Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida

Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida

What Is Form DH8002-DCHP?

This is a legal form that was released by the Florida Department of Health - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form DH8002-DCHP?A: Form DH8002-DCHP is a notice that is used to indicate the in-progress installation of a radon mitigation system in Florida.

Q: Who needs to file Form DH8002-DCHP?A: The contractor responsible for installing the radon mitigation system needs to file Form DH8002-DCHP with the Florida Department of Health.

Q: What information is required on Form DH8002-DCHP?A: Form DH8002-DCHP requires information about the contractor, property owner, radon system location, and installation details.

Q: When should Form DH8002-DCHP be filed?A: Form DH8002-DCHP should be filed before the installation of the radon mitigation system begins.

Q: Is there a fee associated with filing Form DH8002-DCHP?A: No, there is no fee for filing Form DH8002-DCHP.

ADVERTISEMENT

Form Details:

  • Released on February 1, 2016;
  • The latest edition provided by the Florida Department of Health;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form DH8002-DCHP by clicking the link below or browse more documents and templates provided by the Florida Department of Health.

Download Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida

4.6 of 5 (12 votes)
  • Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida

    1

  • Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida, Page 2

    2

  • Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida, Page 1
  • Form DH8002-DCHP Notice of in Progress Radon Mitigation System Installation - Florida, Page 2
Prev 1 2 Next
ADVERTISEMENT