DD Form 2734 / 1 Contract Performance Report Format 1 - Work Breakdown Structure

DD Form 2734 / 1 Contract Performance Report Format 1 - Work Breakdown Structure

What Is DD Form 2734/1?

This is a form that was released by the U.S. Department of Defense (DoD) on April 1, 2005. The form, often mistakenly referred to as the DA Form 2734/1 , is a military form used by and within the U.S. Army. As of today, no separate instructions for the form are provided by the DoD.

FAQ

Q: What is the DD Form 2734/1?A: The DD Form 2734/1 is a Contract Performance Report Format 1.

Q: What is the purpose of the DD Form 2734/1?A: The purpose of the DD Form 2734/1 is to provide a Work Breakdown Structure (WBS) for contract performance reporting.

Q: What is a Work Breakdown Structure (WBS)?A: A Work Breakdown Structure (WBS) is a hierarchical representation of the work to be performed in a project or contract, organized into defined levels and elements.

Q: Why is a Work Breakdown Structure (WBS) important for contract performance reporting?A: A Work Breakdown Structure (WBS) helps to organize and track the progress of work, making it easier to assess the performance of a contract.

Q: What information is included in the DD Form 2734/1?A: The DD Form 2734/1 includes information such as the contract number, reporting period, work breakdown structure (WBS) elements, and the percentage of completion for each element.

Q: Who is responsible for filling out the DD Form 2734/1?A: The contractor is responsible for filling out the DD Form 2734/1.

Q: Are there any other formats of the Contract Performance Report?A: Yes, there are other formats of the Contract Performance Report, such as Format 2 and Format 3, which provide different levels of detail in reporting.

Q: Is the DD Form 2734/1 mandatory for contract performance reporting?A: It depends on the specific contract requirements. Some contracts may require the use of the DD Form 2734/1, while others may have different reporting requirements.

Q: How often should the DD Form 2734/1 be submitted?A: The frequency of submission for the DD Form 2734/1 is typically specified in the contract requirements, but it is commonly submitted on a monthly basis.

ADVERTISEMENT

Form Details:

  • A 1-page document available for download in PDF;
  • The latest version available from the Executive Services Directorate;
  • Editable, printable, and free to use;
  • Fill out the form in our online filing application.

Download an up-to-date fillable DD Form 2734/1 down below in PDF format or browse hundreds of other DoD Forms compiled in our online library.

Download DD Form 2734 / 1 Contract Performance Report Format 1 - Work Breakdown Structure

4.4 of 5 (19 votes)
  • DD Form 2734 / 1 Contract Performance Report Format 1 - Work Breakdown Structure, Page 1
ADVERTISEMENT