROOFING
04 - EXTERIOR CLOSURE
05 - INTERIOR CONSTRUCTION
06 - INTERIOR FINISHES
07 - SPECIALTIES
08 - PLUMBING
09 - H.V.A.C.
10 - SPECIAL MECHANICAL
11 - ELECTRICAL
12 - SPECIAL ELECTRICAL
13 - EQUIPMENT
14 - CONVEYING SYSTEMS
17. RDF
18. FACILITY TYPE
19. CATEGORY CODE
20. AREA TO BE ALTERED (SF)
21. REPLACEMENT/NEW PORTION OF PRIMARY FACILITY
PERCENT OF SYSTEM
SYSTEM PERCENT
TOTAL PERCENT
REPLACED
OF TOTAL
REPLACED
BUILDING SYSTEM WORK BREAKDOWN
a
b
c
01 - SUBSTRUCTURE
02 - SUPERSTRUCTURE
03 - ROOFING
04 - EXTERIOR CLOSURE
05 - INTERIOR CONSTRUCTION
06 - INTERIOR FINISHES
07 - SPECIALTIES
08 - PLUMBING
09 - H.V.A.C.
10 - SPECIAL MECHANICAL
11 - ELECTRICAL
12 - SPECIAL ELECTRICAL
13 - EQUIPMENT
14 - CONVEYING SYSTEMS
22. RNF
23. CONSTRUCTION LIMITATION ADJUSTMENTS
24. PERCENT TO ADD
a.
DUST PROTECTION FOR ADJACENT WORK AREAS
b.
LIMITED USE OF EQUIPMENT (NOISE/POWER LIMITATIONS)
c.
LIMITED STORAGE OF CONSTRUCTION MATERIALS
d.
PROTECTION OF COMPLETED WORK
e.
SHIFT WORK
25. SAF
APD LC v1.00
DA FORM 7307-R, APR 1994
COST ESTIMATING WORKSHEET - FACILITY ALTERATION
For use of this form, see TM 5-800-4; the proponent agency is USACE
2. PROJECT TITLE
3. FY
1. PROJECT NUMBER
4. BUILDING NUMBER
5. LOCATION
6. HISTORICAL
YES
NO
7. FACILITY TYPE
8. CATEGORY CODE
9. FACILITY SIZE
10. AREA TO BE
11. FUND TYPE
(SF)
ALTERED (SF)
(MCA/OMA/AFH)
15. CONST START
13. BASIS OF ESTIMATE
14. MONTHS
12. ESTIMATOR/OFFICE/DATE
16. REMOVAL/DEMOLITION PORTION OF PRIMARY FACILITY
PERCENT OF
PERCENT OF
LABOR
SYSTEM PERCENT
TOTAL PERCENT
SYSTEM
LABOR TO
PERCENT TO
OF TOTAL
REMOVAL
BUILDING SYSTEM WORK BREAKDOWN
REMOVE
INSTALL
ALTERED
a
b
c
d
e
01 - SUBSTRUCTURE
02 - SUPERSTRUCTURE
03 - ROOFING
04 - EXTERIOR CLOSURE
05 - INTERIOR CONSTRUCTION
06 - INTERIOR FINISHES
07 - SPECIALTIES
08 - PLUMBING
09 - H.V.A.C.
10 - SPECIAL MECHANICAL
11 - ELECTRICAL
12 - SPECIAL ELECTRICAL
13 - EQUIPMENT
14 - CONVEYING SYSTEMS
17. RDF
18. FACILITY TYPE
19. CATEGORY CODE
20. AREA TO BE ALTERED (SF)
21. REPLACEMENT/NEW PORTION OF PRIMARY FACILITY
PERCENT OF SYSTEM
SYSTEM PERCENT
TOTAL PERCENT
REPLACED
OF TOTAL
REPLACED
BUILDING SYSTEM WORK BREAKDOWN
a
b
c
01 - SUBSTRUCTURE
02 - SUPERSTRUCTURE
03 - ROOFING
04 - EXTERIOR CLOSURE
05 - INTERIOR CONSTRUCTION
06 - INTERIOR FINISHES
07 - SPECIALTIES
08 - PLUMBING
09 - H.V.A.C.
10 - SPECIAL MECHANICAL
11 - ELECTRICAL
12 - SPECIAL ELECTRICAL
13 - EQUIPMENT
14 - CONVEYING SYSTEMS
22. RNF
23. CONSTRUCTION LIMITATION ADJUSTMENTS
24. PERCENT TO ADD
a.
DUST PROTECTION FOR ADJACENT WORK AREAS
b.
LIMITED USE OF EQUIPMENT (NOISE/POWER LIMITATIONS)
c.
LIMITED STORAGE OF CONSTRUCTION MATERIALS
d.
PROTECTION OF COMPLETED WORK
e.
SHIFT WORK
25. SAF
APD LC v1.00
DA FORM 7307-R, APR 1994